• Title/Summary/Keyword: Project Management Capability

Search Result 221, Processing Time 0.024 seconds

Comparison of SE-CMM and KEPIC QAP-1 for Assessing Capability Level of Nuclear QA (원자력 QA의 능력수준 평가를 위한 SE-CMM과 KEPIC QAP-1간의 비교)

  • Lee Sun Kee
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.4
    • /
    • pp.1-14
    • /
    • 2004
  • Nuclear project company establishes and maintains its QA system in the conformance with applicable Codes & Standards and contract provisions. Certifying agency(e.g., Korea Electric Association) or project owner appraises the effectiveness of the company QA system by surveying or auditing it. However, although the company fulfills the requirements of this survey/audit, the capability level of its nuclear QA system is not appraised numerically and developed in that KEPIC QAP-1, used by the company as a nuclear QA guidebook, does not describe an approach for managing the capability level of the QA system. This study evaluates the characteristics of QAP-1 from the viewpoint of SE-CMM(Capability Maturity Model for Systems Engineering) in order to suggest a possible solution.

An assessment of the Systems Engineering Capability Maturity of the Railway Safety Project applied the Systems Engineering (시스템엔지니어링을 적용한 철도안전프로젝트의 시스템엔지니어링 능력성숙도 평가)

  • Choi, Yo Chul;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.55-61
    • /
    • 2008
  • In this paper, there is the case study which assesses the systems engineering capability maturity of the safety organization that performs the Railway Safety project using systems engineering method. To In ore effective and efficient a research and development to railway safety domain, a new research and development method can be progressively needed such as systems engineering. To assess quantitatively research of systems engineering efforts in the railway safety project, SECM(EIA/IS 731) Standard is utilized in the paper. It is by questionnaire that the capability maturity assessment is executed wit h the safety organization and staffs who performs the systems engineering activities; requirement analysis and management, interface control management. product verification and validation, and so on. As a result, the systems engineering capability level of the safety organization rises from 0 level at the initial project to 2 level after two years and all staffs give an affirmative answer about the importance and effectiveness of the systems engineering approach.

  • PDF

Development of evaluation model on PMIS function using CMM - Focused on Project Communication Management - (CMM개념을 활용한 건설 PMIS 평가 모델 개발 - 프로젝트 의사전달관리를 중심으로 -)

  • Park Jeong-Ha;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-463
    • /
    • 2002
  • The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports. A major problem for constriction companies is the lack of project assessing model for project management. One method of solving the problem is through the systematic management of construction processes. A development of model for assessing PMIS practice is attempting to develop a stepwise process assessment framework for the construction industry using Capability Maturity Model. This paper have provided further insights into the understanding of the framework, as well as its value for construction sector.

  • PDF

A Study of Project Management Capability in Global Information System Projects (글로벌 IS 프로젝트 관리 역량에 관한 연구)

  • Kim, Gyeung-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.225-232
    • /
    • 2010
  • 글로벌 IS 소싱이 확산됨에 따라 다국적 팀원들로 구성된 글로벌 프로젝트 팀이 급격히 늘어나고 있다. 상이한 시간대에 위치한 팀원 간의 상호작용이 필수적인 글로벌 프로젝트는 이러한 시간적, 공간적 복잡성 때문에 프로젝트의 성공적 수행에 많은 어려움을 겪고 있다. 본 연구는 성공적인 글로벌 프로젝트 수행에 필요한 프로젝트 관리 역량에 대한 탐색적인 연구 조사를 하고자 한다. 본 연구는 글로벌 프로젝트 관리 역량을 정보 기술적 역량(IT capability)과 인적 자원 역량(human resource capability)의 관점에서 고찰하였다. 연구 결과에 따르면 기술적 역량으로는 팀원 간의 조정 및 지식 공유 등을 지원하는 협업 도구(collaborative tools)가 프로젝트 성공에 중요한 역할을 하고, 인적 자원 역량과 관련해서는, 기존에 중요시 여겨지던 기술적 지식들 보다는 경영학적 관리 지식 및 의사 소통 능력 등이 중요시 여겨지는 것으로 나타났다. 인적 역량의 관점에서, 본 연구 결과는 해외소싱이 활발해 짐에 따라 프로젝트 관리자(Project Manager, PM)들이 가져야 하는 주요지식으로 기존의 기술적 지식의 비중은 급격히 줄어든 반면, 의사소통 능력, 해외개발 인력관리, 소싱전략 등과 같은 관리에 대한 지식과 비즈니스 업무지식이 점차 중요해 지고 있음을 보여주고 있다. 한국의 해외 소성은 매우 초기 단계에 있지만 본 연구는 차제에 한국의 IT 인력 특히 PM 인력들이 갖추어야 하는 지식요건과 해외소성을 관리하기 위한 기술적 역량 등에 대한 방향을 제시하고 있다는 점에서 의의가 있다.

Development of standard logic network for PWR NSSS System design (경수로계통설계 표준 Logic Network의 개발)

  • 박준원;이병령;이판권;이해준;송태길;김동희;최현호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.212-226
    • /
    • 1993
  • The self-reliance of NSSS System Design is required not only the design capability to perform the system design but also the management capability to control the resource and time for the Project effectively. The purpose of this study is to develop the simplified standard Logic Network that is scheduled on the time and resource using the PERT/CPM method. That is mainly focused on Ulchin 3&4 Project. We prepare the management tool of NSSS System Design project. And we can utilize it as a reference tool for the similar project which are complex and long term in a next project.

  • PDF

A Reference Model for Audit and Project Management in the Information Technology using the CMM (CMM 기반 정보기술 프로젝트 관리 및 감리 참조 모델에 관한 연구)

  • 김태달
    • Journal of Internet Computing and Services
    • /
    • v.2 no.2
    • /
    • pp.11-22
    • /
    • 2001
  • For the effective and efficient management of the information system development project. the domestic market is also required to manage the project and set up the information system audit items, which are applicable to the actual project using CMM(Capability Maturity Model). With this thesis, we suggest a reference model complimenting the project. by letting a project manager recognize beforehand the present maturity status, within an organization as well as step-by-step management items and audit indicators for the future capability maturity improvement.

  • PDF

The Effects of Project-Based Organizational Resources on the Business Performance (프로젝트 조직자원이 경영성과에 미치는 영향)

  • Jin, Sangjoon;Oh, Minjeong;Park, Sohyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.30-40
    • /
    • 2018
  • The purpose of this study is to examine the effect of project-based organizational resources on the business performance in the resource-based view (RBV) and dynamic capability one and analyze their relationship through an integrated model. The RBV argues that firms get competitive advantages when they have VRIN characterized resources but dynamic capability view argues that RBV has its limitation under volatility so it enables them to obtain competitive advantages in ever changing environments. This study analyzes data collected from 270 survey questionnaires on the project management related staff at the project-based organization among major companies in Korea. The result demonstrates that two project organizational resources on strategic and executional management with VRIN characteristics are found to bring positive effects on the organizational dynamic capabilities and also the dynamic capabilities such as integration & reconfiguration, organizational learning are verified to bring meaningful positive effects on the business performance. On the other hand, unlike previous studies, ambidexterity has quite a weak effect on the business performance. Therefore, we expect that the resources of the project-based organization with VRIN lead to strengthen the firm's business performance through organizational dynamic capabilities and produce high performance through the integrated model of RBV and dynamic capability one. The study has academic meanings that widely confirm the effects and characteristics of main elements of VRIN project organizational resources on the business performance of competitive advantage through the dynamic capabilities of the organization by the regression on the precedent studies regarding the project management resources and their relationship with the VRIO characteristics. The practical implication is that it is preferentially necessary for the organization to obtain VRIN resources and organizational dynamic capabilities, especially organizational learning to have sustainable competitive advantages.

Analysis of Competency Assessment Using IPA for Construction Project Managers (IPA 기법을 활용한 현장소장 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Lee, Na-Kyung;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.115-123
    • /
    • 2013
  • Changes have occurred in the professional capabilities of the construction project managers after the global financial crisis. As representatives of construction companies and projects, construction project managers have full responsibility over a construction project. Throughout its life cycle, from design through construction to completion, the business capabilities of such managers are regarded as critical elements in the changes in the country's construction economy. Therefore, this study aimed to determine the main capabilities of current construction project managers, and to analysis of its competitiveness using Important-Performance Analysis(IPA). The results of IPA were as follows; (1)capability to win new contracts and capability to collect information of new project are needed for external relation competitiveness, (2)gerentocratic management mind-set and active breakthrough are needed for internal project management competitiveness, and (3)capability to predict issues and self-improvement are needed for self discipline competitiveness. However, this work is still considered to provide the basic data that can help Korean construction companies who plan to educate the project manager's strengthen their medium and long-term capabilities.

Analyzing the Relationship between Dynamic Capability of Project-Based Organization and the Competitive Advantage in the E&C Companies (프로젝트 조직의 동적역량과 건설기업 경쟁우위와의 상관관계 분석)

  • Jin, Sangjoon;Oh, Minjeong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.73-85
    • /
    • 2019
  • Since the beginning of a new century, many Korean construction and engineering companies are facing a very dynamic and fast changing business environment which includes severe competition, higher risk, economic depression, declining revenues and profits, etc. In order to cope with these challenges, they need to secure special capabilities to actively adapt to the paradigm changes. One of those capabilities could be project management capability which allows us to manage organizational resources dynamically and integratively based on project portfolio management concept. The objective of this study is to investigate how the dynamic capability of a project-based organization to control the resource affects the firm performance and the competitive advantages. Data was collected from the construction and engineering companies in South Korea by using survey questionnaire, and analyzed for empirical tests by using statistical methods such as structural equation modelling and path analysis. The results showed that the organizational resources, if they had the VRIN characteristics, would have positive impacts on creating the dynamic capabilities for project organization. In turn, the dynamic capabilities of a project organization would have impacts on improving business performance and creating competitive advantages. Also, it was found that the organizational resources may have direct impact on business performance and competitive advantages. The academic contribution of this study is that it attempts to integrate resource based view and the dynamic capability theory about creating competitive advantages for project based organization. This study also provided practical implications to the companies in construction industry by showing how to use organizational resources strategically to create competitive advantages.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.