• Title/Summary/Keyword: Project Support Processes

Search Result 120, Processing Time 0.026 seconds

Business Processes Automation and Analysis Techniques by Using BPM and SOA (BPM과 SOA기반의 비즈니스 프로세스 자동화와 분석기법)

  • Lee, Chung-Hun;Lee, Jong-Hak;Seo, Jeong-Man;Cho, Wan-Sup
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.4
    • /
    • pp.171-178
    • /
    • 2009
  • Recently, a combination of Business Process Management (BPM) and Service Oriented Architecture (SOA) is being recommended as the best approach for automating large business systems. And the need to create meaningful information from daily operational data is increased today. In this paper, we propose a methodology for automating business processes based on the BPM-SOA convergence trend and verify the methodology by implementing the project management business process. BPM-SOA convergence provides higher extensibility and productivity due to the loosely coupled system construction and maintenance. The system has good properties for frequent process changes and reuse of duplicate processes. We then analyze extensibility of the system as new business processes are added to the existing system. We finally analyze the data generated by BPM by using SAP business intelligence to support management's decision making and strategy. Business intelligence provides not only useful data for business decisions but also chance to optimize the business processes.

Reliability Assessment of Tunnel Support Systems Using a Probability-Based Method (확률론적 기법을 이용한 터널 지보시스템의 신뢰성 평가)

  • Park, Do-Hyun;Park, Eui-Seob;Song, Won-Kyong;Ryu, Dong-Woo
    • Tunnel and Underground Space
    • /
    • v.20 no.1
    • /
    • pp.39-48
    • /
    • 2010
  • The present study developed a program which can assess the reliability of tunnel support systems based on a probability-based method. The developed program uses FLAC2D as a solver, and can automatically execute all the processes, associated with numerical and probabilistic analysis. Since a numerical analysis, which models the ground, requires a significant calculation time, it is actually impossible to apply simulation-based methods to probabilistic assessment on the reliability of tunnel support systems. Therefore, the present study used a point estimate method, which is efficient for probabilistic analysis since the method can significantly reduce the number of samples when compared with the simulation-based method. The developed program was applied to a tunnel project, and the results were compared with those through a deterministic approach. From the comparison, it was identified that a probabilistic approach can quantitatively assess the reliability of tunnel support systems based on probability of failure and can be used as a tool for decision making in tunnel support designs.

Front End Planning Tool (FEPT) Based on an Electronic Process Management

  • Safa, Mahdi;Haas, Carl T.;Hipel, Keith W.;Gray, Joel
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.1-12
    • /
    • 2013
  • Research indicates that good front-end planning (FEP) results in the achievement of higher levels of project performance. By facilitating collaboration among stakeholders in diverse locations with the use of workflow-enabled processes, such pressures can be reduced, and the overall process and results of FEP can be improved. With these goals, a front-end planning tool (FEPT) has been developed as support for owners and major contractors who are engaged in front-end planning. This paper presents the new FEPT and describes how it has been used for construction megaprojects in the nuclear power, oil and gas, and mining industries. The paper begins with the definitions related to and an explanation of the general process for implementing and applying the FEPT and then describes and analyzes how the FEPT was applied in case study projects in order to test its validity. The results indicate that the FEPT increases the efficiency and effectiveness of front-end planning for the megaprojects studied and that it has the potential to produce similar results for other megaprojects.

The Application of Project control Techniques to Process Control: The Effect of Temporal Information on Human Monitoring Tasks

  • Parush, A.;Shtub, A.;Shavit, D.
    • Transactions on Control, Automation and Systems Engineering
    • /
    • v.3 no.1
    • /
    • pp.10-14
    • /
    • 2001
  • We studied the use of time-related information, with and without prediction, to support human operators performing moni-toring and control tasks in the process. Based on monitoring and control techniques used for Project Management we developed a display design for the process industries. A simulated power plant was used to test the hypothesis that availability of predictions along with information on past trends can improve the performances of the human operator handling faults. Several designs of dis-plays were tested in the experiment in which human operators had to detect and handle two types of faults(local and systems wide) in the simulated electricity generation process. Analysis of the results revealed that temporal data, with and without prediction, signifi-cantly reduced response time. Our results encourage the integration of temporal information and prediction in displays used for the control processes to enhance the capabilities of the human operators. Based on the analysis we proposed some guidelines for the de-signer of the human interface of a process control system.

  • PDF

Status of Czech Low and Intermediate Radioactive Waste Management in the Context of European Development

  • Trtilek, Radek;Havlova, Vaclava;Podlaha, Josef;Svoboda, Karel;Otcovsky, Tomas
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.19 no.1
    • /
    • pp.29-38
    • /
    • 2021
  • The article summarises the status and competence of UJV Rez, a. s. (up to 2012, the Nuclear Research Institute Rez, Czech Republic) in the field of radioactive waste (RAW) management as a company managing of 95% of institutional radioactive wastes in Czech Republic. UJV Rez a. s. has been one of the Czech Republic's key research and engineering institutions in the field of nuclear energy production since 1955. The company processes and conditions prior to storage 95% of so-called institutional RAW and is the principal partner of the state with respect to the research support of the Czech deep geological repository development project. UJV Rez a. s. boasts its own accredited radiochemical analytical test laboratory, unique of its kind in the Czech Republic. Of equal importance is UJV Rez's active participation in a range of international organisations and associations and its involvement in wide range of international projects, and so as European projects. One of them is EU funded project PREDIS: Pre-disposal management of radioactive wastes, that has started at September 2020, focused on the field of low level radioactive waste (LLW) and intermediate level radioactive waste (ILW) pre-disposal.

Adaptive Framework for Designing R&D Project Management Process Using Cloud Computing Technology (클라우드 컴퓨팅 기술을 활용한 적응형 연구개발 프로젝트 관리 프로세스 설계 프레임워크)

  • Shin, Kwang-Sup
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.4
    • /
    • pp.25-43
    • /
    • 2013
  • Two of the most important changes in the global market can be represented with Hyper-connection and Glocalization. To cope with these changes and secure the competitive advantages, it is essential to develop the standard organization, policy, processes and criteria for service management. In addition, the service management system is required to effectively support the R&D project management. In this research, an adaptive framework and system architecture for designing R&D project management process using cloud computing has been introduced. With the proposed system, it is able to overcome the limitations of traditional service management and treat the demand from the market in agility. Moreover, it may be possible to present more value than customers want and secure the competitive advantages in the global market with the proposed system.

A Model for Construction Data Integration Based on Growth of Construction Object throughout the Overall Project Phases (프로젝트 단계별 건설객체의 성장에 근거한 건설데이터 통합 모델)

  • Kim Woo-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.143-150
    • /
    • 2003
  • Using integrated construction project data is necessary for efficient management of construction projects. Recently IFC(Industry Foundation Classes) are proposed as integration method based on interoperability and there have been several cases of system integration based on IFC. The concept of interoperability proposes the construction object as data sharing protocol between systems for system integration and independence of each system. This study proposes system development strategy by phases considering work scope and procedure of processes based on the concept of interoperability. This is proposed to overcome tendency of developing system which doesn't support real work processes as result of inclining to the format of IFC instead of properly using IFC's interoperability concept to real work scope and procedure.

  • PDF

Applying and Implementation of Learning Organization with Action Learning : D Corporation Case (액션러닝을 활용한 D기업의 학습조직 적용과 성과에 관한 연구)

  • Yum, Ji-Hwan;Park, Sang-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.11
    • /
    • pp.3390-3398
    • /
    • 2009
  • The knowledge management starts from the enhancement of learning capability in the members of the organization. The strategic change into the learning organization should be aligned with the change of organizational strategy, structure and processes. The study employed action learning methodology to transform the traditional organization into the learning one. The learning organization project has been successful thanks to the members' zeal and consensus to change the processes. However, not every learning team has been so successful. Some cases complained time consuming where others expect to be helpful for their incentives. The researchers concluded that the most important point for success of the learning organization project should be the support of top management.

Knowledge Management of Hospital Clinical Support Department - A Case Study of a Laboratory in S Hospital's Eye Center - (병원 진료지원부서의 역량강화를 위한 지식경영 : S병원 안센터검사실 사례연구)

  • Rhee, Shang-Ro;Kim, Kwang-Jum;Lee, Hyun-Ju
    • Korea Journal of Hospital Management
    • /
    • v.18 no.4
    • /
    • pp.113-130
    • /
    • 2013
  • The aim of this article is to propose a framework for standardization of knowledge based on a case study of clinical operation to guide initial hospital knowledge management projects. Both quantitative and qualitative data for the project from 2009 through 2012 were collected for analysis. In a study of knowledge management project of a lab in S Hospital's Eye Center, this research examines the standardization of operational knowledge for competence enhancement of the lab. The lab defined and standardized the knowledge concern of the lab operation and the in-group from 2008. Organizations are often unaware of the potential value of tacit knowledge in both clinical and administrative area. The main finding from the case study is that analysis of such tacit knowledge of a lab in a hospital can be transformed into explicit knowledge for organizational capabilities such as improved quality, responsiveness and competitive advantage. Concepts from Nonaka's theory are used to investigate processes of knowledge standardization, examining the strategic value of tacit knowledge and the need to rely primarily on internal documentation processes. Since there has been limited research on hospital knowledge management. it may also be useful to researchers in generating propositions for further study.

  • PDF

Study on ISA's assessment to software process for EN50128 SIL4 (EN50128 SIL4 소프트웨어 프로세스 ISA 인증 사례 연구)

  • Cho, Chi-Hwan;Kang, Chan-Yong;Hwang, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.838-849
    • /
    • 2010
  • It is inevitable to control the systematic failure to obtain the software safety integrity of embedded software installed in rolling stock. Because it is not possible to assess systematic failure integrity by quantitative methods, SILs are used to group documentation, methods, tools and techniques throughout software development lifecycle which, when used effectively, are considered to provide an appropriate level of confidence in the realization of a system to a stated integrity level. Normally, safety approval process is through generic product, generic application and specification application for. For safety approval on generic application of software based system, it is required to apply the certified software processes from the planning stage for the assigned SIL. As such, we will develop project specific application with high safety integrity within time limit of contractual delivery schedule through software assessment to the modified area with the re-use of certified software module and documentation. At this point, Hyundai Rotem has developed software processes applicable to support SIL 4 based on EN50128 which was assessed and certified by TUV SUD. This paper introduces the Hyundai Rotem's detailed approach and prospective action to achieve software safety integrity level.

  • PDF