International conference on construction engineering and project management
/
2015.10a
/
pp.616-617
/
2015
Demand is increasing for large, high-rise, and complex buildings, which is leading to advances in the development of high-performance structural systems. In this context, precast concrete (PC) technology has received a large amount of attention owing to its benefits in terms of schedule reduction, high quality, and easy installation. In addition, advanced methodologies that improve the PC performance by the addition of various materials have recently been reported. Research on analyzing the effects of such high-performance PC on the construction process and productivity is very limited. This makes it difficult for decision-makers to apply PC to particular projects. Thus, the aim of this research was to analyze the work productivity of the high-performance PC slab installation process by using a construction simulation tool to resolve critical issues. In this study, a real construction project that adopted PC slab installation work was analyzed, and a sensitivity analysis was performed to confirm the reliability of the analysis results.
International conference on construction engineering and project management
/
2020.12a
/
pp.103-113
/
2020
The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.
Journal of Information Technology Applications and Management
/
v.16
no.4
/
pp.135-165
/
2009
The major purpose of this study is to identify the factors influencing the implementation performance of ERP Systems from an integrated viewpoint. For this purpose, a research model is developed based on the literature reviews of ERP systems, contingency theory, and change management theory. The research model proposed fifteen variables as the factors influencing the implementation performance in the ERP systems. The data have been collected from the 164 enterprises which implemented ERP systems at least one year ago. The respondents were person in charge of ERP system of each corporation. The results of hypothesis testing through multiple regression analysis are summarized as follows. Firstly, standardization of work, concentration of decision making, top management concern and support, real user participation, project support goodness, ease of use, and system usefulness have positive influence upon non-financial performance. Secondly, market uncertainty, industrial competition, project support goodness, and customization minimization have positive influence upon financial performance. From the analysis, this research have identified important characteristics for the successful implementation of ERP systems. Consequently, this research ends with managerial and theoretical implications of the study results, as well as limitations and future research directions.
OECD countries including Korea positively adopt performance-based budget systems which convert an input-centered system to an output-centered system to solve two baffling problems: public expense retrenchment and efficiency recovery of government management. Output management of IT project propelled in public sector becomes a prominent figure influenced by these keynote of policy. However, it is placed in difficult circumstances to develop a performance index and the methodology to cover characteristics of IT project, measuring the goal achievement of business and the customer contentment according to the phases of business progress. Existing studies of IT project accomplishment measurement have been fulfilled on the subject of business targeting on IT technology application, administrative information network business and national base of information network construction. Most of the studies have been executed using BSC or AHP to reflect synthetically business specifics of IT project from a methodological point of view. In this study, we propose a structural equation model (SEM) to develop a performance index which measures the outcome of IT project according to the phases of business progress, avoiding a simple presentation of project outcome or conceptual frame. The proposed SEM is applied to the survey results of "IT support project for Small and medium business". Based on the fitted model, we apply ACSI concept to develop an Information Technologization Success Index (ITSI). This index allows us comparison of several IT vendors as well as feedback information for further improvement.
IT projects need engineers with various backgrounds to cooperate to build an IT system that satisfy the requirements of users given a limited expense and time. Such diversity of team members and the complexity of task naturally involve considerable amount of conflict among team members. High level of conflict among team members is known to be detrimental to the performance of the team. The purpose of this study is to examine the reasons for conflicts among team members in IT projects and to check how the level of conflict affects the performance of a project and the satisfaction of the members of the project team. To test the relationship, a survey on 166 participants in IT projects was conducted. The reasons for conflicts in IT projects were categorized into five types. The level of ambiguity was found to have a significant correlation with the level of conflict. And the level of conflict, in turn, is found to have a significant effect on the degree of satisfaction among team members and the project results. Based on the research results, it is suggested that a clear definition of tasks and their boundaries is required to reduce ambiguity and thus, the level of conflict and improve the level of satisfaction of IT project team members.
Proceedings of the Safety Management and Science Conference
/
2010.11a
/
pp.343-348
/
2010
Earned Value Management System(EVMS) is a highly efficient tool in the project management, but it cannot easily determine the Actual Cost due to the indistinct criteria and extensive data. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.
Journal of Construction Engineering and Project Management
/
v.4
no.1
/
pp.37-44
/
2014
Comparatively, the construction industry has, on average, a higher rate of fatal and major injuries, work induced ill-health and damage to properties than other industrial sectors; and this is a source of concern to industry stakeholders. The study showed that although subcontracting could be contributory to an increase in workplace accidents in the construction industry, contractual aspects of subcontracting arrangements (such as the power imbalance that exist along the client-customer interface) also present opportunities for improvements in health and safety management (HSM) practices in organisations. This conclusion was reached after an analysis of a questionnaire survey (with a 27% response rate) that assessed the attitudes and perception to health and safety issues.
Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.1D
/
pp.81-89
/
2009
CM(Configuration Management) is a field of management that focuses on establishing and maintaining consistency of a product's performance and its functional and physical attributes with its requirements, design, and operational information throughout its life. Recently upcoming concept of CM, regardless of various definitions, consists of the organization and the process for value creation through project change management, value preservation by Risk, Project Management implementation by Change management. The CM provide a basis for, and a record of, the project's performance in meeting the scope, time, cost. Overseas international companies have already adopted the CM system and enjoyed the benefits arising from such systems. And the CM provides perspectives and insights applicable to all types of projects. This study presents the review on the current systems now in use at jobsites and known to be efficient, and the introduction and application of configuration systems now at big issue. Hereby indicates the connective system consisted of work process, change control and knowledge referring to the methods and actual cases as an effective promotion of CM.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.4
/
pp.72-80
/
2016
The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.