• Title/Summary/Keyword: Progress Management Unit

Search Result 60, Processing Time 0.022 seconds

ON CODING AND UNIT-TEST PROCESS MANAGEMENT FOR SOFTWARE DEVELOPMENT OF LARGE-SCALE

  • Kino Yasunobu
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.233-238
    • /
    • 1998
  • To manage a phase of coding and unit-test, project managers have used to pay attention to a number of completed programs. And the manager makes a graph of progress. Usually, this graph of progress has S shape and doesn't linearly depend on the workload. So the degree of progress seems to be behind. In actual, many projects tend to be behind the schedule. Because of this reason, it is difficult to judge whether the project is behind or not in the early stage. In this paper, We propose the 'four-division model' to solve this difficulty.

  • PDF

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type (공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 -)

  • Lee, Ki-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2011
  • In this Study, the Cost of Public Facility Construction in the VE Cost Model, and the Progress of the Construction Site Management, and Cost due to the Lack of Cpatial Information in Dispute Cost Work Type Recognize the limits of Historical Information, and to Overcome the Perception of Cost and Space Systems Unit In the Process of Transition that Began Seeking Ways to Improve Through this Study, Different Parts of the Proposed Area of Construction Work Unit System, the Core of Calculating Hourly and Detailed Engineering Information and Cost Information Generated Extension to Configure the Construction Unit in Every Space, Every Work Unit System, All Materials That Make Up Work Unit System, Unit Labor Costs, And All of the Configuration Items Enables Precise And Multidimensional Understanding is That.

A study activating devices in scheduling management for analyzing progress payment in Korea (기성지급방식 비교분석을 통한 국내 공정관리 활성화 방안에 관한 연구 -경부고속철도 공사와 대만 고속철도공사 비교 중심으로-)

  • 이태식;김영현;정현진;김영환;김대영;윤철수;노시현
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.66-71
    • /
    • 2001
  • Most payments in domestic construction are issued in lumpsum unit price contracts according to the completed construction rate. This method generates problems in losing time and increased costs for the owner and contactor. In overseas projects, payments are issued in accordance to completed milestones. The milestones themselves base on the original schedule and allow effective schedule management on the tasks. In domestic construction, however, introduction of milestone payments requires enhanced management capability of owners and contractors. Hence, this study investigating how to activate schedule management devices to analyze progress payments in domestic construction.

  • PDF

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.

A Study on the Quality Improvement Activities of Clinical Nurses: Nursing Care Unit level (임상간호사의 의료 질 향상 활동에 관한 연구: 병원 간호병동 수준으로)

  • Yoo, Ji-Yeon;Kim, Kwang-Jum
    • Korea Journal of Hospital Management
    • /
    • v.22 no.1
    • /
    • pp.10-20
    • /
    • 2017
  • Purposes: This study analyzed activities for improvement of quality of care in nursing units to identify group-level success factors of quality improving efforts. Methodology/Approach: Research subjects were 31 general wards of C university hospital, which has 1,200 beds. Data were collected through survey and focus group interview. The mean value of nurses in a ward was converted to unit-level variable value of the ward. The SPSS 24.0 version was used to analyse the data. The units were classified into two groups, high performing and low performing, by the subjective level of quality improvement performance. Findings: The main findings are as follows: 1. The high performing groups participated more in education related to quality improvement and showed more quality improvement cases in progress than that of their counterpart. 2. The high performing group's nurses show more positive perception and attitude on quality improvement activities, and they have positive assessment on the necessity, effect, satisfaction about the quality improvement activities. 3. Middle managers' ability, attitude, motivation, and effective communication across members of the ward played pivotal roles in boosting the quality improvement activities of wards.

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF