A MONITORING METHOD OF PROJECT PROGRESS WITH RFID TECHNOLOGY

  • Soungho Chae ; Naruo Kano
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.491-496
    • /
    • 2005
  • In this paper, the authors explained the overview of a method for detecting location of worker for development of a monitoring system for project progress management using RFID technology. Data is the RSSI (Receive Signal Strength Indication) from RFID tag attached to the worker installing a rolling shutter, and was obtained from antennas and RFID readers set around the construction site. Neural network was done using RSSI collected and the area where worker is performing a task, and an estimation model of the working area was prepared. The network had a range of the percentage of correctly classified from 62% to 92%. The authors suggested the method to make estimate by using integrated networks prepared in respect of RFID readers, and showed the percentage of correctly classified of 84.3%. According to the result, the authors confirmed the possibility of the monitoring system with RFID technology, and mentioned the factors necessary to develop for further practical use.

  • PDF

Development of Progress Measurement Framework for Mega Construction Project (대규모 건설프로젝트의 진도율 측정 프레임워크 개발에 관한 연구)

  • Ko, Sungjin;Chi, Seokho;Kim, Jinwoo;Song, Junho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.419-425
    • /
    • 2017
  • Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.

ON CODING AND UNIT-TEST PROCESS MANAGEMENT FOR SOFTWARE DEVELOPMENT OF LARGE-SCALE

  • Kino Yasunobu
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.233-238
    • /
    • 1998
  • To manage a phase of coding and unit-test, project managers have used to pay attention to a number of completed programs. And the manager makes a graph of progress. Usually, this graph of progress has S shape and doesn't linearly depend on the workload. So the degree of progress seems to be behind. In actual, many projects tend to be behind the schedule. Because of this reason, it is difficult to judge whether the project is behind or not in the early stage. In this paper, We propose the 'four-division model' to solve this difficulty.

  • PDF

Toward Sustainable Neighbourhood Design: Examining Shinjung Environmentally Friendly Housing Estate Development Project

  • Kim, Kyung-Bae;Oh, Deog-Seong
    • Architectural research
    • /
    • v.3 no.1
    • /
    • pp.9-19
    • /
    • 2001
  • Since the late 1990s Korean housing authorities and private companies have been pursuing various initiatives towards sustainable neighbourhood design, however, there has been no attempt to examine their progress. This research aims to suggest a sustainability evaluation framework and analyse the progress of sustainability of a cutting edge project: Shinjung Environmentally Friendly Housing Estate Development, using that framework. The results of the analysis suggest that the project failed to make Significant progress in the sustainability evaluation criteria compared to normal projects in Korea and there exist significant barriers: economic/financial barriers; institutional/structural barriers; and implementation barriers within current planning and design practices. Most of the project's design strategies were simply adopted and used as a marketing tool without public participation, sustainability targets or benchmarking for sustainability. Furthermore, most of the responsibility for maintenance was left to residents who normally lack the knowledge, experience, interest and money to carry out such tasks. These problems cause significant concerns over the future success of the project toward sustainability. The experience of the Shinjung project also highlights the need for a more proactive central and local government stance towards sustainable neighborhood design.

  • PDF

Standardized Progress Measurement Package (건설진도율 산정을 위한 진도관리단위에 관한 연구)

  • Jung Youngsoo;Kang Seunghee;Chin Sangyoon;Kim Yeasang;Chung Moonhun;Park Soonchan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.565-570
    • /
    • 2004
  • The construction Progress is widely used 3s a critical index for effective project management. However, the methods, structure, data, and accuracy of progress measurement may vary depending on specific characteristics of the project, organization, or location. Even in an organization, different projects may utilize different measurement methods to effectively achieve their own management purpose. The excessive effort required to manipulate very detailed progress data is also an issue Therefore the purpose of this study is to dove]op an automated progress measurement model utilizing standard progress measurement package (SPMP).

  • PDF

A Study on the Improvement of Construction Progress Management for EVMS (공정-원가 통합관리를 위한 진도관리 개선 방안)

  • Lee, Kyoo-Hyun;Park, Chan-Jung;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

System Dynamics Approach to Progress Payment Regulations

  • JeongHoon Lee;Moonseo Park;Hyun-Soo Lee;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.181-187
    • /
    • 2013
  • The construction market condition is getting worse because of global constructions slow down, low profit, market contraction and so on. For these reason, most construction companies depend on public construction projects which possible to protect construction fee, known as progress payment, by laws. Despite this law, problems of progress payment are constantly occurring and it has been main factors that hinder the construction cost's cash-flow in construction project. To solve this problem, many researchers suggested various solutions but most of solutions were focused on specific target as owner, general contractor, and subcontractor. So, most of solutions were insufficient consider about interaction between contractors. Because of these reasons, it was hard to reflected policy. This research aimed to use system dynamics to develop the model for the application and payment based on the regulations and papers. Also, performed a developed model's verification based on progress payment regulation's basic objectives.

  • PDF

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF

Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.

GIS for Agricultural Project and Program Evaluation

  • Punyaratabandhu, Sompit
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.38-40
    • /
    • 2003
  • Project monitoring and evaluation is very important, as it can be used to indicate progress and success, including problems and impact of the project. It can also be used for improving project plan, administration, and management. GIS is the visualization method that is extremely helpful in decision making and planning. So GIS is an appropriate tool for agricultural project and program monitoring and evaluation. There are three ways of using GIS in project undertakings i.e. GIS for feasibility studies, GIS for project and program monitoring, and GIS for project and program evaluation.

  • PDF