• 제목/요약/키워드: Project System

검색결과 6,677건 처리시간 0.038초

Valuation of Benefits from the Adoption of Project Information Management System

  • Kyong Ju Kim;Kyoungmin Kim;Ki Yong Kang;Geon Hee Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1548-1552
    • /
    • 2009
  • In the construction industry, IT has been an alternative for the enhancement of productivity and technical advances through a paradigm shift. While it has been recognized that the IT system will have a substantial influence on the industry, a quantitative valuation has been very limited. This paper has chosen EVMS (Earned Value Management System), which supports the integrated management of cost and schedule by utilizing IT tools, and which is the largest trend in the construction IT industry in Korea, in order to suggest an analysis model for the valuation of IT. The CVM (Contingent Valuation Method) is used to quantitatively measure intangible value of IT application. Then, a valuation and analysis model were suggested for the quantitative valuation of the effect of IT adoption. In terms of willingness to pay for EVMS, the expected benefits from the adoption of EVMS were US$ 584.52 per man annually. This research should be helpful for construction companies evaluating their investment to Project Management Information System.

  • PDF

X77-Design and Construction of a Computer System

  • 박철희;최광무;이전영;이용석;송상훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1979년도 하계 전자.전기연합학술발표회논문집
    • /
    • pp.94-103
    • /
    • 1979
  • A 16-bit computer system, called X77, is designed and constructed using bit-slice micro-slice microprogrammable. A cross-assembler/simulator software has been implemented and used to debug the entire system design including actual microcodes prior to hardware realizations. Prototypes of X77 CPU, I/O processing subsystem and their interconnections have been constructed and are in the process of being debugged.

  • PDF

BIM 기반 건설 프로젝트의 협업 지원 시스템 (A Building Information Modeling based Collaboration Supporting System for Construction Project)

  • 윤수원;진상윤;최철호;이강;신태홍
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.476-481
    • /
    • 2008
  • The objective of this paper is to propose a conceptual framework of a BIM based collaboration supporting System, called Construction Project Life Cycle Management (CPLM). The framework of CPLM is proposed by reflecting the characteristics of the AEC industry such as deliverly methods, process, fragmentation, etc.. And it is a system intended to help project participants make better decisions and to facilitate coordination between various stakeholders in a project by providing virtual collaboration environment.

  • PDF

시스템엔지니어링 프로세스에 따른 열차시스템사양서 개발 (The Train System Specification Development Using Systems Engineering Process)

  • 한성호;최성규;이중윤
    • 시스템엔지니어링워크숍
    • /
    • 통권1호
    • /
    • pp.134-139
    • /
    • 2003
  • The mission of tilting train development project is enhancing the speed of transportation of railway passenger using existing infrastructure. The threat of this project is the tilting technology is newly incorporated to this project. To overcome the threat this project incorporate systems engineering technology to development tilting train system. The systems engineering process, which was used in this project, was performed in accordance with systems engineering standard EIA632. This paper shows the systems engineering technology which was used to develop the tilting train system specification. This paper also shows the requirement template which was developed to communicate and synthesis various specialty engineering.

  • PDF

금강 참게목장화 사업의 사회-경제 통합모델링 (Incorporating Social & Economic Factors for the Pasture Project in Kum River)

  • 전대욱
    • 한국시스템다이내믹스연구
    • /
    • 제12권1호
    • /
    • pp.59-74
    • /
    • 2011
  • This article deals with an economic evalutation of the 'Pasture Project of Kum River', which is the farming plan of mitten crabs in a stream of it. An augmented model of social capital is based on the past ecological-economic system dynamics model and elaborated further with suggestions of social capital literature. During the modeling process a chain diagram of causal relations and its relevant mathematical equations are presented for simulating the project performance, and the simulation results are provided to contrast the dynamic behaviors of the former ecological-economic model with ones of the new model incorporating social capital. The results indicate that an increase in the economic benefit of the project could happen in case of considering the process of social capital accumulation around the case area, which can be regarded as a remarkable trial to approve the common confidence in the role of social capital to enhance an economic achievement.

  • PDF

분해접근과 옵션사고에 기반한 기술개발 프로젝트의 평가방법 (Evaluation Method of Technology Development Project based on Decomposition Approach and Options Thinking)

  • 조규갑;문병근
    • 기술혁신학회지
    • /
    • 제8권3호
    • /
    • pp.1117-1138
    • /
    • 2005
  • Due to the increasing importance of technology development project evaluation, many evaluation methods have been developed. However, most project evaluation methods are not directly applicable for evaluating performance improvement projects in a manufacturing system. It is due to the fact that the existing project evaluation methods do not deal with the performance evaluation of the system. This paper deals with performance measurement model of a manufacturing system based on decomposition method and evaluation method for technology development project based on options thinking. A case example is discussed to illustrate the process of the proposed evaluation method.

  • PDF

ERP 시스템 가격산정에 영향을 주는 변수에 관한 연구 (A Study of Factors Influencing the Price of ERP System in its Implementation)

  • 이재정
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제12권1호
    • /
    • pp.1-17
    • /
    • 2003
  • ERP is a topic of currency in MIS circle. Numerous organization have developed their information systems using many kinds of ERP packages such as Oracle, SAP R/3, uniERP, etc. However, the pricing methodology of ERP systems is not yet established in a proper way. This paper attempts to investigate factors influencing the price of ERP system. Thirty eight ERP consulting firms participated in this research project. Based on the data from ERP consulting firms, price of ERP systems basically consist of package cost, consulting fee, and customizing expense. The results of this research project are finding factors affecting above three parts that consist price of ERP system. This paper found that factors influencing package price are number of modules, number of users, the degree of package reliability. The factors affecting consulting fee are the degree of project specialty, level of consultants. Finally the factors influencing customizing cost are the degree of project difficulty, project time.

  • PDF

시스템엔지니어링 표준(EIA632)에 의한 틸팅열차 시스템 사양서 개발 (The Express Tilting Train System Specification Development Using Systems Engineering Standard-EIA632)

  • 이중윤;신광복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.525-532
    • /
    • 2003
  • The mission of tilting train development project is enhancing the speed of transportation of railway passenger using existing infrastructure. The threat of this project is the tilting technology is newly incorporated to this project. To overcome the threat this project incorporate systems engineering technology to development tilting train system. The systems engineering process, which was used in this project, was performed in accordance with systems engineering standard EIA632. This paper shows the systems engineering technology which was used to develop the tilting train system specification. This paper also shows the requirement template which was developed to communicate and synthesis various specialty engineering.

  • PDF

Status and test results of the HPRF system for PEFP 20MeV linear accelerator

  • Seol, K.T.;Kwon, H.J.;Kim, H.S.;Song, Y.G.;Cho, Y.S.
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 2005년도 추계학술발표회
    • /
    • pp.915-916
    • /
    • 2005
  • The high power RF system for the PEFP 20MeV proton accelerator composed of the 3MeV RFQ and the 20MeV DTL has been installed. The klystron for the RFQ was tested up to 600kW and operated routinely to drive the RFQ in a pulse mode operation. The klystron for the DTL which consists of 4 tanks was tested up to 800kW in pulse mode operation. The pulse width and repetition rate was 50${\mu}s$ and 1Hz respectively. The high power RF system has been operated to drive each accelerating structure and will be used to accelerate 20MeV proton beam.

  • PDF

AUTOMATED PROJECT CONTROL SYSTEM FOR STEEL PROJECTS

  • Reza Azimi;SangHyun Lee;Simaan M. AbouRizk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.479-486
    • /
    • 2009
  • This paper presents an integrated real-time monitoring and control framework that facilitates decision making by enabling project managers to take corrective actions right after any deviation happens and mitigate the damage to the ongoing steel projects. The proposed framework employs the High Level Architecture (HLA) as its infrastructure. It is composed of several individual monitoring and control components called "Federates," which cooperate and interact with each other through the Real-time Infrastructure (RTI). Reusability, interoperability and extendibility of federates in the proposed project control system make this a unique system.

  • PDF