• Title/Summary/Keyword: Project Operator

검색결과 101건 처리시간 0.025초

GENERALIZED SYSTEM FOR RELAXED COCOERCIVE EXTENDED GENERAL VARIATIONAL INEQUALITIES

  • Jun-Min, Chen;Hui, Tong
    • East Asian mathematical journal
    • /
    • 제28권5호
    • /
    • pp.561-567
    • /
    • 2012
  • The approximate solvability of a generalized system for relaxed cocoercive extended general variational inequalities is studied by using the project operator technique. The results presented in this paper are more general and include many previously known results as special cases.

APPLYING ELITIST GENETIC ALGORITHM TO RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

  • Jin-Lee Kim;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.739-748
    • /
    • 2007
  • The objective of this research study is to develop the permutation-based genetic algorithm for solving the resource-constrained project scheduling problem in construction engineering by incorporating elitism into genetic algorithm. A key aspect of the algorithm was the development of the elitist roulette selection operator to preserve the best individual solution for the next generation so the improved solution can be obtained. Another notable characteristic is the application of the parallel schedule generation scheme to generate a feasible solution to the problem. Case studies with a standard test problem were presented to demonstrate the performance and accuracy of the algorithm. The computational results indicate that the proposed algorithm produces reasonably good solutions for the resource-constrained project scheduling problem.

  • PDF

APPLICATION OF MULTIVARIATE DISCRIMINANT ANALYSIS FOR CLASSIFYING PROFICIENCY OF EQUIPMENT OPERATORS

  • Ruel R. Cabahug;Ruth Guinita-Cabahug;David J. Edwards
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.662-666
    • /
    • 2005
  • Using data gathered from expert opinion of plant and equipment professionals; this paper presents the key variables that may constitute a maintenance proficient plant operator. The Multivariate Discriminant Analysis (MDA) was applied to generate data and was tested for sensitivity analysis. Results showed that the MDA model was able to classify plant operators' proficiency at 94.10 percent accuracy and determined nine (9) key variables of a maintenance proficient plant operator. The key variables included: i) number of years of experience as equipment operator (PQ1); ii) eye-hand coordination (PQ9); iii) eye-hand-foot coordination (PQ10); iv) planning skills (TE16); v) pay/wage (MQ1); vi) work satisfaction (MQ4); vii) operator responsibilities as defined by management (MF1); viii) clear management policies (MF4); and ix) management pay scheme (MF5). The classification procedure of nine variables formed the general model with the equation viz: OMP (general) = 0.516PQ1 + 0.309PQ9 + 0.557PQ10 + 0.831TE16 + 0.8MQ1 + 0.0216MQ4 + 0.136MF1 + 0.28MF4 + 0.332MF5 - 4.387

  • PDF

산촌생태마을 운영매니저의 역할에 대한 인식 특성 분석 - 역량강화교육 개선을 중심으로 - (Analysis of Cognition Characteristic for Operators' Roles in Mountain Eco Villages - focused on an improvement of empowerment training -)

  • 김성학;서정원
    • 농촌계획
    • /
    • 제19권2호
    • /
    • pp.173-181
    • /
    • 2013
  • The importance of human resources empowerment for operation and management is increasing for sustainable effects and improvement in mountain eco village development projects. This study aimed to understand the cognition characteristics of operator who works for mountain eco villages as part of the mountain village development and to suggest improvement methods in empowerment training aspects. The survey contained operator's empowerment and operator systems in mountain eco villages and the results were analyzed for the study. Operators who joined the mountain eco village operator training course by Korea Forest Service were conducted the survey on March 12th~13th in 2012 and March 13th~15th in 2013. 69 and 58 of questionnaires were collected respectively and analyzed for the study. T-test was applied to Intergroup cognition difference and regression analysis was used for influential factors in necessity of operator's role. Collected data was analyzed by statistical package programme SPSS 18.0 version. According to the comparison of empowerment cognition with contingent upon training experience, 'harmony with residents' showed significantly difference at p<0.05 level. In the recognition comparison for prospect of future mountain eco village development, 'various training experiences' was significantly difference at p<0.01 level between positive and negative prospect group. Regression analysis revealed that 'communication with village leader', 'harmony with residents', and 'idea related to the project' have an effect on necessity of operator's empowerment significantly. Based on the results, the study suggests improved directions for operator's empowerment training as a horizontal leader who conduces a mountain village.

Efficient Elitist Genetic Algorithm for Resource-Constrained Project Scheduling

  • Kim, Jin-Lee
    • 한국건설관리학회논문집
    • /
    • 제8권6호
    • /
    • pp.235-245
    • /
    • 2007
  • This research study presents the development and application of an Elitist Genetic Algorithm (Elitist GA) for solving the resource-constrained project scheduling problem, which is one of the most challenging problems in construction engineering. Main features of the developed algorithm are that the elitist roulette selection operator is developed to preserve the best individual solution for the next generation so as to obtain the improved solution, and that parallel schedule generation scheme is used to generate a feasible solution to the problem. The experimental results on standard problem sets indicate that the proposed algorithm not only produces reasonably good solutions to the problems over the heuristic method and other GA, but also can find the optimal and/or near optimal solutions for the large-sized problems with multiple resources within a reasonable amount of time that will be applicable to the construction industry. This paper will help researchers and/or practitioners in the construction project scheduling software area with alternative means to find the optimal schedules by utilizing the advantages of the Elitist GA.

박판주조공정의 MMI 시스템 소개 (An introduction to the MMI system of strip casting Process)

  • 주문갑;이대성;김윤하;강태욱
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 D
    • /
    • pp.2778-2780
    • /
    • 2000
  • MMI system for strip caster 2 is described. It has been developed as a PC-based MMI system whose data is collected from the VME-based control system by ETHERNET. MMI elements that mimic the caster and its utilities are designed by using commercial program. In order to implement the UDP/IP communication in MMI, UDP/IP manager program with DDE that is a intercommunication protocol in MS-window is developed and connected with MMI mimics. Operator commands in MMI system are carried out immediately in VME system and the responses are displayed on MMI system. The developed MMI system has been proven to be convenient and stable through the operation of the past 5 years.

  • PDF

텔레프레즌스 로봇을 통한 권리행사의 세대간 수용성 격차 (Generation Gap of Expected Rights through Telepresence Robots)

  • 배일한;한정혜
    • 로봇학회논문지
    • /
    • 제15권2호
    • /
    • pp.160-168
    • /
    • 2020
  • There exists a popular belief that the elderly are more conservative than the younger people in acceptability of new technology. This study explores whether the generation gap in technology acceptance exists in the case of using telepresence robots, which project the presence and mobility of remote operator, for the universal purpose of social participation rather than for specific applications. Two groups of senior citizens and undergraduate students in their twenties personally experienced the telepresence robots operation and conducted a survey on how they perceived the social participation of a remote operator mediated by telepresence robot and to what extent the remote operator deserve equal rights to be treated as if one really exists in the local environment. The results show that the elderly have higher expectation on the role and functions of telepresence robots, and more favorable in principle for a remote operator to exercise equal rights by operating telepresence robot. It suggests that the stereotypes, the elderly lag behind younger generation in accepting new technology, is unlikely to fit into the telepresence robot market, for the elderly have more favor and support using telepresence robots as an universal avatar for social participation.

야전 치명고장자료를 이용한 함정전투체계 신뢰성 분석 및 활용 방안 (A Study of Reliability Analysis and Application on Naval Combat System Using Field Critical Failure Data)

  • 김영진;오현승;최봉완
    • 산업경영시스템학회지
    • /
    • 제39권4호
    • /
    • pp.49-59
    • /
    • 2016
  • Naval combat system developed in-country is progressing at an alarming rate since 2000. ROK navy will be achieved all vessels that have combat system in the near future. The importance of System Engineering and Integrated Logistics Support based on reliability analysis is increasing. However, reliability analysis that everyone trusted and recognized is not enough and applied practically for development of Defense Acquisition Program. In particular, Existing Reliability Analysis is focusing on reliability index (Mean Time Between Failure (MTBF) etc.) for policy decision of defense improvement project. Most of the weapon system acquisition process applying in the exponential distribution simply persist unreality due to memoryless property. Critical failures are more important than simple faults to ship's operator. There are no confirmed cases of reliability analysis involved with critical failure that naval ship scheduler and operator concerned sensitively. Therefore, this study is focusing on Mean Time To Critical Failure (MTTCF), reliability on specific time and Operational Readiness Float (ORF) requirements related to critical failure of Patrol Killer Guided missile (PKG) combat system that is beginning of naval combat system developed in-country. Methods of analysis is applied parametric and non-parametric statistical techniques. It is compared to the estimates and proposed applications. The result of study shows that parametric and non-parametric estimators should be applied differently depending on purpose of utilization based on test of normality. For the first time, this study is offering Reliability of ROK Naval combat system to stakeholders involved with defense improvement project. Decision makers of defense improvement project have to active support and effort in this area for improvement of System Engineering.

캐비닛운전원모듈을 위한 사용자인터페이스 스타일가이드 (A User Interface Style Guide for the Cabinet Operator Module)

  • 이현철;이동영;이정운
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.203-205
    • /
    • 2005
  • A reactor protection system (RPS) plays the roles of generating the reactor trip signal and the engineered safety features (ESF) actuation signal when the monitored plant processes reach predefined limits. A Korean project group is developing a new digitalized RPS and the Cabinet Operator Module (COM) of the RPS which is used for the RPS integrity testing and monitoring by an equipment operator. A flat panel display (FPD) with a touch screen capability is provided as a main user interface for the RPS operation. To support the RPS COM user interface design, actually the FPD screen design, we developed a user interface style guide because the system designer could not properly deal with the many general human factors design guidelines. To develop the user interface style guide, various design guideline gatherings, a walk-though with a video recorder, guideline selection with respect to user interface design elements, determination of the properties of the design elements, discussion with the system designers, and a conversion of the properties into a screen design were carried out. This paper describes the process in detail and the findings in the course of the style guide development.

  • PDF

Implementation Options and Economics of Phased UMTS Deployment

  • Grillo, Davide;Montagna, Maurizio;Alfano, Franco;Colombo, Antonio;Ricci, Simone
    • Journal of Communications and Networks
    • /
    • 제4권4호
    • /
    • pp.282-291
    • /
    • 2002
  • 3GPP (Third Generation Partnership Project) is defining UMTS (Universal Mobile Telecommunication System) releases which span the transition from GSM/UMTS coexistence to All-IP UMTS networks. The deployment of an UMTS network depends, in the first place, on the intended service offerings and the release an operator chooses to start service with. Other key decisions in-fluencing UMTS deployment relate to the timing of the functional enhancements and capacity increases along the economic life of the network. This paper gives an overview on the architectural and technical options for UMTS deployment. It also outlines the methodology underlying the business plan aimed at estimating the returns from investments in the UMTS infrastructure, thus helping to tune operators’ strategies for UMTS deployment.