Journal of the Korea Society of Computer and Information
/
v.14
no.4
/
pp.171-178
/
2009
Recently, a combination of Business Process Management (BPM) and Service Oriented Architecture (SOA) is being recommended as the best approach for automating large business systems. And the need to create meaningful information from daily operational data is increased today. In this paper, we propose a methodology for automating business processes based on the BPM-SOA convergence trend and verify the methodology by implementing the project management business process. BPM-SOA convergence provides higher extensibility and productivity due to the loosely coupled system construction and maintenance. The system has good properties for frequent process changes and reuse of duplicate processes. We then analyze extensibility of the system as new business processes are added to the existing system. We finally analyze the data generated by BPM by using SAP business intelligence to support management's decision making and strategy. Business intelligence provides not only useful data for business decisions but also chance to optimize the business processes.
Park, Do-Hyun;Park, Eui-Seob;Song, Won-Kyong;Ryu, Dong-Woo
Tunnel and Underground Space
/
v.20
no.1
/
pp.39-48
/
2010
The present study developed a program which can assess the reliability of tunnel support systems based on a probability-based method. The developed program uses FLAC2D as a solver, and can automatically execute all the processes, associated with numerical and probabilistic analysis. Since a numerical analysis, which models the ground, requires a significant calculation time, it is actually impossible to apply simulation-based methods to probabilistic assessment on the reliability of tunnel support systems. Therefore, the present study used a point estimate method, which is efficient for probabilistic analysis since the method can significantly reduce the number of samples when compared with the simulation-based method. The developed program was applied to a tunnel project, and the results were compared with those through a deterministic approach. From the comparison, it was identified that a probabilistic approach can quantitatively assess the reliability of tunnel support systems based on probability of failure and can be used as a tool for decision making in tunnel support designs.
Safa, Mahdi;Haas, Carl T.;Hipel, Keith W.;Gray, Joel
Journal of Construction Engineering and Project Management
/
v.3
no.2
/
pp.1-12
/
2013
Research indicates that good front-end planning (FEP) results in the achievement of higher levels of project performance. By facilitating collaboration among stakeholders in diverse locations with the use of workflow-enabled processes, such pressures can be reduced, and the overall process and results of FEP can be improved. With these goals, a front-end planning tool (FEPT) has been developed as support for owners and major contractors who are engaged in front-end planning. This paper presents the new FEPT and describes how it has been used for construction megaprojects in the nuclear power, oil and gas, and mining industries. The paper begins with the definitions related to and an explanation of the general process for implementing and applying the FEPT and then describes and analyzes how the FEPT was applied in case study projects in order to test its validity. The results indicate that the FEPT increases the efficiency and effectiveness of front-end planning for the megaprojects studied and that it has the potential to produce similar results for other megaprojects.
Transactions on Control, Automation and Systems Engineering
/
v.3
no.1
/
pp.10-14
/
2001
We studied the use of time-related information, with and without prediction, to support human operators performing moni-toring and control tasks in the process. Based on monitoring and control techniques used for Project Management we developed a display design for the process industries. A simulated power plant was used to test the hypothesis that availability of predictions along with information on past trends can improve the performances of the human operator handling faults. Several designs of dis-plays were tested in the experiment in which human operators had to detect and handle two types of faults(local and systems wide) in the simulated electricity generation process. Analysis of the results revealed that temporal data, with and without prediction, signifi-cantly reduced response time. Our results encourage the integration of temporal information and prediction in displays used for the control processes to enhance the capabilities of the human operators. Based on the analysis we proposed some guidelines for the de-signer of the human interface of a process control system.
Trtilek, Radek;Havlova, Vaclava;Podlaha, Josef;Svoboda, Karel;Otcovsky, Tomas
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.19
no.1
/
pp.29-38
/
2021
The article summarises the status and competence of UJV Rez, a. s. (up to 2012, the Nuclear Research Institute Rez, Czech Republic) in the field of radioactive waste (RAW) management as a company managing of 95% of institutional radioactive wastes in Czech Republic. UJV Rez a. s. has been one of the Czech Republic's key research and engineering institutions in the field of nuclear energy production since 1955. The company processes and conditions prior to storage 95% of so-called institutional RAW and is the principal partner of the state with respect to the research support of the Czech deep geological repository development project. UJV Rez a. s. boasts its own accredited radiochemical analytical test laboratory, unique of its kind in the Czech Republic. Of equal importance is UJV Rez's active participation in a range of international organisations and associations and its involvement in wide range of international projects, and so as European projects. One of them is EU funded project PREDIS: Pre-disposal management of radioactive wastes, that has started at September 2020, focused on the field of low level radioactive waste (LLW) and intermediate level radioactive waste (ILW) pre-disposal.
Two of the most important changes in the global market can be represented with Hyper-connection and Glocalization. To cope with these changes and secure the competitive advantages, it is essential to develop the standard organization, policy, processes and criteria for service management. In addition, the service management system is required to effectively support the R&D project management. In this research, an adaptive framework and system architecture for designing R&D project management process using cloud computing has been introduced. With the proposed system, it is able to overcome the limitations of traditional service management and treat the demand from the market in agility. Moreover, it may be possible to present more value than customers want and secure the competitive advantages in the global market with the proposed system.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.143-150
/
2003
Using integrated construction project data is necessary for efficient management of construction projects. Recently IFC(Industry Foundation Classes) are proposed as integration method based on interoperability and there have been several cases of system integration based on IFC. The concept of interoperability proposes the construction object as data sharing protocol between systems for system integration and independence of each system. This study proposes system development strategy by phases considering work scope and procedure of processes based on the concept of interoperability. This is proposed to overcome tendency of developing system which doesn't support real work processes as result of inclining to the format of IFC instead of properly using IFC's interoperability concept to real work scope and procedure.
Journal of the Korea Academia-Industrial cooperation Society
/
v.10
no.11
/
pp.3390-3398
/
2009
The knowledge management starts from the enhancement of learning capability in the members of the organization. The strategic change into the learning organization should be aligned with the change of organizational strategy, structure and processes. The study employed action learning methodology to transform the traditional organization into the learning one. The learning organization project has been successful thanks to the members' zeal and consensus to change the processes. However, not every learning team has been so successful. Some cases complained time consuming where others expect to be helpful for their incentives. The researchers concluded that the most important point for success of the learning organization project should be the support of top management.
The aim of this article is to propose a framework for standardization of knowledge based on a case study of clinical operation to guide initial hospital knowledge management projects. Both quantitative and qualitative data for the project from 2009 through 2012 were collected for analysis. In a study of knowledge management project of a lab in S Hospital's Eye Center, this research examines the standardization of operational knowledge for competence enhancement of the lab. The lab defined and standardized the knowledge concern of the lab operation and the in-group from 2008. Organizations are often unaware of the potential value of tacit knowledge in both clinical and administrative area. The main finding from the case study is that analysis of such tacit knowledge of a lab in a hospital can be transformed into explicit knowledge for organizational capabilities such as improved quality, responsiveness and competitive advantage. Concepts from Nonaka's theory are used to investigate processes of knowledge standardization, examining the strategic value of tacit knowledge and the need to rely primarily on internal documentation processes. Since there has been limited research on hospital knowledge management. it may also be useful to researchers in generating propositions for further study.
It is inevitable to control the systematic failure to obtain the software safety integrity of embedded software installed in rolling stock. Because it is not possible to assess systematic failure integrity by quantitative methods, SILs are used to group documentation, methods, tools and techniques throughout software development lifecycle which, when used effectively, are considered to provide an appropriate level of confidence in the realization of a system to a stated integrity level. Normally, safety approval process is through generic product, generic application and specification application for. For safety approval on generic application of software based system, it is required to apply the certified software processes from the planning stage for the assigned SIL. As such, we will develop project specific application with high safety integrity within time limit of contractual delivery schedule through software assessment to the modified area with the re-use of certified software module and documentation. At this point, Hyundai Rotem has developed software processes applicable to support SIL 4 based on EN50128 which was assessed and certified by TUV SUD. This paper introduces the Hyundai Rotem's detailed approach and prospective action to achieve software safety integrity level.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.