4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

Improving the Accuracy of Early Stage Cost Estimation in Apartment Construction Project (공동주택 프로젝트의 초기 공사비 예측정확도 향상에 관한 연구)

  • Lim, So-Yean;Yeo, Sang-Gu;Go, Seong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.143-147
    • /
    • 2010
  • Due to the diversification and complication of construction projects, controlling risks from the early design-planning phase gives huge impact on success of the construction project. As a part of managing uncertainties it is also important to estimate the project cost several times. Especially, estimating project cost in the early stage gives effects on making a budget for projects. This study estimated the apartment project cost using case-based reasoning(CBR), which is the process of solving new problems based on the past problems. For this, we deduced the apartment cost influence factors which can be gathered in the early stage of project. Based on the factors we established the database for apartment project and calculated the attribute value, attribute similarity and case similarity. Although we retrieve the most similar case from the database, it is very hard to utilize it directly due to the uniqueness of each project. So, Genetic Algorithm(GA) was applied in revising the cost of the retrieved-case. Therefore, the accuracy of the prediction was improved by GA optimization.

  • PDF

Structure-From-Motion Approach to the Reconstruction of Surfaces for Earthwork Planning

  • Nassar, Khaled;Jung, Young-Han
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.1-7
    • /
    • 2012
  • The reconstruction of surfaces from unorganized point clouds can provide very useful information for construction managers. Although point clouds are generally created using 3D scanners, they can also be generated via the structure-from-motion technique using a sequence of images. Here we report a novel surface reconstruction technique for modeling and quantifying earthworks that can be used for preliminary planning, project updates and estimating of earthwork quantities, as well as embedded planning systems in construction equipment. The application of structure-from-motion techniques in earth works is examined and its advantages and limitations identified. Data from 23 earthwork excavation construction sites were collected and analyzed. 3D surface reconstructions during the construction phase were compared to the original land form. Similar experiments were conducted with piles of earth and the results analyzed to determine appropriate ranges of use for structure-from-motion surface reconstructions in earthwork applications. The technique was found to be most suited to pile of materials with volumes less than 2000 m3. Piles up to 10 m in height and with base areas up to $300m^2$ were also successfully reconstructed. These results should be of interest to contractors seeking to utilize new technology to optimize operational efficiency.

A Study on Development of Evaluation Indicators to Collaborative Energy Saving Projects with NGO (에너지절약 민간단체 협력사업의 성과분석 평가지표 개발)

  • Lim, Ki Choo
    • Journal of Energy Engineering
    • /
    • v.24 no.3
    • /
    • pp.142-149
    • /
    • 2015
  • The aim of this study was to develop a evaluation indicator to collaborative energy saving projects with NGO. We set the indicator based on expert advice, and refer to the preceding case study. The indicator has been set for the purpose of analyzing in planning, execution, performance phase to projects. In planning phase these consist of indicator such as project selection and rating, projects goals and concrete plans, etc; and systematic way of projects promotion, projects management and follow-up, and participation on selected contents, etc in execution phase; and achieve their goals, participant satisfaction, etc in performance phase.

A Methodology for Global ERP Implementation Based on GSI(Global Single Instance) and Its Application (GSI(Global Single Instance)기반의 Global ERP 구축 방법론 및 적용 사례)

  • Lee, Jae-Kwang;Cho, Min-Ho
    • Journal of Information Technology Services
    • /
    • v.7 no.3
    • /
    • pp.97-114
    • /
    • 2008
  • Many companies have implemented ERP systems to enhance their process competitiveness. Since most ERP systems down to date are implemented and managed on each separated business-unit or company level, such systems run short of the consideration about global business processes and global system managements. In order to integrate a successful global ERP, it is essential to apply the well-systematic implementation methodology which considers global standardization and global IT requirements. It is, however, the actual circumstance that such well-structured methodologies for global ERP implementation are hardly shown not only from domestic site but from foreign one. This paper indicates the global ERP implementation guideline with integrated approach including; the standard process design for efficient execution of global business; the ERP implementation method considering global IT requirements; and, the management method for global system operation. GSI ERP methodology is composed of 3 Phase:Global Strategy Planning, Global Template Construction and Global Roll-Out. Phase1; Global Strategy Planning contains Environment Analysis, GSI direction and Implementation Plan. Phase2; Global Template Construction contains Business blueprint, GSI operation design and Global template implementation. Phase3; Global Roll-out contains local business analysis, local ERP implementation and Global ERP Operation.

The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - (플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로 -)

  • Lee, Do-yun;Choi, Chang-Hoon;Won, Seo-kyung;Cho, Moon-Young;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.3-11
    • /
    • 2016
  • Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.

A Study for Selection of Regional Academia-Industrial R&D Project (지역의 산학협력 연구개발 지원 과제 선정을 위한 연구)

  • Kong, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.1
    • /
    • pp.202-210
    • /
    • 2014
  • This paper is to discover selection indicator for academia-industrial cooperation R&D project. Existing Project lacks careful consideration for participant enterprise. But, This project must be focused on enterprise for the goal of project is to improve business competition. Therefore, we analyze the survey result of enterprise satisfaction and deduct the factor of satisfaction by statistical analysis like One-way ANOVA and Regression. The study says that collaboration time, the time of planning of commercialization, technology transfer and the level of goal achievement improve enterprise satisfaction. And it implies needs for plan of manpower input and commercialization at the selecting phase. This paper is significant that it can improve project system by satisfaction. We expect that this result is utilized by planning and management.

A Study on the Analysis and Estimation of the Construction Cost by Using Deep learning in the SMART Educational Facilities - Focused on Planning and Design Stage - (딥러닝을 이용한 스마트 교육시설 공사비 분석 및 예측 - 기획·설계단계를 중심으로 -)

  • Jung, Seung-Hyun;Gwon, Oh-Bin;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.6
    • /
    • pp.35-44
    • /
    • 2018
  • The purpose of this study is to predict more accurate construction costs and to support efficient decision making in the planning and design stages of smart education facilities. The higher the error in the projected cost, the more risk a project manager takes. If the manager can predict a more accurate construction cost in the early stages of a project, he/she can secure a decision period and support a more rational decision. During the planning and design stages, there is a limited amount of variables that can be selected for the estimating model. Moreover, since the number of completed smart schools is limited, there is little data. In this study, various artificial intelligence models were used to accurately predict the construction cost in the planning and design phase with limited variables and lack of performance data. A theoretical study on an artificial neural network and deep learning was carried out. As the artificial neural network has frequent problems of overfitting, it is found that there is a problem in practical application. In order to overcome the problem, this study suggests that the improved models of Deep Neural Network and Deep Belief Network are more effective in making accurate predictions. Deep Neural Network (DNN) and Deep Belief Network (DBN) models were constructed for the prediction of construction cost. Average Error Rate and Root Mean Square Error (RMSE) were calculated to compare the error and accuracy of those models. This study proposes a cost prediction model that can be used practically in the planning and design stages.

Follow-up Monitoring & Adaptive Management after Ecological Restoration for the Stream - Focused the Hakui Stream in Anyang City - (생태하천 복원 후 모니터링과 적응관리 - 안양시 학의천을 중심으로 -)

  • Choi, jungkwon;Choi, mikyoung;Choi, cheolbin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.18 no.6
    • /
    • pp.85-95
    • /
    • 2015
  • Recent years, nationwide projects for ecological restoration are implemented with emerging issues on the stream ecosystem. In order to enhance effectiveness of the ecosystem restoration and reduce negative impact, the appraisal of effectiveness through the follow-up monitoring and the adaptive management process are executed in consecutive phase. In this study, planning phase, monitoring and adaptive management in Hakui stream which is part of An Yang stream restoration project is introduced as representative ongoing case of effective adaptive management. The aim of this study is to verify the adaptive management process and suggest direction of effective restoration. Restoration project of Hakui stream resulted in increasing number and diversity of species (vegetation, fish, bird, invertbrates, amphibian and reptilia) according to monitoring from 2004 to 2013, and enhancing natural river landscape by evaluation of river naturalness among 2001(before restoration), 2007 (after), 2015 (recent). However, excessive vegetation expansion or sediment deposition on channel over time caused unexpected results such as terrestrialization or degradation of habitats. Adaptive management action such as removing disturbance species (Humulus japonicus)(2007), coppicing willow (2007), release of march snail (2007), creation of wetland (2014) were implemented based on monitoring results. And then appraisal of management action was discussed.