A SCHEDULING TECHNIQUE FOR MULTIPLE RESOURCE ALLOCATION TO MULTIPLE PROJECTS IN CONSTRUCTION

  • K Ananthanarayanan;Murali Jagannathan
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.201-208
    • /
    • 2011
  • Today's highly competitive construction scenario forces all the major players in the field to take up multiple projects which have put an undue pressure on the resources available within the organization. Under such a situation, there are many instances where in the resource requirement exceeds its availability due to multiple activities (with same resource requirement) which are scheduled to start simultaneously and thus results in the constrained resource becoming a bottleneck of the project. As a consequence of sharing resources, this paper studies the impact on the completion date of two similar projects under two different conditions, the first one resulting in a postponed end date and the second without any postponement. The resource utilization, the possibility of substitution of a resource and its subsequent impact on the deadline of the project is analyzed under these two circumstances. The study is done on a Critical Chain Project Management (CCPM) platform instead of leaving the schedule with a traditional Critical Path Method (CPM) finish, which gives an added advantage of validating the robustness of the emerging CCPM trend in the field of resource management.

  • PDF

A Productivity Analysis for Management Manpower of Building Construction Projects (건축공사의 현장관리 인력에 대한 생산성 분석)

  • Lee, Hyun-Min;Lee, Dong-Hoon;ZHENG, QI;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.10 no.1
    • /
    • pp.45-55
    • /
    • 2010
  • While Korean construction companies are adapting themselves to rapidly changing business landscape at home and abroad, intensifying competition among competitors in local as well as global market deteriorates the profitability of construction industry, which leads to another problem. In response to such challenges, many construction companies continue to innovate their business portfolio and organization structure, with strong commitment to business process innovation. Furthermore, they need to analyze the productivity of project site management manpower overhauling business processes systematically and develop effective alternative strategies. This research aims to analyze the productivity of project site management manpower. Current operational practices of construction site organizations have been analyzed with focus on large construction companies in Korea and data gathered from project sites have been analyzed from a wide range of perspectives, In so doing, this research is expected to provide basic inputs for any subsequent attempt to estimate proper resource requirement for site management tasks in construction projects and analyze the management productivity of such resources by enabling construction companies to better understand the current operational status of site organization.

Project Management based Analysis for the Enterprise 6 Sigma Success Factors (프로젝트 경영관점에서의 전사 6 시그마 성공요인 분석)

  • Mhun, Young-Soo;Bae, Suk-Joo
    • Journal of Applied Reliability
    • /
    • v.11 no.1
    • /
    • pp.59-81
    • /
    • 2011
  • Six Sigma has been disseminated into a variety of areas. It is believed that a stepwise understanding of Six Sigma's DMAIC is required for successes of unit projects. Meanwhile, infra-structure factors, such as leadership, organization, personnel management, educational system, etc., are also important to safely implant the Six Sigma into the whole enterprise and to thoroughly create the culture of innovation and enterprise. Careful analysis of those elements makes it possible to draw common connection between Project Management and the Six Sigma. This study drives the success elements for the successful adoption of the Six Sigma in the Korea Western Power Co., Ltd., of which management was evaluated as one of the tops based on the results of 2007 Management Innovation Assessment and arranges the similarity of like this factor and Enterprise Project Management. The results of this study are expected to provide a useful guideline for the adoption of the Six Sigma in whole company level.

BUILDING A CONCEPTUAL MODEL OF EFFECTIVE LEARNING IN INTERNATIONAL CONSTRUCTION JOINT VENTURES

  • L.T. Zhang;W.F. Wong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.749-758
    • /
    • 2007
  • Learning has become an important aspect for any organization to stay relevant and competitive in the corporate world of survival. In construction industry, the international construction joint ventures (ICJVs) provide an excellent platform with opportunity of learning among partners seeking to develop new area of competency and improve their overall competitiveness for their next project endeavor. This paper discusses the development of a conceptual model of effective learning in ICJVs using four major stages of development in a typical joint venture (JV) 's process. The study identified that there are three key constructs that contribute to effective learning comprising learning conditions in the JV's pre-inception stage, success factors of JV for learning in the forming & organizing stage, and learning actions in the implementation & adjustment stage. The effective learning outcomes are measured by the characteristics of learning organization during the JV's completion & evaluation stage. Details and issues of each stage and the methodology of research will be presented and discussed.

  • PDF

Applying and Implementation of Learning Organization with Action Learning : D Corporation Case (액션러닝을 활용한 D기업의 학습조직 적용과 성과에 관한 연구)

  • Yum, Ji-Hwan;Park, Sang-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.11
    • /
    • pp.3390-3398
    • /
    • 2009
  • The knowledge management starts from the enhancement of learning capability in the members of the organization. The strategic change into the learning organization should be aligned with the change of organizational strategy, structure and processes. The study employed action learning methodology to transform the traditional organization into the learning one. The learning organization project has been successful thanks to the members' zeal and consensus to change the processes. However, not every learning team has been so successful. Some cases complained time consuming where others expect to be helpful for their incentives. The researchers concluded that the most important point for success of the learning organization project should be the support of top management.

A Study on the Dependability Management Programme (통합신뢰성 경영모텔에 관한 연구)

  • 김종걸;이낙영;권영일;홍연웅;전영록;나명환
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2001.05a
    • /
    • pp.83-92
    • /
    • 2001
  • We consider some dependability management systems(IEC300, NASA AHB5300.1 and DIN VDE 0801) with reference on IEC300. Part I of IEC300(IEC300-1) covers the essential features of a comprehensive dependability programme for the planning, organization, direction, and control of resources to produce products which will be reliable and maintainable. We consider the contents of IEC300-1; scope, normative references, definitions, management responsibilities, product or project independent programme elements and project specific programme elements.

  • PDF

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF

A Case Study on EAI Implementation for Enterprise Process Integration: Focusing on EAI Project in Deakyo Co (기업 프로세스 통합을 위한 EAI 구축사례: 대교(주)의 EAI 프로젝트를 중심으로)

  • Yoon, Cheol-Ho;Choi, Hea-Seong
    • Journal of Information Technology Services
    • /
    • v.5 no.3
    • /
    • pp.109-119
    • /
    • 2006
  • The company cannot optimize its computing environment just with individual solutions such as ERP(enterprise resource planning), SCM(supply chain management), CRM(customer relationship management), and KM(knowledge management). EAI(enterprise application integration) has emerged as an alternative that can optimize computing environment of the company through integrating such solutions and systems of distributed computing and mainframe environment. This paper reports the case study of Deakyo Co. in successfully implementing EAI. It describes project goal, project organization, project plan, the implemented EAI configuration and its features, the EAI effectiveness to the firm, and the critical success factors of the EAI project. This case study is thought to be useful as a practical guideline in carrying out EAI project of the company and to provide significant basis for constructing the theoretical framework of EAI project methodology.

AGENT-BASED SIMULATION OF ORGANIZATIONAL DYNAMICS IN CONSTRUCTION PROJECT TEAMS

  • JeongWook Son;Eddy M. Rojas
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.439-444
    • /
    • 2011
  • As construction projects have been getting larger and more complex, a single individual or organization cannot have complete knowledge or the abilities to handle all matters. Collaborative practices among heterogeneous individuals, which are temporarily congregated to carry out a project, are required in order to accomplish project objectives. These organizational knowledge creation processes of project teams should be understood from the active and dynamic viewpoint of how they create information and knowledge rather than from the passive and static input-process-output sequence. To this end, agent-based modeling and simulation which is built from the ground-up perspective can provide the most appropriate way to systematically investigate them. In this paper, agent-based modeling and simulation as a research method and a medium for representing theory is introduced. To illustrate, an agent-based simulation of the evolution of collaboration in large-scale project teams from a game theory and social network perspective is presented.

  • PDF

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF