Choi, Jiyong;Kang, Youngcheol;Yun, Sungmin;Mulva, Stephen;Oliveira, Daniel
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.200-204
/
2015
This paper presents 10 input measures influencing project outcomes. Construction Industry Institute (CII), a consortium of more than 130 project owner and contractor companies, has collected project-level data for over 20 years. Recently, CII has developed a new system measuring project-level performance and factors presumably influencing project performance. The system, called 10-10, collects data for 10 input and 10 output measures for capital projects. The input measures include planning, organizing, leading, controlling, design efficiency, human resources, quality, sustainability, supply chain, and safety. This paper provides theoretical background for these measures. Although the input measures have been known to impact on project outcomes such as cost and schedule, there has been no study quantitatively evaluating how they are operated in the construction industry. This study contributes to revealing the current status of their uses, which will be helpful in establishing strategies improving construction project performance.
CM방식은 CMr과 발주자가 일체가 되어 프로젝트의 전반을 관리하는 방식으로, CMr은 기술적 중립성을 유지하면서 발주자 관점에서 설계 발주 시공의 단계에서 각종 관리 업무의 전부 또는 일부를 실시하는 것이다. 건설과정에서 새로운 전문직으로 발전하고 있는 CMr은 계약에 따라 업무와 서비스 범위가 확정되므로 높은 수준의 윤리가 요구된다. 본 연구에서는 관련법에서 제시하고 있는 CMr의 법적지위와 업무수행에 따른 윤리기준과 윤리특성을 제안하였다. 결론으로는 첫째, 건설사업관리업무의 법적 특성은 관리업무를 부여하는 사람과 부여받는 사람의 계약관계에 따라 사람의 노동력을 제공하는 형태로 수행되는 위임계약, 과실책임, 선관주의 의무를 갖고 있다. 둘째, 건설사업관리의 업무 특성은 조정자의 역할, 전문기술 서비스, 발주자 설명책임과 공공성을 갖고 있다. 셋째, 이러한 업무 특성에 따라 전문가로서 건설사업관리자의 윤리평가기준은 의도, 행위와 결과로 분류하고, 이를 업무 특성과 연관시켜 덕윤리, 의무론, 결과론으로 제안하였다.
2013년 3월 정부에서는 공공공사에 분리발주방식을 확대적용하는 정책을 발표하였다. 분리발주방식의 도입을 두고 건설참여자들의 입장이 첨예하게 대립하게 되고, 건설분야의 뜨거운 이슈가 되고 있는 상황이다. 건설공사 관리의 경험이 부족한 공공발주자가 다수로 분리된 전문공종들을 직접관리하여 인터페이스의 증가에 따른 관리비용 상승, 실적 부족으로 인한 관리비용 산정 기준이 없어 사업운영에 어려움이 있는 현실이다. 따라서, 본 연구에서는 분리발주의 관리비용율 예측할 수 있는 모델을 개발하여 효율적인 분리발주의 운영이 가능하게 하는 것을 목적으로 하고 있다.
Tae-Kyung Lim;Chang-Baek Son;Jae-Jin Son;Dong-Eun Lee
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.409-416
/
2009
This paper presents a tool called Quality-Cost optimization system (QCOS), which integrates Multi-Objective Genetic Algorithm (MOGA) and Quality Function Deployment (QFD), for tradeoff between quality and cost of the unitized metal curtain-wall unit. A construction owner as the external customer pursues to maximize the quality of the curtain-wall unit. However, the contractor as the internal customer pursues to minimize the cost involved in designing, manufacturing and installing the curtain-wall unit. It is crucial for project manager to find the tradeoff point which satisfies the conflicting interests pursued by the both parties. The system would be beneficial to establish a quality plan satisfying the both parties. Survey questionnaires were administered to the construction owner who has an experience of curtain-wall project, the architects who are the independent assessor, and the contractors who were involved in curtain-wall design and installation. The Customer Requirements (CRs) and their importance weights, the relationship between CRs and Technical Attributes (TAs) consisting of a curtain-wall unit, and the cost ratios of each components consisting curtain-wall unit are obtained from the three groups mentioned previously. The data obtained from the surveys were used as the QFD input to compute the Owner Satisfaction (OS) and Contractor Satisfaction (CS). MOGA is applied to optimize resource allocation under limited budget when multi-objectives, OS and CS, are pursued at the same time. The deterministic multi-objective optimization method using MOGA and QFD is extended to stochastic model to better deal with the uncertainties of QFD input and the variability of QFD output. A case study demonstrates the system and verifies the system conformance.
Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.
Jung, Bae Yu;Byung, Cho Han;Jin, Han Sang;Won, Kwon;Ho, Jo Jae;Youl, Chun Jae
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.620-621
/
2015
In this study, the multi-criteria decision-making model based on Quality Function Deployment Method is proposed. Multicriteria decision-making is an attempt to link QFD method with the TOPSIS. By this effort, a model that makes client's decision-making more rational and objective in design phase is suggested. The multi-criteria decisionmaking model confirming to the Owner's requirements will improve the productivity of the construction industry and the satisfaction of the customer. Further study extending the range of the requirements, not only the Owner's requirement will be necessary to cover the various factors as much as possible. And then, finally as a flexible platform to achieve a sustainable quality management, web-based multi-criteria decision-making model can be utilized by the relevant stakeholders simultaneously with the feed-back and sharing the necessary informations.
The 6th International Conference on Construction Engineering and Project Management
/
pp.700-701
/
2015
Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.
고속도로 건설공사의 경우 기존에 건설된 고속도로에 대한 유지관리비가 증가하고 있어 신규 건설에 필요한 투자비에 대한 효율성의 혁신 및 프로젝트의 품질을 향상시키기 위한 생산성 관리가 필요한 시점이지만, 아직까지 고속도로 건설공사에 대한 생산성 및 성과 측정에 대한 명확한 기준이나 방법, 필요성이 제대로 정립되지 못하고 있는 실정이다. 이에 본 연구는 발주자의 주요 업무인 사업관리 측면에서 생산적 프로젝트의 5가지 주요 구성 요소를 정의하였다. 그리고 생산성에 주요한 영향을 미치는 43개 생산성 영향요소를 정의하고 이들을 세 개의 레벨로 구성된 위계체계로 정의하였다. 또한 고속도로 건설공사의 최대 발주자인 한국도로공사를 대상으로 설문조사를 수행하여 정의된 생산성 영향요소들이 생산적 프로젝트의 달성에 미치는 영향 정도를 파악하고 개선수요 정도를 파악함으로써, 사업의 성공적인 수행을 위하여 중점적으로 관리하여야 할 영향요소를 제시하였다.
우리나라에서 건설산업의 구조개편, 건설기술의 경쟁력 향상 등과 맞물려 CM에 대한 다양한 논의과정이 있었으며 건설산업기본법('97) 및 건설기술관리법('01)에 CM제도가 규정됨으로써 명실상부하게 체계를 갖추게 되었다. 이 중 특히 공공사업에 대해서는 효율성 제고라는 문제의식에서 출발하여 제도의 활성화를 위한 시범사업(Pilot Project)이 정부를 중심으로 추진중에 있다. 현재 추진중인 시범사업은 제도의 정착, 활성화 뿐만아니라 기존의 CM제도를 좀더 구체화하고 다양화하는 과정으로서 그 시행의 중요성을 인식할 수 있을 것이다. 이러한 시범사업의 추진을 통하여 현재의 감리중심의 CM제도에서 발주자 및 사업특성을 고려할 수 있도록 Owner형 CM, PM형, 민자사업 적용방안 등 다양한 CM적용형태를 모색해야 할 것이다. 이러한 노력들은 공공사업의 효율성 제고 뿐만아니라 민간부분에도 많은 영향을 미칠 것으로 기대된다.
본 연구는 수자원개발사업과 관련하여 국내 엔지니어링 업체나 기관이 세계시장에 진출하여 수자원개발사업 시행시 국제적으로 통용될 수 있는 공사시방서(영문)를 작성하는 데에 필요한 국제 전문시방서(영문)의 작성방향 정립을 위한 연구이다. 본 연구를 수행하기 위하여 수자원개발사업 관련 국내외 시방서를 조사, 분석하였다. 그리고 이 시방서들을 이용하여 국제적인 수자원개발사업에 적용하기 위한 전문시방서(영문) 작성방안을 제시하였다. 본 연구의 주요 결론은 다음과 같다. (1) 국제 전문시방서 작성의 원전이 되는 공종별 선진 외국 시방서는 북미 쪽과 유럽 쪽의 시방서 중 어느 한 쪽 시방서를 원전으로 삼되, 국내 전문가들에게 친숙하여 쉽게 이해할 수 있는 시방서를 원전으로 삼는 것이 필요하다. (2) 국제 전문시방서의 공종분류체계는 국제적인 시방서 공종분류체계에 따라 작성하되, 세계 전역에서 널리 사용되고 있는 미국시방서협회(CSI)의 MasterFormat(2004) 공종분류체계를 준용하는 것이 추천된다. (3) 국제 전문시방서의 표준규격, 적용법령 등 공사관리 방식은 국제적인 표준규격을 적용하고, 국제적으로 통용될 수 있는 내용으로 작성하는 것이 필요하다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.