• Title/Summary/Keyword: Project Completeness

검색결과 25건 처리시간 0.024초

BIM Application Process for Facility Condition Assessment Documentation Work

  • Yoo, Seung Eun;Yu, Jung Ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.268-270
    • /
    • 2015
  • Overseas countries' government and facility management industries make efforts to ensure precise and fluent data from building information modeling (BIM). In facility management, a large amount of data and information are necessary to continue the process activities. Facility condition assessment, which is performed to make budget plan for the maintenance and operation requires the related facilities' documentation and information. However, it depends on the owner and the user of the facility to provide accurate and complete information to consultant. The problems as follows: (1) owner and user should provide documents and information, and (2) the consultant cannot verify the provided information. To solve these problems, we suggest a methodology to produce the information for FCA through BIM. First, all of the essential documentation and assessment elements are listed. Next, the documents and elements are separated out, whether they are able to be extracted from BIM or not. Then, the list indicates only the data that is linked with BIM. The suggestion is expected to provide the required information through the connection to BIM with accuracy and completeness and to present another BIM application use for facility management.

  • PDF

Prescription Errors with Chemotherapy: Quality Improvement through Standardized Order Templates

  • Saad, Aline;Der-Nigoghossian, Caroline A.;Njeim, Rachel;Sakr, Riwa;Salameh, Pascale;Massoud, Marcel
    • Asian Pacific Journal of Cancer Prevention
    • /
    • 제17권4호
    • /
    • pp.2329-2336
    • /
    • 2016
  • Background: Despite the existence of established guidelines advocating the use and value of chemotherapy order templates, chemotherapy orders are still handwritten in many hospitals in Lebanon. This manuscript describes the implementation of standardized chemotherapy order templates (COT) in a Lebanese tertiary teaching hospital through multiple steps. Initial Assessment: An initial assessment was conducted through a retrospective appraisal of completeness of handwritten chemotherapy orders for 100 adult patients to serve as a baseline for the project and identify parameters that might afford improvement. Choice of solution: Development of over 300 standardized pre-printed COTs based on the National Comprehensive Cancer Network templates and adapted to the practice culture and patient population. Implementation: The COTs were implemented, using Kotter's 8-step model for leading change, by engaging health care providers, and identifying and removing barriers. Evaluation: Assessment of physicians' compliance with the new practice (122 orders assessed) was completed through two phases and allowed for the identification of areas of improvement. Lessons Learned: Overall, COT implementation showed an average improvement in order completion from 49.5% (handwritten orders) to 77.6% (phase 1-COT) to 87.6% (phase 2-COT) reflecting an increase of 38.1% between baseline and phase 2 and demonstrating that chemotherapy orders completeness was improved by pre-printed COT. As many of the hospitals in Lebanon are moving towards standardized COTs and computerized physician order entry (CPOE) in the next few years, this study provides a prototype for the successful implementation of COT and demonstrates their role in promoting quality improvement of cancer care.

LXC 환경을 이용한 한국형 합동 전술데이터링크체계의 소프트웨어 모의시험에 관한 연구 (A Study on the Software Simulation Test of the Joint Tactical Data Link System Using the Linux Container Environment)

  • 함형석;구영훈;송대영
    • 한국전자통신학회논문지
    • /
    • 제18권6호
    • /
    • pp.1125-1132
    • /
    • 2023
  • 전장 환경에서 점차 네트워크의 중요성이 확대되고 있다. 시간이 지날수록 한국형 합동 전술데이터링크 체계에서 사용하는 전술데이터링크의 종류가 많아지고 있으며 그만큼 전술데이터링크 시스템을 탑재한 군의 무기체계가 증가하고 있다. 광범위해지는 전장에 안정적인 소프트웨어를 제공하기 위해 철저한 품질 검증이 요구된다. 본 연구는 한국형 합동 전술데이터링크 체계사업의 안정성 검증을 위해 리눅스 컨테이너 환경을 이용하여 최소한의 물리적 공간과 하드웨어 자원으로 다양한 모의시험을 수행하는 방안에 대해 살펴본다. 이를 통해 유사한 성격의 리눅스 기반 체계사업에서도 한정된 시험환경에서 최대한의 시험 역량을 확보하여 보다 높은 안정성과 신뢰성을 확보하는데 기여하고자 한다.

설계 프로세스를 반영한 BIM 작성 기준(LOD)에 대한 연구 (A Study of LOD(Level of Detail) for BIM Model applied the Design Process)

  • 조현정;김연수;마영균
    • 한국BIM학회 논문집
    • /
    • 제3권1호
    • /
    • pp.1-10
    • /
    • 2013
  • BIM(Building Information Modeling) ordering manuals and guidelines are diffused with the recent BIM activation. However, it is causing drawbacks such as an increase of work at each design stage and a decline of BIM application level that the standard of making up and managing BIM is vague and it includes comprehensive meaning. Therefore, this study aims to secure BIM work standard by establishing BIM making-out standard based on LOD(Level of Detail) classification considering domestic design process. It compared each definition of LOD by analyzing domestic and foreign BIM guideline examples, and figured out insufficiency of existing domestic and foreign design process and BIM guidelines. Moreover, it drew architects' work articles for promoting the progression of the efficient design process, and analyzed BIM requirements on design process, dividing BIM application scale by field. Through this analyzing process, it finally established BIM making-out standard classified by design process. The effects of establishing BIM making-out standard would include improving a division of labor and cooperation environment by creating integrated BIM model on design stages, advancing work efficiency by preventing a repetition and an increase of work, and upgrading project completeness and design quality. Besides, it can secure BIM work standard by clarifying responsibility for working steps. BIM making-out standard established by this study will contribute to developing the future BIM work standard document and BIM guideline as a data base.

Evaluation of selection program by assessing the genetic diversity and inbreeding effects on Nellore sheep growth through pedigree analysis

  • Illa, Satish Kumar;Gollamoori, Gangaraju;Nath, Sapna
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제33권9호
    • /
    • pp.1369-1377
    • /
    • 2020
  • Objective: The main objectives of the present study were to assess the genetic diversity, population structure and to appraise the efficiency of ongoing selective breeding program in the closed nucleus herd of Nellore sheep through pedigree analysis. Methods: Information utilized in the study was collected from the pedigree records of Livestock Research Station, Palamaner during the period from 1989 to 2016. Genealogical parameters like generation interval, pedigree completeness, inbreeding level, average relatedness among the animals and genetic conservation index were estimated based on gene origin probabilities. Lambs born during 2012 and 2016 were considered as reference population. Two animal models either with the use of Fi or ΔFi as linear co-variables were evaluated to know the effects of inbreeding on the growth traits of Nellore sheep. Results: Average generation interval and realized effective population size for the reference cohort were estimated as 3.38±0.10 and 91.56±1.58, respectively and the average inbreeding coefficient for reference population was 3.32%. Similarly, the effective number of founders, ancestors and founder genome equivalent of the reference population were observed as 47, 37, and 22.48, respectively. Fifty per cent of the genetic variability was explained by 14 influential ancestors in the reference cohort. The ratio fe/fa obtained in the study was 1.21, which is an indicator of bottlenecks in the population. The number of equivalent generations obtained in the study was 4.23 and this estimate suggested the fair depth of the pedigree. Conclusion: Study suggested that the population had decent levels of genetic diversity and a non-significant influence of inbreeding coefficient on growth traits of Nellore lambs. However, small portion of genetic diversity was lost due to a disproportionate contribution of founders and bottlenecks. Hence, breeding strategies which improve the genetic gain, widens the selection process and with optimum levels of inbreeding are recommended for the herd.

Improving Reuse of Test Strategy based on ISO/IEC Standards

  • 민경식;이정원;이병정
    • 인터넷정보학회논문지
    • /
    • 제20권6호
    • /
    • pp.37-46
    • /
    • 2019
  • A test plan is a high level document detailing objectives, processes, schedules and so on for verifying a developed software. And a test strategy, a component of a test plan, is about how to test software products to guarantee its quality and find bugs in the software in advance. Therefore, establishing effective and suitable test strategies is important for elaborating test processes. However, these tasks are difficult for project managers who write a test plan if they were not trained well in software test processes. And mis-designed test strategies will also mislead entire testing behaviors that testers would do. As a result, there would be a low quality software product in the end. To solve this problem, we propose a new test strategy reuse technique in this paper. By utilizing test plans of already completed software development projects, we lead test planer to reuse suitable and effective test strategies which were used in previous projects. To do so, we evaluate existing test strategies by utilizing ISO/IEC 25010 quality model for evaluating the suitability of test strategies and also use effectiveness metrics for test strategies. And from these evaluations, we predict completeness of new test plan that is written by reused test strategies. It can help the project manager to write an appropriate test plan for the quality characteristics which are selected as objectives for testing and software product. We show the possibility of our approach by implementing a prototype into the existing framework in a case study.

아키텍처기반 설계 방식에 대한 평가기능이 통합된 소프트웨어 설계 방법론 (A Software Design Methodology Integrating Evaluation Method of Architectural Design Approaches)

  • 고현희;궁상환;박재년
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제34권7호
    • /
    • pp.625-634
    • /
    • 2007
  • 소프트웨어가 대형화되고 복잡해짐에 따라 소프트웨어 아키텍처의 설계가 성공적인 프로젝트를 위한 중요한 이슈가 되었다. 아키텍처 설계의 기반이 되는 아키텍처 접근법 선정은 아키텍처 설계와 후속설계 작업의 성공을 위해 무엇보다 중요하다. 본 연구에서는 아키텍처 접근법 대안들을 설계단계에서 식별하고 시스템의 품질 속성을 만족시키는 아키텍처 접근법을 선정하기 위한 평가 방법과 평가 방법을 통합한 설계 방법을 제안함으로써 설계 산출물의 신뢰도를 높이고 재설계에 따른 비용의 절감 및 검증된 아키텍처 접근법을 기반으로 아키텍처 설계를 완성함으로써 후속 설계 작업의 성공을 높이고자 한다.

지식 기반 플랜트 건설 공정 계획 시스템의 개발 (A Knowledge-based Approach to Plant Construction Process Planning)

  • 김우주
    • 지능정보연구
    • /
    • 제7권1호
    • /
    • pp.81-95
    • /
    • 2001
  • 플랜트 건설 프로젝트는 다른 분야의 프로젝트에 비하여 상대적으로 높은 불확실성과 위험을 수반하게 되며, 이는 정확한 플랜트 건설 프로젝트의 관리가 프로젝트의 성공에 있어 매우 중요해진다는 것을 의미한다. 특히 프로젝트 관련 초기 단계에서 이루어지는 공정 계획과 일정 계획 작업의 성패가 곧 전체 플랜트 건설 프로젝트 수행의 성패를 결정하는 주요한 요인으로 인식되고 있다. 그럼에도 불구하고 대부분의 플랜트 건설 사업은 그 특유의 비구조성과 환경의 역동성으로 인해 적시에 정확하고 체계적인 공정 및 일정 계획 수립을 수행하고 있지 못한 실정이다. 따라서 본 연구에서는 이와 같은 문제점을 해결하기 위하여 첫째, 플랜트 건설에 필요한 공정 지식을 모듈화하고, 둘째, 플랜트 건설 문제의 체계적 표현 방법을 마련하였으며, 셋째, 문제에 따라 필요한 공정들을 구성하고 계획을 수립하는 전문가의 지식에 대한 표현 기법과 이의 추론 방법론을 개발하였다. 또한 이렇게 수립된 공정 계획을 바탕으로 프로젝트 초기 단계에서의 일정 계획을 수립하는 휴리스틱 기반 일정 계획 방법론을 제안함으로써 보다 빠르게 공정 계획의 수행 가능성과 경제성을 여러 가지 측면에서 고려해 볼 수 있게 된다. 이와 같은 자동화된 프로젝트 초기 단계의 공정 계획 수립은 계획 수립 소요를 극적으로 단축시키며 따라서 불확실한 상황이나 여건에 대한 고려를 체계적으로 그리고 충분히 수행할 수 있게 함으로써 보다 수립된 공정 계획의 완전성과 정확성을 높이게 될 수 있다. 본 연구에서는 또한 이상의 접근 방법을 시스템으로 구현하였으며, 구현된 플랜트 건설 공정 계획과 일정 계획 수립 시스템은 국내 최대 건설회사의 열병합 발전소와 하수처리장 건설을 위한 실제 프로젝트 관리 업무에 적용하여 그 성과를 경험적으로 중명하였다. 특히 이와 같은 실제 적용 사례는 본 방법론이 다른 플랜트 건설 분야에서도 쉽게 적용되어 프로젝트 관리 업무의 질적 향상과 생산성의 제고에 기여할 수 있음을 시사하고 있다.

  • PDF

델파이기법을 이용한 감리점검항목 도출 방안 - 하이퍼레저 패브릭 기반으로 (An Audit Method on Information System Audit using Delphi Method - Based on Hyperledger Fabric)

  • 이영주;박수용
    • 소프트웨어공학소사이어티 논문지
    • /
    • 제29권2호
    • /
    • pp.7-12
    • /
    • 2020
  • 국내 공공기관에서 사업비가 5억원 이상인정보시스템 구축사업은 정보시스템 감리대상이고 정보시스템 감리원은 감리기준에 따라 감리를 실시하여야 한다. 최근 금융산업을 넘어 제조, 헬스케어, 유통, 공공 부문 등 다양한 분야에 블록체인 기술이 적용되면서 블록체인 기술을 적용한 시스템 개발이 늘고 있다. 공공기관과 기업에서는 블록체인 기술을 적용하기 위해 프라이빗 블록체인인 하이퍼레저 패브릭을 사용이 증가 추세에 있다. 그러나, 새롭게 부상하고 있는 블록체인기반 시스템을 기존의 감리점검항목으로 감리를 수행하기에는 충분하지 않아 각 감리원들이 검증되지 않은 점검항목을 개별적으로 만들어 사용하고 있다. 따라서 블록체인을 적용한 시스템을 감리할때 검증된 감리점검 항목이 필요하다. 본 연구에서는 델파이 프로세스를 커스터마이징하여 블록체인 기술을 활용한 시스템 개발사업에 적합한 점검항목을 도출하고, 정보시스템 감리원의 설문조사를 통해 도출된 점검항목의 적정성을 검증받았다. 이번 연구는 정보시스템 감리원의 감리 수행에 직접적인 도움이 될 것이며, 블록체인 기반 시스템을 통해 서비스를 제공하는 사업자와 주관사도 시스템의 품질 향상에 기여할 것으로 기대된다.

BIM 모델의 완성도를 높이기 위한 품질검토항목의 룰 개발 - 국내 BIM 지침을 중심으로 - (Development of Rule for Quality Checking Items to Raise Quality of BIM Model -Focusing on the Domestic BIM Guidelines-)

  • 송종관;주기범
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.131-143
    • /
    • 2013
  • BIM 지침을 통해 기본적인 모델링 기준을 제공하고 있지만, BIM 모델링 업무를 수행하는 참여자 별로 기준이 상이하고 BIM 모델의 활용목적에 따른 적용기준이 다르기 때문에 BIM 적용 지침에 대한 이행여부의 평가는 BIM 모델의 활용목적에 따른 품질을 만족시키기 위한 중요한 절차이다. 하지만 지침에 따라 작성된 BIM 모델의 검토항목 및 방법이 제시되지 않고 있다. 본 연구는 BIM 모델의 완성도를 높이기 위해 국내 BIM 지침의 BIM 기반 품질검토 항목을 도출하고 자동 품질검토 수행을 위한 룰 정의서를 제시한다. 먼저 국내 BIM 지침을 분석하여 품질검토 항목을 도출하고 플로우차트 및 의사코드를 활용한 구조화를 통해 룰 정의서를 작성한다. 작성된 룰 정의서를 기반으로 사례적용을 실시하여 자동 품질검토 과정을 수행한다. 본 연구는 3차원의 방대한 데이터를 포함한 BIM 모델의 설계품질과 완성도를 높이는데 기여할 것이다. 향후 활용목적에 따른 BIM 지침의 개발이 필수적으로 이루어져야 하며 BIM모델의 품질검토를 위한 구체적인 절차나 기준이 제공되어야 할 것이다.