The ERP system which has been adopted as a tool for integration of information systems and for innovation of business process. And it is regarded to be able to maximize the productivity of business process and achieve process innovation based on the best practice incorporated in the ERP. To achieve process innovation through ERP, strong sponsorship from top management and building consensus through the entire organization is required to be backed UP. There are many cases of the failure of Process Innovation due to reluctance of corporate members to change. In the result of the case study, it seems to be difficult to build the consensus of the related groups to ERP project. There are still argues after project, on whether the project was success or not. Through the AHP analysis for the success factors, it is explored that the reason is that several groups of the company had different expectation for the project. And to achieve the aimed process Innovation, the project members in the related departments should build the consensus of expectation on the project.
Journal of Construction Engineering and Project Management
/
v.6
no.1
/
pp.1-10
/
2016
Issues in the construction industry of Cambodia in ASEAN Economic Community (AEC) is the main priority to be identified before identifying causing factors in order to find out recommendations, to improve this sector, and to survive in this community. Two major issues were identified from the literature review and the investigation, namely i) Long-term vision and its policy, and ii) practice culture. The total sample collected from concerned government officers and engineers in Cambodia were 463. Factor analysis was then conducted to find out the issues, and as the results, there are five issues in two main groups: (i) the Organization's vision and its skill, which consist of a vision of the organization, knowledge and skill, and less investmen in the construction sector; (ii) Knowledge and motivation towards the AEC, which consist of knowledge about the AEC, and level to promote organization for the AEC.
From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.
This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.
Kim, Sang-Won;Choi, Yu-Jin;Hong, Seong-Wook;Ahn, Tae-Han
Proceedings of the Korean Institute of Building Construction Conference
/
2017.05a
/
pp.95-96
/
2017
A total of eleven keywords for construction project management engineers to know about safety are as follows. Before the construction, there are two keywords as the safety organization plan and safety management plan, safety compliance, document beach, safety check, safety management fee, hazardous risk prevention plan, safety education, safety accident, seven keywords, There are two keywords of safety inspection comprehensive report, safety management document. It is necessary to understand the keywords well in accordance with the relevant time and to do the best in safety work, and it should be recognized that safety inspection is carried out every month and the safety work should be done faithfully.
Journal of Information Technology Applications and Management
/
v.14
no.3
/
pp.1-14
/
2007
Recently. interests in IT Service Management (ITSM) are increasing internationally as well as domestically. In order to realize the benefits from ITSM, it is necessary to institutionalize it as a culture of the organization through effective change management. One of the most promising approach of effective change management is a Six Sigma technique. In this study, we analyze a success case in which 6 Sigma was applied to Service Desk function which is one of the most important functions of ITSM. Through the analyses, this study aims to propose a feasible and specific approach to institutionalize ITSM. To accomplish the objective. the study analyzed specific methods of application of 6 Sigma to ITSM. performance of the project and future directions based on interview and project document/deliverable review. This study could not provide detailed performance measures due to lack of previous research on this topic and difficulty of obtaining quantitative data. However. this study has contributed to proposing a direction to institutionalize ITSM in organizations by analyzing a feasibility of 6 Sigma in implementing ITSM.
According to the dynamic changes in the business environment, the structural transformation of firms has had an observable trend. An increasingly large number of firms have been transforming into either project-based organizations or project expert groups. This study aims to investigate the antecedents required for the optimal level of empowerment with consideration of the project-based team environmental nature and job characteristic. Three factors are applied to measure the significant effects on psychological empowerment as the result variables. To determine the antecedents and consequent factors of psychological empowerment, employees' interviews and precedent studies are used. For the empirical study, four determinants of empowerment variables are modeled into a second-order reflective construct. This study finds that psychological empowerment significantly affects performance. Therefore, this study can serve as a guideline for development and operating methods for project success.
Journal of Korean Institute of Industrial Engineers
/
v.3
no.2
/
pp.63-72
/
1977
The trend of computerization is significant in Korea even at its beginning stage, especially for governmental administration. However, full-fledged success of computerization in an organization is reported to be rare while the cost of computerization has been high and increasing. This paper is concerned with two features for the successful implementation of a computerized system in an organization selection criteria for the computerization among the possible candidate projects and project selection models. Due to the dearth of literature regarding successful implementation of computerization, other sources of literature with respect to R & D management, method engineering, etc. were reviewed to develop a set of factors influencing successful computerization. Thus, project selection criteria for computerization of governmental administration are developed and organized as follows: cost of computerization project including both system development and operating cost, quanitative and qualitative benefits of computerization project, probability of technical and implementation success of computerization and other organizational and political factors to be considered. These criteria are broken down into detailed sets of subcriteria to be measured. To select a project after thorough consideration of the selection criteria, a project selection model which takes into account all criteria together has to be developed. In the study three project selection models are suggested and developed. They are the checklist model, multi-stage cut-off model, and composite criteria model. A detailed procedure for each of the three models is illustrated. Although the project selection criteria and models are developed here primarily for the computerization of governmental administration, they are easily applicable to other settings of computerization. Finally, some caveats for the use of selection criteria and models are discussed.
Nowadays, the IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques to decrease project failure and to increase IS project performance. This research is to seize the management level of PMO affecting on the IS project, as a new method to increase the IS project development performance. As a result of surveying the present PMO operation state with banks which are the leading industry to accept the PMO in Korea, technology support management and infrastructure management are the core functions to affect the IS performance including schedule management, quality management, and user and stakeholders' satisfaction. Also, the PMO management level is the important point of IS project success. Among the 5 levels PMI suggested, PMO can implement the project effectively at least at the third level. Korean companies introducing the PMO have to do research the PMO core functions and the management levels according to the project scale, and review the distinctive features of their organization to increase the maturity of IS project. This research has been proved through the Full Structural Equation Model. The results show that the five core functions of PMO have relationship with the IS project performance.
Korean Journal of Construction Engineering and Management
/
v.18
no.5
/
pp.41-49
/
2017
The ordering organizations of civil engineering project manage the construction site indirectly because the construction site is mostly located at a remote location and the public official also manages many sites. Since the civil engineering project has a wide working area, it is not easy to know the status of the whole project quickly by the indirect management method by report of the field practitioner. In order to solve these problems, the field management system between the ordering organization and the field office is changing from offline to online. This study suggests an advanced construction site management system that obtains site-related 3D information with the use of UAV and shares the information between the construction site in remote locations and their supervising authorities. To develop an UAV application system, the problems of field management in many actual sites were analyzed and derived necessary functions such as status reporting and online information management. The developed system was applied to actual field to verify its usability and compared the efficiency improvement with existing field management method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.