Development of Hard-wired Instrumentation and Control for the Neutral Beam Test Facility at KAERI

  • Jung Ki-Sok;Yoon Byung-Joo;Yoon Jae-Sung;Seo Min-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • v.1 no.3
    • /
    • pp.359-365
    • /
    • 2006
  • Since the start of the KSTAR (Korea Superconducting Tokamak Advanced Research) project, Instrumentation and Control (I&C) of the Neutral Beam Test Facility (NB-TF) has been striving to answer diverse requests arising from various facets during the project's development and construction phases. Hard-wired electrical circuits have been designed, tested, fabricated, and finally installed to the relevant parts of the system. In relation to the vacuum system I&C, controlling functions for the rotary pumps, a Roots pump, two turbomolecular pumps, and four cryosorption pumps have been constructed. I&C for the ion source operation are the temperature and flow rate signal monitoring, Langmuir probe signal measurements, gradient grid current measurements, and arc detector circuit. For the huge power system to be monitored or safely operated, many temperature measurement functions have also been implemented for the beam line components like the neutralizer, bending magnet, ion dump, and calorimeter. Nearly all of the control and probe signals between the NB test stand and the control room were made to be transmitted through the optical cables. Failures of coolant flow or beam line vacuum pressure were made to be safely blocked from influencing the system by an appropriate interlock circuit that will shut down the extraction voltage application to the system or prevent damages to the vacuum components. Preliminary estimation of the beam power through the calorimetric measurement shows that 87.9% of the total power of the 60kV/18A beam with 200 seconds duration is absorbed by the calorimeter surface. Most of these I&C results would be highly appropriate for the construction of the main NBI facility for the KSTAR national fusion research project.

Software Equation Based on Function Points (기능점수 기반 소프트웨어 공식)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.17D no.5
    • /
    • pp.327-336
    • /
    • 2010
  • This paper proposed software equation that is relation with effort and duration based on function point (FP) software size. Existent software equation based on lines of code (LOC). LOC sees big difference according to development language and there are a lot of difficulties in software size estimation. First, considered method that change LOC to FP. But, this method is not decided definitely conversion ratio between LOC and FP by development language. Also, failed though the conversion ratio motives software formula because was not presented about specification development language. Therefore, we derived software formula directly to large project data that was developed by FP. Firstly, datas that reasonable development period is set among development projects. Secondly, FP through regression analysis about this data and effort, motived relation with FP and duration. Finally, software equation was derived from these relation. Proposed model solves application problems that LOC-based model has and has advantage that application is possible easily in business.

The Estimation of Non-Working days for the Construction Project in Incheon Region (기후요소를 고려한 인천지역의 작업불가능일수 산정)

  • Shin Jong-Hyun;Lee Jin-Ah;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.58-64
    • /
    • 2005
  • We should consider climatic factors influencing construction works in order to estimate construction time correctly. This study is to analyze climate elements affecting construction duration and to calculate non-working days far Inchoen territorial region. Through surveying literatures and examining several existing criteria we suggest a Proper criteria for each climate elements which would be used for estimating non-working days. The criteria is made on the raw climate data of Meteorological Administration during the last 30 years(1974-2003) far Incheon region. In case of rainfall, it is estimated as non-working days when daily precipitation is expected more than 10mm, its number of days for Incheon is 29 days. In case of low temperature, the number of non-working days for the concrete works(its criteria be below $4^{\circ}C$ average) and the finishing works(below $0^{\circ}C$ average) is 97 days, 52 days, respectively. In case of high temperature, it is three days when daily highest temperature is expected going over $32^{\circ}C$

Estimation of Erosion Index Based on Impact Signal Analysis (충격 신호 분석에 기반한 침식 지수 개발)

  • Tenorio, Ricardo S.;Kwon, Byung Hyuk;Moraes, Macia C. da S.;Yoon, Hong-Joo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.15 no.3
    • /
    • pp.543-552
    • /
    • 2020
  • This study is aimed at determining an algorithm capable of estimating the erosion index of rainfall for the region of Maceió-Alagoas in the northeast of Brazil. The sample of the truncated data from 2003 to 2006 counts 26,889 droplet size distributions integrated per minute, with 680 rain events with duration longer than 10 minutes. The equation proposed to estimate erosion index used as a dependent variable and independent variable, presenting a coefficient of determination of 99%. The statistical significance validated the relation between minimum rainfall intensity and erosion.

Estimation of Design Rainfall by the Regional Frequency Analysis using Higher Probability Weighted Moments and GIS Techniques (III) - On the Method of LH-moments and GIS Techniques - (고차확률가중모멘트법에 의한 지역화빈도분석과 GIS기법에 의한 설계강우량 추정 (III) - LH-모멘트법과 GIS 기법을 중심으로 -)

  • 이순혁;박종화;류경식;지호근;신용희
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.5
    • /
    • pp.41-53
    • /
    • 2002
  • This study was conducted to derive the regional design rainfall by the regional frequency analysis based on the regionalization of the precipitation suggested by the first report of this project. According to the regions and consecutive durations, optimal design rainfalls were derived by the regional frequency analysis for L-moment in the second report of this project. Using the LH-moment ratios and Kolmogorov-Smirnov test, the optimal regional probability distribution was identified to be the Generalized extreme value (GEV) distribution among applied distributions. regional and at-site parameters of the GEV distribution were estimated by the linear combination of the higher probability weighted moments, LH-moment. Design rainfall using LH-moments following the consecutive duration were derived by the regional and at-site analysis using the observed and simulated data resulted from Monte Carlo techniques. Relative root-mean-square error (RRMSE), relative bias (RBIAS) and relative reduction (RR) in RRMSE for the design rainfall were computed and compared in the regional and at-site frequency analysis. Consequently, it was shown that the regional analysis can substantially more reduce the RRMSE, RBIAS and RR in RRMSE than at-site analysis in the prediction of design rainfall. Relative efficiency (RE) for an optimal order of L-moments was also computed by the methods of L, L1, L2, L3 and L4-moments for GEV distribution. It was found that the method of L-moments is more effective than the others for getting optimal design rainfall according to the regions and consecutive durations in the regional frequency analysis. Diagrams for the design rainfall derived by the regional frequency analysis using L-moments were drawn according to the regions and consecutive durations by GIS techniques.

Non Working Day Estimation in the Construction Project in Cheongju and Chungju Region Considering Weather Condition (기후조건에 따른 청주지역의 작업불능일 산정)

  • Baek, Dae-Hyun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.558-561
    • /
    • 2007
  • In this paper, non working day for the construction project in Cheongju and Chungju region considering weather condition was estimated. In Cheongju region, non working day for outside and half outside work was 157days and for interior work 144days. For Chungju region, non working day for outside and half outside work was 160days and for interior work 144days. Non working day affected by temperature was 144 days at both Chungju and Cheongju. Non working day due to low temperature was 109 days and it due to high temperature was 45 days for Choengju. In Chungju, it was 11Sdays for cold weather, while it due to hot weather was 29 days.Non working day due to rainfall was 23 days at both region. To reduce the deviation between estimated non working days and measured ones, proper selection of the duration is required.

  • PDF

Estimation of Design Flood Considering Time Distribution of Rainfall (강우 시간분포를 고려한 설계홍수량산정)

  • Park, Jae-Hyun;Ahn, Sang-Jin;Hahm, Chang-Hahk;Choi, Min-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1191-1195
    • /
    • 2006
  • Now days, heavy storm occur to be continue. It is hard to use before frequency based on flood discharge for decision that design water pocket structure. We need to estimation of frequency based on flood discharge on the important basin likely city or basin that damage caused by flood recurrence. In this paper flood discharge calculated by Clark watershed method and SCS synthetic unit hydrograph method about upside during each minute of among time distribution method of rainfall, Huff method choosing Bocheong Stream basin that is representative basin of International Hydrologic Project (IHP) about time distribution of rainfall that exert big effect at flood discharge estimate to research target basin because of and the result is as following. Relation between probability flood discharge that is calculated through frequency analysis about flood discharge data and rainfall - runoff that is calculated through outward flow model was assumed about $48.1{\sim}95.9%$ in the case of $55.8{\sim}104.0%$, SCS synthetic unit hydrograph method in case of Clark watershed method, and Clark watershed method has big value overly in case of than SCS synthetic unit hydrograph method in case of basin that see, but branch of except appeared little more similarly with frequency flood discharge that calculate using survey data. In the case of Critical duration, could know that change is big area of basin is decrescent. When decide time distribution type of rainfall, apply upside during most Huff 1-ST because heavy rain phenomenon of upsides appears by the most things during result 1-ST about observation recording of target area about Huff method to be method to use most in business, but maximum value of peak flood discharge appeared on Huff 3-RD too in the case of upside, SCS synthetic unit hydrograph method during Huff 3-RD incidental of this research and case of Clark watershed method. That is, in the case of Huff method, latitude is decide that it is decision method of reasonable design floods that calculate applying during all $1-ST{\sim}4-TH$.

  • PDF

Estimation of Water Quality Improvement Benefit Using Replacement Cost Approach (대체비용법을 이용한 하천 수질개선편익 산정)

  • Yeo, Kyu-Dong;Yi, Choong-Sung;Kim, Gil-Ho;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.4
    • /
    • pp.343-353
    • /
    • 2009
  • The objective of this study is to evaluate the effect of the water quality improvement by water discharge through dams and to provide a benefit estimation methodology, taking domestic situation into consideration, by the replacement cost approach analyzed with a sewage treatment plant instead of an alternative dam. To this end, facility that alternates a dam must have same functions of the discharged water from the dam and the two facilities must be able to be compared objectively. To estimate the benefit, estimation methodology of alternative facility's cost is established and criteria of cost.benefit analysis that are duration period and ratio of large scale repairing expense was presented. As a case study, the water quality improvement benefit of Song-Li-Won dam was evaluated, which is planned to be built on Nae-Sung stream in Nak-Dong River system. The results of applying this methodology to Song-Li-Won dam are 644,006 million won of the annual average discharge and 1,351,526 million won of maximum discharge. The usage of the framework in this study is expected for estimation of water quality improvement benefit in case water quality improvement project is performed.

Enhanced Spatial Covariance Matrix Estimation for Asynchronous Inter-Cell Interference Mitigation in MIMO-OFDMA System (3GPP LTE MIMO-OFDMA 시스템의 인접 셀 간섭 완화를 위한 개선된 Spatial Covariance Matrix 추정 기법)

  • Moon, Jong-Gun;Jang, Jun-Hee;Han, Jung-Su;Kim, Sung-Soo;Kim, Yong-Serk;Choi, Hyung-Jin
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.5C
    • /
    • pp.527-539
    • /
    • 2009
  • In this paper, we propose an asynchonous ICI (Inter-Cell Interference) mitigation techniques for 3GPP LTE MIMO-OFDMA down-link receiver. An increasing in symbol timing misalignments may occur relative to sychronous network as the result of BS (Base Station) timing differences. Such symbol synchronization errors that exceed the guard interval or the cyclic prefix duration may result in MAI (Multiple Access Interference) for other carriers. In particular, at the cell boundary, this MAI becomes a critical factor, leading to degraded channel throughput and severe asynchronous ICI. Hence, many researchers have investigated the interference mitigation method in the presence of asynchronous ICI and it appears that the knowledge of the SCM (Spatial Covariance Matrix) of the asynchronous ICI plus background noise is an important issue. Generally, it is assumed that the SCM estimated by using training symbols. However, it is difficult to measure the interference statistics for a long time and training symbol is also not appropriate for MIMO-OFDMA system such as LTE. Therefore, a noise reduction method is required to improve the estimation accuracy. Although the conventional time-domain low-pass type weighting method can be effective for noise reduction, it causes significant estimation error due to the spectral leakage in practical OFDM system. Therefore, we propose a time-domain sinc type weighing method which can not only reduce the noise effectively minimizing estimation error caused by the spectral leakage but also implement frequency-domain moving average filter easily. By using computer simulation, we show that the proposed method can provide up to 3dB SIR gain compared with the conventional method.

Estimation of Erositivity Using an Impact Disdrometer in East of Alagoas (충격 입자 분포 탐지기를 이용한 침식도 추정)

  • Tenorio, R.S.;Kwon, Byung Hyuk;Moraes, M.C. da S.;Yoon, Hong-Joo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.15 no.2
    • /
    • pp.371-378
    • /
    • 2020
  • Rainfall is one of the most active forces that cause soil erosion. The action of rain on the soil exerts an erosive power caused by the impact of the drops, which fall with variable speed and kinetic energy, depending directly on the diameter of the drop. The objective of this study is to determine algorithms capable of estimating rainfall erosivity for the region of Maceió-AL. For this purpose, erosion rains were collected between 2003 and 2006 using a RD-69 disdrometer, which continuously and automatically measures rainfall distribution in a range of 1 min. The determination of algorithms in the form of power equation to estimate was adjusted with one and two independent variables (amount of rainfall, duration and maximum intensity).