Essence Applicability Matrices for the Reduction of Project Cycle Time

  • Hong, Tae Hoon;Son, Jae Ho
    • Architectural research
    • /
    • 제8권1호
    • /
    • pp.57-68
    • /
    • 2006
  • Global competition and reduced project life cycle ultimately puts greater performance requirements on the capital project delivery systems used to maintain competitiveness. Despite continuing improvements in delivery cycle time, business owners of facilities continue to demand greater improvements in project delivery cycle time. Therefore, it is very important to investigate the various techniques and methods leading to reduction in project cycle time and also identify the applicability of identified techniques and methods. This paper introduces reduction techniques identified through literature review (i.e, Schedule Reduction Techniques (SRTs), Management Techniques (MTs), and Construction Institute Industry (CII) Best Practices (BPs). In order to collect applicability of these techniques under different project phases (Pre-project planning (PPP), Design (D), Material Management (MM), Construction (C), and Start-up (SU)), the Essence Applicability Matrices (EAM) is used.

State-of-practice and State-of-Art for the Project Cycle Time Reduction

  • Hong, Tae Hoon
    • Architectural research
    • /
    • 제7권2호
    • /
    • pp.69-79
    • /
    • 2005
  • There are no formal decision tools or guidelines to assist owners and contractors in choosing delivery systems and project strategies that would allow for a radical reduction in project cycle time - from the preplanning phase through project start up. Therefore, it is important to identify the state-of-practice and the state-of-art on methods of achieving radical reduction defined as a reduction of 25% or more in overall project cycle time. A comprehensive literature review, three questionnaire surveys, and the seven case studies were conducted and the data obtained from them were analyzed to establish the state-of-practice and state-of-art for project cycle time reduction techniques.

Impact Variables of Dump Truck Cycle Time for Heavy Excavation Construction Projects

  • Song, Siyuan;Marks, Eric;Pradhananga, Nipesh
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권2호
    • /
    • pp.11-18
    • /
    • 2017
  • The cycle time of construction equipment for earthwork operations has a significant impact on project productivity. Elements that directly impact a haul vehicle's cycle time must be identified in order to accurately quantify the haul cycle time and implement strategies to decrease it. The objective of this research is to scientifically identify and quantify variables that have a significant impact on the cycle time of a dump truck used for earthwork. Real-time location data collected by GPS devices deployed in an active earthwork moving construction site was analyzed using statistical regression. External data including environmental components and haul road conditions were also collected periodically throughout the study duration. Several statistical analyses including a variance analysis and regression analysis were completed on the dump truck location data. Collected data was categorized by stage of the dump truck cycle. Results indicate that a dump truck's enter idle time, exit idle time, moving speed and driver visibility can significantly impact the dump truck cycle time. The contribution of this research is the identification and analysis of statistically significant correlations of variables within the cycle time.

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

자동차 부품 제조업체의 조립라인 개선을 위한 6시그마 프로젝트 사례 연구 (A Case Study of a Six Sigma Project for Improving Assembly Line of Auto-Part Manufacturing Company)

  • 정민영;이영남;홍성훈
    • 품질경영학회지
    • /
    • 제38권3호
    • /
    • pp.439-448
    • /
    • 2010
  • Since the six sigma strategy was first introduced to Motorola in 1987, it has been taken as an important business strategy to strengthen the competitiveness of leading companies in the global competitiveness environm ent. This paper presents a six sigma project to reduce the cycle time of assembly line in a medium size automotive part company. The project follows a structured methodology of DMAIC cycle which consists of Define, Measure, Analyze, Improve, and Control. A CTQ is determined based on COPQ analysis, and a process map is utilized for identifying process input variables. As a result of the project, two assembly lines are converted to cell line production lines. The cycle times become 55 sec./unit and 64 sec./unit from 64 sec./unit and 83 sec./unit at the beginning of the project, respectively.

QUANTITATIVE ANALYSIS FOR THE RISK MANAGEMENT OF A SUPER-HIGHRISE RESIDENCE

  • Shuzo Furusaka;Takashi Kaneta;Makoto Ohsaki;Kazunori Harada;Yasuhiro Orita;Sohsuke Arai;And Norikazu Katoh
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.748-753
    • /
    • 2005
  • In a super-highrise residence project, a project manager needs to form the long-term risk management plan which covers the problems from the beginning of project to the time of demolition. The cause and responsibility for a risk are clarified and quantitatively evaluated through the life cycle of a project. Development of the system which supports a risk strategy effectively is needed as a project becomes complex. In this paper, through the life cycle of a specific super-highrise residence project, a risk phenomenon is specified from a viewpoint of each participant, and the mathematical model is formulated choosing the combination of the optimal strategy against a risk quantitatively within a fixed risk strategy budget.

  • PDF

댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구 (The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis)

  • 윤재호;문영일
    • 한국수자원학회논문집
    • /
    • 제36권5호
    • /
    • pp.715-724
    • /
    • 2003
  • 이 연구의 목적은 사회간접자본의 대표적인 시설인 댐과 같이 기획, 조사, 타당성분석 단계에서부터 설계, 계약, 시공 및 유지관리단계까지 건설 생애주기가 긴 경우 Risk에 노출되는 시간 또한 길어져 건설기간 지연에 따른 비용증가는 물론 적기 미 준공시의 증액비용과 이용연기에 따른 편익손실로 국가 전체의 경쟁력을 저하시킴으로 이들 문제점을 감소시키는 방법을 모색하는 것이다. 이에 본 연구에서는 생애주기 각 단계별로 경제성분석을 통한 공기와 비용을 연계 분석하여 효율적이고 체계적인 사업수행단계 및 건설공정 Network모델을 도출하고 이 성과를 토대로 생애주기분석에 있어 Fast Track기법을 적용하는 하나의 새로운 방안으로 제안하고자 한다.

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

A Case Study of ERP Implementation for PCB Manufacturer

  • Lo, Chan-Hsing;Lin, Yu-Hsin;Tsai, Chih-Hung;Li, Rong-Kwei
    • International Journal of Quality Innovation
    • /
    • 제4권1호
    • /
    • pp.160-174
    • /
    • 2003
  • This study researched an enterprise resources planning (ERP) implementation project at a printed circuit board (PCB) manufacturer. In depth research was achieved by participating and observing in an implementation project at an actual PCB manufacturer. It is hoped that this study will contribute a valuable reference resource for future PCB manufacturers that wish to select or implement ERP systems. The first step in implementing ERP software is to set a clear target. At the same time, the tasks of each department and the system of cooperation between departments must be clearly defined. In this way, the cycle time of each flow and the accuracy of data will both be improved. In order to ensure smooth implementation of an ERP project, the followings are key factors: (1) an ERP system that suits the PCB industry; (2) effective project management; (3) effective project cost/budget control; (4) project problem management system; (5) comprehensive implementation method and information technology (IT), etc. By keeping to these principals, Company A achieved rapid transactions, and lower total cycle times and inventory levels, and other such benefits that had been predicted.

프로젝트 환경과 특성에 따른 소프트웨어 개발 경로 선정 알고리즘 (Algorithm selecting Software development route suitable for Project environment and characteristics)

  • 정병권;윤석민
    • 정보처리학회논문지D
    • /
    • 제13D권1호
    • /
    • pp.87-96
    • /
    • 2006
  • 본 논문은 프로젝트 환경과 특성을 고려하여, 소프트웨어 개발 경로를 커스터마이징 하는 방법을 설계한 것이다. 개발 경로 선정 기준은 ISO/IEC TR 15721 Information Technology Guide for ISO/IEC 12207(Software Life Cycle Processes), ISO/IEC 15504 Information technology - Process assessment의 프로세스 내용에 기반 한 10개의 영역 특성이다. 10개의 영역 특성은 프로젝트 환경과 특성을 반영한 것이며, 프로젝트 개발 경로 선정 항목들을 정의한다. 프로젝트 환경과 특성 항목인 10개 영역 특성 항목을 이용하여 소프트웨어 개발 프로세스를 선정하는 알고리즘을 제시한다. 본 논문에서 제안한 소프트웨어 개발 경로를 커스터마이징 하는 방법을 평가하기 위하여 소프트웨어 개발 경로를 커스터마이징 하는 방법을 반영한 개발 경로 선정 시스템을 가지고 웹 기반 시스템 개발 프로젝트를 적용한다. 그러나 입증된 수작업 프로젝트 경로 프로세스와 시스템에서 출력된 프로젝트 경로 프로세스가 차이가 난다 차이가 나는 주원인은 산출물이 서로 합쳐졌거나, 명칭이 바뀌었기 때문이다. 효과로는 소프트웨어 개발 프로젝트 환경과 특성에 적합한 경로 프로세스를 용이하게 선정한다.