Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

선보상-후시공 제도의 공공건설사업 파급효과 분석 (Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects)

  • 김상범;최정원
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.245-254
    • /
    • 2004
  • '선보상-후시공 제도화' 대책은 1999년 「공공건설사업 효율화 종합대책」의 세부 대책으로서 공공건설 사업비용 $90\%$ 절감을 목표로 수행되었다. 이에 본 연구에서는 대책의 성과를 측정하고 분석하여 향후의 개선 사항 및 제안을 위해, 종합대책 이전과 이후로 구분하여 관련 자료를 분석함으로써 대책에 대한 성과 분석 연구를 수행하였다. 이러한 성과의 분석은 사업비와 사업기간의 관점에서 정량적인 성과 측정을 중심으로 이루어 졌으며, 선보상-후시공 제도화 대책의 성과로 인한 종합대책의 전체성과에 대한 기여도와 향후 제안 사항 등을 기술하였다. 연구 결과 본 대책은 약 $4.83\%$의 공공건설 예산 절감효과가 있는 것으로 분석되었으며, 공기 절감 면에서도 긍정적 파급효과가 있는 것으로 나타났다.

군용항공기 연구개발 사업의 리스크 관리 (Risk Management for R&D Projects in the Military Aircraft Systems)

  • 김성훈;이현철
    • 산업경영시스템학회지
    • /
    • 제44권4호
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • 시스템엔지니어링학술지
    • /
    • 제11권1호
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

소프트웨어 프로젝트의 비용-일정 타협 (Cost-Schedule Tradeoff in Software Project)

  • 이상운;최명복
    • 한국인터넷방송통신학회논문지
    • /
    • 제13권4호
    • /
    • pp.99-106
    • /
    • 2013
  • 일반적으로 소프트웨어를 개발하는데 소요되는 일정 단축은 추정된 명목상 일정을 기준으로 75% 범위 내에서 결정된다. 그러나 지금까지 명목상 개발 일정이 명확히 제시되지 않아 개발일정 단축 가능성을 판단하는데 어려움이 있다. 따라서 본 논문은 다양하게 제안된 명목상 개발일정 기준을 고찰하여 최적의 범위를 결정하였다. ISBSG Release 8의 기능점수 기반 실제 수행된 1,595개 프로젝트를 대상으로 이 기준 범위에 속하는 614개의 프로젝트를 추출하였다. 이 데이터들을 대상으로 개발노력 추정 모델을 유도하였다. 또한, 추정된 개발노력 모델에 기반하여 개발기간을 추정하는 모델을 유도하였다. 제안된 모델을 적용시 실제 프로젝트를 개발시 요구되는 개발노력과 개발기간을 보다 현실적으로 추정할 수 있을 것이다.

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구 (Development of Construction Schedule Management System based on BIM)

  • 박소현;송정화;오건수
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

표정속도 향상에 따른 열차제동거리 확보방안 연구 (Study on Securing Train Braking Distances according to the Schedule Speed Improvement)

  • 이훈구;김진철;이수환;이부현;엄기영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.1238-1239
    • /
    • 2011
  • For the domestic railways, we carry out the speed-up project for the maximum speed, came out of the plan on the schedule speed improvement, such as the Gyeongbu HSR 1st and 2nd step project and the speed-up project of the major trunk railways. As the speed increase, we shall review the conventional calculation methods for braking distances and identify the increase of braking distances. In this way, we shall secure the safe braking distances.

  • PDF

원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구 (Process Model for development of EVMS in Nuclear Power Plant Project)

  • 김윤명;원서경;신일섭
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

현금 흐름을 고려한 건설일정 최적화에 관한 연구 (Optimizing a Construction Schedule Considering Cash-flow)

  • 이형국;임태경;손창백;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.303-305
    • /
    • 2012
  • This paper presents a system called a Cash-flow based Construction Scheduling Optimization (CfSO). The existing CPM is biased on schedule and cost management. For a profitable and successful project management, the cash-flow which occurred actually by contractual conditions should be considered in the project scheduling. Therefore, this study provides a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed methodology is implemented as a system prototype in Microsoft Excel. CfSO helps a site manager as a decision-maker to establish a optimized project scheduling and decide profitable contractual conditions against a construction owner.

  • PDF