• Title/Summary/Keyword: Project Lifecycle

Search Result 62, Processing Time 0.025 seconds

Development of BIM-based bridge maintenance system for cable-stayed bridges

  • Shim, Chang-su;Kang, Hwirang;Dang, Ngoc Son;Lee, Deokkeun
    • Smart Structures and Systems
    • /
    • v.20 no.6
    • /
    • pp.697-708
    • /
    • 2017
  • Maintenance plays a critical role in the bridge industry, but actual practices show many limitations because of traditional, 2D-based information systems. It is necessary to develop a new generation of maintenance information management systems for more reliable decision making in bridge maintenance. Enhancing current work processes requires a BIM-based 3D digital model that can use information from the whole lifecycle of a project (design, construction, operation, and maintenance) through continuous exchanges and updates from each stakeholder. This study describes the development of a data scheme for maintenance of cable-stayed bridges. We implemented the proposed system for a cable-stayed bridge and discussed its effectiveness.

A Case Study on Function Point Method applying on Monte Carlo Simulation in Automotive Software Development

  • Do, Sung Ryong
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.6
    • /
    • pp.119-129
    • /
    • 2020
  • Software development activities are influenced by stochastic theory rather than deterministic one due to having process variability. Stochastic methods factor in the uncertainties associated with project activities and provides insight into the expected project outputs as probability distributions rather than as deterministic approximations. Thus, successful software projects systematically manage and balance five objectives based on historical probability: scope, size, cost, effort, schedule, and quality. Although software size estimation having much uncertainty in initial development has traditionally performed using deterministic methods: LOC(Lines Of Code), COCOMO(COnsructive COst MOdel), FP(Function Point), SLIM(Software LIfecycle Management). This research aims to present a function point method based on stochastic distribution and a case study based on Monte Carlo Simulation applying on an automotive electrical and electronics system software development. It is expected that the result of this paper is used as guidance for establishing of function point method in organizations and tools for helping project managers make decisions correctly.

A Study on the Correlation between the Building Perimeter and Safety Management Cost (건물의 외주길이와 안전관리비의 상관관계 분석에 관한 연구)

  • Han, Bum-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.359-370
    • /
    • 2022
  • Despite continuous efforts to reduce on-site safety accidents, the construction industry remains a high-risk sector with a high rate of fatal accidents. Design for Safety(DFS), which manages safety risk factors at the design stage, is being used as a method to lower the construction safety accident rate. However, due to limited knowledge, designers are unaware of the design-results risks during the different of the project lifecycle, including construction, operation, and maintenance. Effective DFS can be conducted if the designer understands the effect of the building shape on the safety accident rate and corresponding safety management cost(SMC). The cost of safety facilities such as fall prevention nets and safety fences will vary depending on the shape of the building. This study analyzes the outer perimeter length's impact on SMC. Following the data collection from 21 projects for this study, an analysis was conducted using the independent variables of the building perimeter(BP), building shape factor(BSF), and building area(BA), the dependent variable of SMC. The correlation R2 was found to be 0.876, 0.801 and 0.792 between the BP and SMC, BSF and SMC, BA and SMC, respectively, indicating that these factors were closely related.

New shipyard layout design for the preliminary phase & case study for the green field project

  • Song, Young Joo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.5 no.1
    • /
    • pp.132-146
    • /
    • 2013
  • For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

A Study on the Lifecycle of the Offshore Plant and the Simulation with DMU and Ergonomics (해양플랜트 수명주기 고찰과 조립 및 인간공학 시뮬레이션 적용에 관한 연구)

  • Lee, Yong-Gil;Woo, Jong-Hun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.4
    • /
    • pp.457-466
    • /
    • 2015
  • In this paper, the academic research on the value chain and the supply chain of offshore business are conducted for the investigation of the offshore business comprehensive configuration. Then, the assembly and ergonomic simulation was conducted for the purpose of advanced validation of offshore project.. With respect to the simulation analysis, the assembly simulation model(w.r.t. drill ship) and the ergonomic simulation model(w.r.t. FPSO) are constructed. Through the assembly simulation of drillship, the production processes could be validated in terms of availability. Also, the problem of topside design of FPSO was found by ergonomic simulation.

Study on ISA's assessment to software process for EN50128 SIL4 (EN50128 SIL4 소프트웨어 프로세스 ISA 인증 사례 연구)

  • Cho, Chi-Hwan;Kang, Chan-Yong;Hwang, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.838-849
    • /
    • 2010
  • It is inevitable to control the systematic failure to obtain the software safety integrity of embedded software installed in rolling stock. Because it is not possible to assess systematic failure integrity by quantitative methods, SILs are used to group documentation, methods, tools and techniques throughout software development lifecycle which, when used effectively, are considered to provide an appropriate level of confidence in the realization of a system to a stated integrity level. Normally, safety approval process is through generic product, generic application and specification application for. For safety approval on generic application of software based system, it is required to apply the certified software processes from the planning stage for the assigned SIL. As such, we will develop project specific application with high safety integrity within time limit of contractual delivery schedule through software assessment to the modified area with the re-use of certified software module and documentation. At this point, Hyundai Rotem has developed software processes applicable to support SIL 4 based on EN50128 which was assessed and certified by TUV SUD. This paper introduces the Hyundai Rotem's detailed approach and prospective action to achieve software safety integrity level.

  • PDF

FAULT TREE ANALYSIS OF KNICS RPS SOFTWARE

  • Park, Gee-Yong;Koh, Kwang-Yong;Jee, Eunk-Young;Seong, Poong-Hyun;Kwon, Kee-Choon;Lee, Dae-Hyung
    • Nuclear Engineering and Technology
    • /
    • v.40 no.5
    • /
    • pp.397-408
    • /
    • 2008
  • This paper describes the application of a software fault tree analysis (FTA) as one of the analysis techniques for a software safety analysis (SSA) at the design phase and its analysis results for the safety-critical software of a digital reactor protection system, which is called the KNICS RPS, being developed in the KNICS (Korea Nuclear Instrumentation & Control Systems) project. The software modules in the design description were represented by function blocks (FBs), and the software FTA was performed based on the well-defined fault tree templates for the FBs. The SSA, which is part of the verification and validation (V&V) activities, was activated at each phase of the software lifecycle for the KNICS RPS. At the design phase, the software HAZOP (Hazard and Operability) and the software FTA were employed in the SSA in such a way that the software HAZOP was performed first and then the software FTA was applied. The software FTA was applied to some critical modules selected from the software HAZOP analysis.

A Study of RAMS Analysis and Assessment Activities for Automatic Train Protection System based on ERTMS/ETCS Level 1 (차상신호시스템(ERTMS/ETCS Level 1) 적용에 따른 위험분석 및 평가활동 연구)

  • Shim, Kyu-Don;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.2
    • /
    • pp.121-129
    • /
    • 2011
  • This paper presents the methods to acquire the Safety Certificate from Independent Safety Assessment based on the IEC or EN standard which is commonly applied to railway system for Automatic Train Protection (ATP) system in accordance with ERTMS/ETCS Level 1 system. This also shows approach methods and relative activities for project lifecycle to accomplish and ensure the system requirements of ATP system, RAMS and system quality activities. These kind of activities for quality assurance of ATP system to obtain Safety Certificate could improve the quality of domestic railway system based on On-Board system of ERTMS/ETCS Level 1 and also contribute to the growth of railway business.

Introduction to US EPA Smart Scoping Technical Guide for Improving Pollution Site Investigation (국내 오염부지 조사 개선을 위한 US EPA 스마트 스코핑 기술 소개)

  • Kim, Bomin;Kim, Han-Suk;Kwon, Man Jae;Jo, Ho Young
    • Journal of Soil and Groundwater Environment
    • /
    • v.25 no.2_spc
    • /
    • pp.70-85
    • /
    • 2020
  • This paper introduces the 'Smart Scoping for Environmental Investigations Technical Guide' issued by the US Environmental Protection Agency in 2018, which describes the use of smart scoping during lifecycle of remedial investigation projects. This paper also briefly summarizes the guidelines of soil and groundwater contamination investigation of South Korea. The smart scoping practices can support the development of a robust and realistic conceptual site model that is very useful for investigations and evaluations of the contaminated site. The application of evaluation tools relevant for the site-specific characteristics is important for the development of a conceptual site model. The smart scoping recommends the use of previous investigation data and implementation of best proven strategies for successful remedial investigation project. The use of smart scoping in contaminated site investigation will provide better management of contaminated sites.

Digital engineering models for prefabricated bridge piers

  • Nguyen, Duy-Cuong;Park, Seong-Jun;Shim, Chang-Su
    • Smart Structures and Systems
    • /
    • v.30 no.1
    • /
    • pp.35-47
    • /
    • 2022
  • Data-driven engineering is crucial for information delivery between design, fabrication, assembly, and maintenance of prefabricated structures. Design for manufacturing and assembly (DfMA) is a critical methodology for prefabricated bridge structures. In this study, a novel concept of digital engineering model that combined existing knowledge of DfMA with object-oriented parametric modeling technologies was developed. Three-dimensional (3D) geometry models and their data models for each phase of a construction project were defined for information delivery. Digital design models were used for conceptual design, including aesthetic consideration and possible variation during fabrication and assembly. The seismic performance of a bridge pier was evaluated by linking the design parameters to the calculated moment-curvature curves. Control parameters were selected to consider the tolerance control and revision of the digital models. Digitalized fabrication of the prefabricated members was realized using the digital fabrication model with G-code for a concrete printer or a robot. The fabrication error was evaluated and the design digital models were updated. The revised fabrication models were used in the preassembly simulation to guarantee constructability. For the maintenance of the bridge, the as-built information was defined for the prefabricated bridge piers. The results of this process revealed that data-driven information delivery is crucial for lifecycle management of prefabricated bridge piers.