SAFETY MANAGEMENT ON CONSTRUCTION MANAGEMENT: A CASE STUDY REVIEW

  • Eric Chan
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.249-255
    • /
    • 2011
  • Poor safety management in construction management may adversely affect cost, schedule and quality of a project. Heavy fines upon safety offence becomes a burden to the budget; losing working hours as a result of safety incident impacts on the schedule, and compromising quality is always an indirect consequence when workers perform duties in an unsafe site environment. Therefore, promotion of safety management becomes the top priority in any construction manager's agenda. Working safely will benefit construction project and lead to a "real" success. This paper is a case study, based upon "Geller's 10 principles for achieving a total safety culture", reviewing how a Hong Kong leading construction company fosters the safety culture and possesses a pleasant safety record over years. Its safety performance is not only well ahead the local industry, but also ranges top within the Asia Pacific region and comparable to those mature Western industries. The review concluded that safety culture is one of the major components in construction management and collaboration is the essence to realize this positive culture within an organization. Safety management is not merely a "top down" approach, but requires the positive "bottom up" actions from the other end. The successful story of this company can demonstrate the contribution of safety management in construction management.

  • PDF

건설진도율 산정을 위한 진도관리단위에 관한 연구 (Standardized Progress Measurement Package)

  • 정영수;강승희;진상윤;김예상;정문헌;박순찬
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.565-570
    • /
    • 2004
  • 건설진도율은 프로젝트 성과 측정 및 진행관리의 중요한 요소 중의 하나로서 이용되고 있으나, 작업 진도 산출기준 및 방법이 현장 상황에 따라 다르게 운영되기 때문에 진도 산출의 정확성이 각 현장 특성에 크게 의존되고 있는 실정이다. 즉, 현장별 공사 진행 상태 비교 시 상당한 오류-가 발생될 수 있으며, 그 신뢰도 역시 매우 떨어질 수 있다는 것을 의미한다 따라서 본 연구에서는 모든 현장의 공사 진행 상태를 같은 기준으로 파악이 가능한 전사 차원으로서의 공통 기준인 진도관리단위 및 평가요소를 정의하며, 이와 더불어 진도관리단위 적정성 평가 방안 및 진도산정모델의 프로세스를 제안하고자 한다.

  • PDF

A STUDY OF STRUCTURING OF NEW MANAGEMENT SYSTEM FOR LOCAL GOVERNMENTS IN JAPAN

  • Takashi Goso;Shunji Kusayanagi;Seigo Nasu;Kotomi Uemoto
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.371-376
    • /
    • 2005
  • Administrative works of local governments in Japan always have been led by central government. Local government organizations have gotten used to control of central government, whose organization is divided vertically into divisions. Such organizations as lack of cooperation of each administrative division could not define strategic goal appropriate for their district independently and could not give an efficient and optimized solution to their strategic goal. Under existing management system, it will be difficult for local governments to rapidly adapt to changing society. Under these circumstances, it is necessary for local governments to structure new management system independent on central government's instructions in order to manage appropriately.

  • PDF

대규모 정보시스템 개발 프로젝트를 위한 개념적 작업분담구조도의 모형화에 관한 연구 (Conceptual WBS Model for a Large-Scale Information System Acquisition Project)

  • Nam Yong Lee
    • 한국전자거래학회지
    • /
    • 제6권1호
    • /
    • pp.55-67
    • /
    • 2001
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

글로벌 건설공사의 턴키설계심의제도 성과분석 및 발전방향 (A study on the development direction and performance analysis of design review system in design-build project)

  • 박환표;진경호;이교선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.95-97
    • /
    • 2011
  • The purpose of this study is to suggest the development direction and performance analysis of design review system in design-build project. As a result of surveys, the fairness and transparency of design review system was abruptly increased. But local government has not fairness and transparency. Therefore this research has proposed the integration management and joint application of design review organization in design-build project. So, we expect that the transparency is raised in management of design review committee.

  • PDF

지역 역사문화 아카이빙을 위한 김포 북변동 스토리텔링 사업 (Storytelling Project for Local Historical and Cultural Archiving on Bukbyeon-dong, Gimpo-si)

  • (협)아카이빙네트워크연구원
    • 한국기록관리학회지
    • /
    • 제19권1호
    • /
    • pp.275-281
    • /
    • 2019
  • 본 글은 2018년 김포문화재단에서 주관한 김포시 북변동 스토리텔링 사업을 소개한 글이다. 프로젝트는 지역의 역사와 문화자원을 아카이빙 하기 위해서 수행되었다. 세부 과업으로는 조사, 답사, 구술채록, 스토리 정리, 콘텐츠 활용방안 제시 등이었다. 이와 함께 프로젝트를 수행하는 과정에서 느낀 프로젝트의 한계와 의미, 지역 역사문화자원 발굴의 의미, 지역 아카이브의 필요성을 함께 보고한다.

조계종 총무원 보존기록물 정리방법에 대한 사례연구 (A Case Study on Arranging Archives of Administrative Headquarters of the Jogye Order)

  • 이아현
    • 기록학연구
    • /
    • 제6호
    • /
    • pp.121-160
    • /
    • 2002
  • This paper reports the project of arranging archives of Administrative Headquarters of the Jogye Order. It illustrates the whole process of preliminary survey, arrangement, appraisal and description of the archives. One of the distinctive features of the project lies in its focus on practical considerations. In other words, it has avoided blindly following theoretical recommendations made by previous efforts. First step of the project has been to review the current state of the archives through preliminary survey as well as analysis of related regulations. Second step has followed to establish actual process of classifying, appraising, describing, filing and designing storage facility management as well as a computerized archival management system. In this process, every concern has been given to prevent records and archives from physical damage and to ensure their intellectual order kept so that archival information could be re-constructed and usability and efficiency of the records could be secured. Major contributions made by the project can be found in that it has reviewed the volume of administrative archives created and held by Jogye Order and improved the overall efficiency of as well as information sharing among personnel at the Headquarter. The most notable accomplishment could be, however, found in that the project has helped the personnel to rediscover their own history from their records, rather than from their memory. From the theoretical perspective of archival science, the meaning of the project can also be found in that it has provided with the starting point toward establishing organizing methodology for organizational archives including religious archives. Arranging archives of an organization requires archivists to respect theories and principles, but at the same time, adequate attention should be paid to reflect idiosyncratic characteristics of the organization. General methods applicable to a wider range of archives could be derived from the very endeavor. Though impossible in a short period of time, it could be accomplished by accumulating theoretical and practical knowledge and experience.

Risk Factors Affecting Equipment Management in Construction Firms

  • PHAM, Cuong Phu;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To;LE, Loan Phuc;DUONG, My Tien Ha
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권11호
    • /
    • pp.347-356
    • /
    • 2020
  • Mechanization and automation constitute an essential stage in the production and operation of any company, as one of the determinants of increase in labor productivity and decrease in product price, while significantly contributing to shortening of the lead time. Businesses are, therefore, able to quickly put projects into operation, improving economic efficiency, quality, and aesthetics, which speeds up the national economic growth. For the construction industry to be the most effective, modern construction equipment is a necessity. It is one of the five main resources of a construction project. Thus, effective construction equipment management contributes to the success of a project and benefits the relevant construction companies economically. This paper presents the critical risk factors affecting equipment management and proposes suitable solutions. The questionnaire-based survey with experienced experts in the construction sector on the management of the likelihood and consequence of risk factors revealed thirty-two risks for equipment management in construction companies. These factors fell into six groups: (i) site organization-related risks; (ii) management-related risks; (iii) owner-related risks; (iv) supplier-related risks; (v) legal risks, and (vi) site condition-related and external risks. The results showed that management-related factors contributed to the most significant risks and problems for equipment management in construction companies.

정보시스템 개발 프로젝트 참여 만족도 결정요인에 관한 연구: SI 프로젝트 참여인력 만족도 중심으로 (A Study on Determinants of Participants' Satisfaction in Information System Development Project: Focused on Outsourcing Project Participants' Satisfaction)

  • 이주량;서길수
    • 경영정보학연구
    • /
    • 제8권1호
    • /
    • pp.203-222
    • /
    • 2006
  • 아웃소싱 방식의 정보시스템 개발 프로젝트(SI 프로젝트)는 참여인력들의 만족도가 매우 낮은 것으로 알려져 있다. 이로 인해 잦은 전직과 이직, 프로젝트 참여 기피 등의 고질적인 문제가 발생하고, 프로젝트 성패에도 악영향을 미치고 있다. 참여인력들의 만족도 향상을 위해서는 프로젝트 참여만족도를 결정하는 요인들의 명확한 규명을 통한 개선이 필요하다. 프로젝트 참여만족도는 직무만족도의 일종으로 볼 수 있다. 선행연구에 의하면, 직무만족도는 직무특성과 무관한 급여, 보상, 명성 등의 일반 요인과 직무특성에 기인한 특화요인에 의하여 결정된다. 본 연구에서는 현업에서 프로젝트 참여만족도 측정에 널리 사용되는 PMI 설문에 기초하여, 정보시스템 개발 프로젝트의 특성에 기인하는 특화요인으로, 프로젝트 이행약정, 업무량과 업무시간, 프로젝트 통제, 조직내 의사소통, 조직간 의사소통, 방법론(프로세스) 영향도의 6가지 요인에 대하여 확인하고, 프로젝트 참여만족도 결정요인으로 적합한가에 대하여 66개 프로젝트에 참여한 390명의 데이터를 통해 검증했다. 연구 결과, 6개의 결정요인은 모두 프로젝트 참여만족도를 결정하는 요인으로 볼 수 있었다. 즉, 프로젝트 참여 인력들의 만족도는 프로젝트 이행약정과 프로젝트 통제, 의사소통, 프로젝트 방법론 등에 민감하게 반응하는 것으로 나타났다. 특히, 벤더 사(社) 참여인력 들의 만족도는 단순히 많은 업무량과 강한 업무강도 보다는 무리한 프로젝트 이행약정과 계획의 잦은 변경 및 불합리한 프로젝트 통제에 의하여 더욱 저해되는 것을 확인할 수 있었다. 따라서 참여자들의 프로젝트 참여 만족도를 신장시키고, 궁극적으로 프로젝트의 성과를 높이기 위해서는 단편적인 처방과 개선에서 벗어나 프로젝트 이행약정을 비롯한 프로젝트 특화요인들에 대한 종합적인 접근과 해결책이 필요할 것이다.

건설 발주자 설계 요건관리 체계화를 위한 개념적 틀 및 정보특성 (Requirements Management Framework for Design Management and Information Characteristics)

  • 정예흔;이윤섭;정영수
    • 한국건설관리학회논문집
    • /
    • 제21권6호
    • /
    • pp.3-15
    • /
    • 2020
  • 성공적 건설 프로젝트의 수행을 위해 발주자의 요구사항을 명확히 정의하고, 전 생애주기를 포괄하여 각 사업 참여자의 전문기술을 통해 이를 프로젝트에 반영해야 한다. 이에 프로젝트 요건을 정보관리 차원에서 체계화 관리하기 위한 요건관리(Requirements Management)의 개념 정립이 요구된다. 본 연구에서는 건축분야 요건관리의 개념을 포괄적으로 정의하고, 요건정보 유형과 정보 분석기준을 제시하여 설계 요건정보를 효율적으로 관리하기 위한 방법론적 기반을 마련하고자 하였다. 또한 이를 사례연구에 적용하여 요건정보를 도출 및 분석하였으며, 발주자 설계관리 및 지식관리 관점에서 요건관리 시스템화 방향을 제안하였다.