• Title/Summary/Keyword: Project Network

Search Result 1,169, Processing Time 0.031 seconds

Cybersecurity Development Status and AI-Based Ship Network Security Device Configuration for MASS

  • Yunja Yoo;Kyoung-Kuk Yoon;David Kwak;Jong-Woo Ahn;Sangwon Park
    • Journal of Navigation and Port Research
    • /
    • v.47 no.2
    • /
    • pp.57-65
    • /
    • 2023
  • In 2017, the International Maritime Organization (IMO) adopted MSC.428 (98), which recommends establishing a cyber-risk management system in Ship Safety Management Systems (SMSs) from January 2021. The 27th International Association of Marine Aids to Navigation and Lighthouse Authorities (IALA) also discussed prioritizing cyber-security (cyber-risk management) in developing systems to support Maritime Autonomous Surface Ship (MASS) operations (IALA guideline on developments in maritime autonomous surface ships). In response to these international discussions, Korea initiated the Korea Autonomous Surface Ship technology development project (KASS project) in 2020. Korea has been carrying out detailed tasks for cybersecurity technology development since 2021. This paper outlines the basic concept of ship network security equipment for supporting MASS ship operation in detailed task of cybersecurity technology development and defines ship network security equipment interface for MASS ship applications.

Development Plan of Package-type Instruments for Next-Generation Space Weather Observation Network

  • Choi, Seonghwan;Kwak, Young-Sil;Lee, Wookyoung
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.46 no.2
    • /
    • pp.77.2-77.2
    • /
    • 2021
  • Starting with the observation of sunspots in 1987, Korea Astronomy and Space Science Institute (KASI) has developed and installed various ground-based instruments for space weather research in Korea. Recently, SNIPE and CODEX are also being developed as space-based instruments. Expansion of the observation area and simultaneous observation have become important in the study of space weather. We have started Next-Generation Space Weather Observation Network Project this year. In order to establish a solar observation network, we planned to develop the Next Solar Telescope (NxST) which is a solar imaging spectrograph, and to install three NxST in the northern hemisphere. And we also planned to develop the Thermosphere-Ionosphere-Mesosphere Observation System (TIMOS), Global Navigation Satellite System (GNSS), and Geomagnetic packages, and install them in about ten sites over the world, for the purpose of establishing a global observation network for the near-earth space weather. We can take simultaneously observed space weather data in the global area, and are expecting it will play an important role in the international community for space weather research. We also have a strategy to secure observational technologies necessary for big space missions in the future, through this project.

  • PDF

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

A Study on Affecting Factor-Construction of Collaborative Planning Process and Effect on Comprehensive Rural Village Development Project (농촌마을종합개발사업의 협력적 계획과정과 계획효과의 영향구조 분석)

  • Kim, Tae-Gu;Lee, Seong-Keun
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.2
    • /
    • pp.23-43
    • /
    • 2014
  • This study aims to analyze the affecting factors-construction of collaborative planning process and effect on Comprehensive Rural Village Development Project. To this end, targeting the 36 districts which were selected for 2004 Comprehensive Rural Village Development Project and completed their 2010 5-year projects, components of collaborative planning process and planning effect will be drawn and the affecting factors-construction of collaborative planning and effect on Comprehensive Rural Village Development Project will be analyzed below. According to the results of this study, the affecting factors of collaborative planning process of Comprehensive Rural Village Development Project on planning effect, The level of effect of individual component on endogenous variable appeared greatest mostly in the upper groups. In terms of the level of individual component effect, social learning process and interaction among participants affected greatest. The process of Comprehensive Rural Village Development Project is evaluated that it reflected collaborative planning theory of Healey enough. Therefore, in the course of Comprehensive Rural Village Development Project progress, collaborative planning model must pass social learning process and interaction among participants which are the most important components out of collaborative planning process as we saw in the upper groups. And in order to maximize the performance and results of Comprehensive Rural Village Development Project, the following sequential affecting factors model as Figure 7 must be suggested as optimal collaborative planning models of Comprehensive Rural Village Development Project. Based on the results of the study, the policy implication was drawn as follows. First, systematic supplementations in the form of a consultative body are required to perform Comprehensive Rural Village Development Project efficiently. Second, network needs to be built among different participants in Comprehensive Rural Village Development Project process. Third, systematic mechanism is required to improve social learning among different participants. Fourth, systematic rearrangement is required to guarantee the residents' realistic participation in the course of Comprehensive Rural Village Development Project process.

Communication Network Architectures for Southwest Offshore Wind Farm (한국 서남 해상 풍력발전단지 통신망 연구)

  • Ahmed, Mohamed A.;Kim, Young-Chon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.42 no.1
    • /
    • pp.88-97
    • /
    • 2017
  • With the increasing of the penetration rate of large-scale wind farms, a reliable, highly available and cost-effective communication network is needed. As the failure of a WF communication network will significantly impact the control and real-time monitoring of wind turbines, network reliability should be considered into the WF design process. This paper analyzes the network reliability of different WF configurations for the Southwest Offshore project that is located in Korea. The WF consists of 20 WTs with a total capacity of 60 MW. In this paper, the performance is compared according to a variety of indices such as network unavailability, mean downtime and network cost. To increase the network reliability, partial protection and full protection were investigated as strategies that can overcome the impact of a single point of failure. Furthermore, the reliability performances of different network architectures are analyzed, evaluated and compared.

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

Examining the PMIS Impacts on the Project Performance, User Satisfaction and Reuse Intention among the Project based Industries (프로젝트 성과, 사용자 만족도 및 재사용의도에 미치는 PMIS의 산업별 영향 비교)

  • Park, So-Hyun;Lee, Ayeon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.276-287
    • /
    • 2021
  • Project Management Information System (PMIS) is a special purpose information system that is created to provide useful information for project managers and participants to make effective and efficient decision making during projects. The use of PMIS is increasing in project based industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project management performance. However, it is unclear what are the difference of PMIS impacts between industries, and still need to be studied further. The purpose of this study is to compare the impact of PMIS on project management performance between industries. We assume that the effects of PMIS will be different depending on the industry types. Five hypotheses are established and tested by using statistical methods. Data were collected by using a survey questionnaire from those people who had experience of using PMIS in various project related industries such as construction, defense, manufacturing, software development and telecommunication. The survey questionnaire consists of 5 point scale items and were distributed through e-mails and google drive network. A total of 181 responses were collected, and 137 were used for analysis after excluding those responses with missing items. Statistical techniques such as factor analysis and multiple regression are used to analyze the data. Summarizing the results, it is found that the impacts of PMIS quality on the PM performance are different depending on the industry types where PMIS is used. System quality seems to be more important for improving the PM performance in construction industry while information quality seems more important for manufacturing industry. As for the ICT and R&D industries, PMIS seems to have relatively lesser impact compared to construction and manufacturing industries.

The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis (댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구)

  • Yoon, Jae-Ho;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.715-724
    • /
    • 2003
  • It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.

Measuring Psychological Support for the Unemployed: The Case of Kakao NEET Project

  • Jeong, Jaekwan;Park, Kahui;Hyun, Yaewon;Kim, Daewon
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.4
    • /
    • pp.1502-1520
    • /
    • 2021
  • This paper attempts to investigate Korean youth Not in Education, Employment and Training (NEET) and how daily activities and community participation may influence their positive emotions and job search desire. First, we conducted a focus group interview with 16 NEETs who participated in the Kakao NEET Company project. The project allowed participants to experience employment by founding a virtual company in which each participant selected a daily activity to perform as part of the company's operations. Second, the interview responses were categorized and assigned emotional values using the card sorting technique and multi-dimensional analysis (MDS). A total of 11 emotional values were derived through this process. Finally, a social network analysis was conducted in order to measure the density of relations among the emotional values. Results suggest that immersion, confidence, belongingness were the three highest values evaluated by participants. Furthermore, network diagrams imply that the stronger participants perceived social support and belongingness with others, the stronger their responsibility grew, further leading them to establish steady goals. In particular, the high eigenvector score for "desire for job" suggests that emotional values are sequentially connected to the immersion-social support-responsibility-goal-job desire. This sequence suggests that digital services that are developed with the aim to enhance social values such as the Kakao NEET Project may engender motivation and confidence in youth NEETs. The overall results suggest that a systematic approach to policymaking should be considered in order to provide fundamental solutions and expand opportunities for social participation and emotional comfort, as social isolation due to low self-esteem has been reported as one of the reasons for NEETs' failure in the labor market.

Volume Control using Gesture Recognition System

  • Shreyansh Gupta;Samyak Barnwal
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.6
    • /
    • pp.161-170
    • /
    • 2024
  • With the technological advances, the humans have made so much progress in the ease of living and now incorporating the use of sight, motion, sound, speech etc. for various application and software controls. In this paper, we have explored the project in which gestures plays a very significant role in the project. The topic of gesture control which has been researched a lot and is just getting evolved every day. We see the usage of computer vision in this project. The main objective that we achieved in this project is controlling the computer settings with hand gestures using computer vision. In this project we are creating a module which acts a volume controlling program in which we use hand gestures to control the computer system volume. We have included the use of OpenCV. This module is used in the implementation of hand gestures in computer controls. The module in execution uses the web camera of the computer to record the images or videos and then processes them to find the needed information and then based on the input, performs the action on the volume settings if that computer. The program has the functionality of increasing and decreasing the volume of the computer. The setup needed for the program execution is a web camera to record the input images and videos which will be given by the user. The program will perform gesture recognition with the help of OpenCV and python and its libraries and them it will recognize or identify the specified human gestures and use them to perform or carry out the changes in the device setting. The objective is to adjust the volume of a computer device without the need for physical interaction using a mouse or keyboard. OpenCV, a widely utilized tool for image processing and computer vision applications in this domain, enjoys extensive popularity. The OpenCV community consists of over 47,000 individuals, and as of a survey conducted in 2020, the estimated number of downloads exceeds 18 million.