Work Productivity Analysis of High-performance PC Slab Installation

  • Shin, Young-su;Cho, Kyuman;Cho, Chang-geun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.616-617
    • /
    • 2015
  • Demand is increasing for large, high-rise, and complex buildings, which is leading to advances in the development of high-performance structural systems. In this context, precast concrete (PC) technology has received a large amount of attention owing to its benefits in terms of schedule reduction, high quality, and easy installation. In addition, advanced methodologies that improve the PC performance by the addition of various materials have recently been reported. Research on analyzing the effects of such high-performance PC on the construction process and productivity is very limited. This makes it difficult for decision-makers to apply PC to particular projects. Thus, the aim of this research was to analyze the work productivity of the high-performance PC slab installation process by using a construction simulation tool to resolve critical issues. In this study, a real construction project that adopted PC slab installation work was analyzed, and a sensitivity analysis was performed to confirm the reliability of the analysis results.

  • PDF

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

Factors Affecting Implementation Performance in the Organizations Adopting ERP Systems (ERP 시스템 구현성과에 영향을 미치는 요인)

  • Jung, Chul-Ho;Chung, Young-Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.16 no.4
    • /
    • pp.135-165
    • /
    • 2009
  • The major purpose of this study is to identify the factors influencing the implementation performance of ERP Systems from an integrated viewpoint. For this purpose, a research model is developed based on the literature reviews of ERP systems, contingency theory, and change management theory. The research model proposed fifteen variables as the factors influencing the implementation performance in the ERP systems. The data have been collected from the 164 enterprises which implemented ERP systems at least one year ago. The respondents were person in charge of ERP system of each corporation. The results of hypothesis testing through multiple regression analysis are summarized as follows. Firstly, standardization of work, concentration of decision making, top management concern and support, real user participation, project support goodness, ease of use, and system usefulness have positive influence upon non-financial performance. Secondly, market uncertainty, industrial competition, project support goodness, and customization minimization have positive influence upon financial performance. From the analysis, this research have identified important characteristics for the successful implementation of ERP systems. Consequently, this research ends with managerial and theoretical implications of the study results, as well as limitations and future research directions.

  • PDF

Structural Equation Model for Information Technologization Success Index(ITSI) of Small and Medium Enterprise (구조방정식 모델을 이용한 중소기업의 IT화 성공지수(ITSI) 개발 연구)

  • Kim, Jung-Geon;Moon, Tae-Hee;Sohn, So-Young
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.338-348
    • /
    • 2004
  • OECD countries including Korea positively adopt performance-based budget systems which convert an input-centered system to an output-centered system to solve two baffling problems: public expense retrenchment and efficiency recovery of government management. Output management of IT project propelled in public sector becomes a prominent figure influenced by these keynote of policy. However, it is placed in difficult circumstances to develop a performance index and the methodology to cover characteristics of IT project, measuring the goal achievement of business and the customer contentment according to the phases of business progress. Existing studies of IT project accomplishment measurement have been fulfilled on the subject of business targeting on IT technology application, administrative information network business and national base of information network construction. Most of the studies have been executed using BSC or AHP to reflect synthetically business specifics of IT project from a methodological point of view. In this study, we propose a structural equation model (SEM) to develop a performance index which measures the outcome of IT project according to the phases of business progress, avoiding a simple presentation of project outcome or conceptual frame. The proposed SEM is applied to the survey results of "IT support project for Small and medium business". Based on the fitted model, we apply ACSI concept to develop an Information Technologization Success Index (ITSI). This index allows us comparison of several IT vendors as well as feedback information for further improvement.

A Study on Factors Related to the Conflict in IT Project Teams

  • Cho, Nam-Jae;Park, Sang-Hee;Kim, Nan-Hwa;Keum, Jung-Won
    • Journal of Digital Convergence
    • /
    • v.7 no.1
    • /
    • pp.111-123
    • /
    • 2009
  • IT projects need engineers with various backgrounds to cooperate to build an IT system that satisfy the requirements of users given a limited expense and time. Such diversity of team members and the complexity of task naturally involve considerable amount of conflict among team members. High level of conflict among team members is known to be detrimental to the performance of the team. The purpose of this study is to examine the reasons for conflicts among team members in IT projects and to check how the level of conflict affects the performance of a project and the satisfaction of the members of the project team. To test the relationship, a survey on 166 participants in IT projects was conducted. The reasons for conflicts in IT projects were categorized into five types. The level of ambiguity was found to have a significant correlation with the level of conflict. And the level of conflict, in turn, is found to have a significant effect on the degree of satisfaction among team members and the project results. Based on the research results, it is suggested that a clear definition of tasks and their boundaries is required to reduce ambiguity and thus, the level of conflict and improve the level of satisfaction of IT project team members.

  • PDF

A Study on ERP System for EVMS in Project-based Industry (프로젝트형 산업의 EVMS을 위한 ERP 시스템에 관한 연구)

  • Park, Je-Won;Lee, Chang-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.343-348
    • /
    • 2010
  • Earned Value Management System(EVMS) is a highly efficient tool in the project management, but it cannot easily determine the Actual Cost due to the indistinct criteria and extensive data. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.

  • PDF

A Health and Safety Improvement Roadmap for the Construction Industry

  • Diugwu, Ikechukwu A.;Baba, Dorothy L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.37-44
    • /
    • 2014
  • Comparatively, the construction industry has, on average, a higher rate of fatal and major injuries, work induced ill-health and damage to properties than other industrial sectors; and this is a source of concern to industry stakeholders. The study showed that although subcontracting could be contributory to an increase in workplace accidents in the construction industry, contractual aspects of subcontracting arrangements (such as the power imbalance that exist along the client-customer interface) also present opportunities for improvements in health and safety management (HSM) practices in organisations. This conclusion was reached after an analysis of a questionnaire survey (with a 27% response rate) that assessed the attitudes and perception to health and safety issues.

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

A Study of Development of Change Process for Configuration Management in Construction Project Management (건설사업관리에서 형상관리에 관한 변경 프로세스 개선에 관한 연구)

  • Ko, Ho-Un;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.81-89
    • /
    • 2009
  • CM(Configuration Management) is a field of management that focuses on establishing and maintaining consistency of a product's performance and its functional and physical attributes with its requirements, design, and operational information throughout its life. Recently upcoming concept of CM, regardless of various definitions, consists of the organization and the process for value creation through project change management, value preservation by Risk, Project Management implementation by Change management. The CM provide a basis for, and a record of, the project's performance in meeting the scope, time, cost. Overseas international companies have already adopted the CM system and enjoyed the benefits arising from such systems. And the CM provides perspectives and insights applicable to all types of projects. This study presents the review on the current systems now in use at jobsites and known to be efficient, and the introduction and application of configuration systems now at big issue. Hereby indicates the connective system consisted of work process, change control and knowledge referring to the methods and actual cases as an effective promotion of CM.

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.