• Title/Summary/Keyword: Profit and Loss Work

Search Result 24, Processing Time 0.022 seconds

The Profit Analysis of Straddle Sell by Entry-Time and Delta at System Trading (시스템 트레이딩에서 진입시점과 델타에 따른 스트래들 매도의 성능 분석)

  • Ko, Young Hoon;Kim, Yoon Sang
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.1
    • /
    • pp.151-157
    • /
    • 2010
  • This paper proposes the Pyramid strategy which is based on the straddle sell. The Pyamid strategy has multi-entry features with starting date and delta parameters. And It is hedged against a loss by mutual trades and dynamic ripples. This paper analyzes the profit and MDD(maximum draw down) of the Pyramid strategy on system trading. The portfolio tool is used for the experiment which is one of the Multicharts' package. The Multicharts is a good trading system of recent years. For the experiment, three call options and three put options are used at october in 2009. Two parameters are used which are the starting date from first October to twentieth October in 2009 and delta from eight percent to fifty percent. As a result, the profit of composite option is about 3 million won. If the strategy starts before the beginning of option month, investors feel uncomfortable because of a large MDD. If a delta belows 20%, it shows high profit and the ratio of profit and MDD builds up a low value. However a low delta makes frequent trades and results in a loss unless increasing entry levels which mean more amount of investment. This work provides a safer trade system than native option trades. It is important how much levels of multi-entry are acceptable. And an amount of investment with appropriate levels of multi-entry is a subject of a future study.

A Potential Value of Noise Control in Construction Sites for Real Estate Developers

  • Zheng, Guo;Kim, Youngchul
    • KIEAE Journal
    • /
    • v.14 no.4
    • /
    • pp.5-10
    • /
    • 2014
  • Since construction work is an indispensable part of daily lives, complaints of noise are unavoidable. Noise control in construction sites is normally known as a regulation by a government and self-motivated noise controls rarely occur. In this paper, a marketing strategy is proposed to provide a potential value of noise control for real estate developer. First, people's perception to construction noise was examined in means of collecting and analyzing media reports between 2005 to 2011. Then decibel test was done in order to test noise generated by different devices in a construction site in various distances. According to the theory of core competency, a conceptual model was raised to illustrate profit and loss situation of the real estate developers in the case they invest more in noise control. The construction noise is discussed that it will ruin people's perception to the company's brand image and reputation. Also, the investment in the creation of silent site is discussed that it will not only bring benefit to the brand image work but also have value of profit in the market.

A New Design Analysis of Flywheel (플라이휠의 새로운 설계 해석)

  • 김재호;신영재
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.15 no.3
    • /
    • pp.1063-1066
    • /
    • 1991
  • 본 연구에서는 기계 기구의 각속도 변동을 줄이는데 사용되는 플라이휠을 운동에너지의 법칙을 이용하여 해석하고, 주어진 허용 각속도 변동률을 정확히 만족하 는 플라이휠의 크기를 결정하는 새로운 방법을 제시하였다. 또한 수치 해석을 통하 여 본 해석방법에 의해 설계된 플라이휠과 종래 방법에 의한 플라이휠의 성능을 비교 하였다.

A Case Study on Productivity Analysis and Methods Improvement for Masonry Work

  • Chang, Chul-Ki;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.372-381
    • /
    • 2013
  • In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.

A Development of Staff Mobility in the System of Strategic Human Resource Management

  • Aigul, Otarbayeva;Samal, Tazhiyeva
    • Asian Journal of Business Environment
    • /
    • v.5 no.2
    • /
    • pp.31-36
    • /
    • 2015
  • Purpose - This work aims to study the existing management process and methods of statistical evaluation of personnel mobility management, and propose improvement measures. This is particularly relevant in today's market economy because proper organization of personnel movement affects the availability and effective utilization of human resources in enterprises. Hence, it influences the volume, timely execution of work, equipment efficiency, and consequently the volume of production, its cost, profit, and other economic indicators. Research design, data, and methodology - We investigate the indicators that measure staff mobility, and their dependent consequences. Further, it analyses the factors influencing high staff turnover, which is a main indicator of staff mobility. Results - Measures for staff mobility development and prevention of turnover are proposed. Micom Systems is a sample case that has developed special programs to reduce staff turnover. Conclusions - Staff mobility leads to additional costs, significant loss of working time, and increase in defects. However, the advantages of staff mobility outweigh these negative factors. The role of staff mobility in a market economy cannot be overestimated.

Cost Estimating of Electricity and Steam on a Gas-Turbine Cogeneration (가스터빈 열병합발전에서 생산된 전기와 증기의 원가산정)

  • Kim, Deok-Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.4
    • /
    • pp.252-259
    • /
    • 2009
  • When various kinds of outputs are produced from a single energy system, the methodology which allocates the common cost to each output cost is very important because it is directly related with the profit and loss of producers and purchasers. In the cost allocation methodology of the heat and the electricity on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, various exergetic methods, and so on. On the other hand, we have proposed a worth evaluation method which can be applied to any system. The definition of this methodology is that the unit cost of a product is proportion to the worth. Where, worth is a certain evaluating basis that can equalize the worth of products. In this study, we applied this methodology to a gas-turbine cogeneration which produces 119.2 GJ/h of electricity and 134.7 GJ/h of steam, and then we allocated 3,150 $/h of fuel cost to electricity cost and steam cost. Also, we compared with various cost allocation methods. As the result, we conclude that reversible work of various kinds of worth basis evaluates the worth of heat and electricity most reasonably.

Applications of Mathematical Optimization Method for Chemical Industries (화학 산업에서 수학적 최적화 기법을 적용한 사례)

  • Kim, Eun-Yong;Heo, Soon-Ki;Lee, Kyu-Hwang;Lee, Hokyung
    • Korean Chemical Engineering Research
    • /
    • v.58 no.2
    • /
    • pp.209-223
    • /
    • 2020
  • Executions of SCM in a chemical company of which divisions produce petrochemicals, compounds, batteries, IT material and medicine directly affect their own profit. Execution level of SCM or optimization is very important. This work presents activities of SCM and optimization of inefficient issues in several industrial divisions using mathematical optimization method. The meaning is not only academic research but also making a useful tool which active partner deals with in his work. It is explained how to do beforehand and afterward optimization problem. The benefits are mentioned in the sections. The first of examples would be cover supply plan optimization, optimal profit business plan, and scheduling of a stretching process of polarizer based on minimizing raw material loss in polarizer production. The second example would be cover the optimization of production/packaging plans to maximize productivity of Poly Olefin processes, and the third example is minimization of transition loss in the production of battery electrodes. The fourth example would be cover scheduling of vessel approaching to berth. Because transportation of large portion of raw material and products of petrochemical industry is dealt with vessel, scheduling of vessel approaching to berth is important at the shore of large difference of tide. The final example would be scheduling problem to minimization of change over time of ABS semi products.

ANALYZING EFFECTIVE FACTOR OF THE CHANGE MANAGEMENT BASED ON URBAN REGENERATION PROJECT IN REPUBLIC OF KOREA

  • Jae-Pil Seo;Yoon-Ki Choi;Bo-Sik Son;Han-Guk Ryu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.591-596
    • /
    • 2011
  • There are quite a number of business processes in the urban regeneration project. Managers and participants who involved in the project make and use information for the best way to perform in the particular business process. The information can be also reused and produced for data at the next stage. Accordingly, the information sometimes goes out of existence and work data up into new information when the urban regeneration project has been accomplished. But in that case some of changes happen occasionally, the business for urban regeneration has suffered a loss of profit and time as result of confusions about decisions and inappropriate action. For that reason, the information should be analyzed to achieve its aim at the business process under the influence of changes. Then, even though detail processes and management method change, the Core Information, which are important factors for accomplishing the project, help that the project can be operated to solve the problem about confusion and loss of the business. In conclusion, the Core Information is main effective factors for successful urban regeneration projects on the change management. The purpose of this study is to research the information according to the Information-flow and changes, and to find out the influence factors and the Core Information to manage efficiently at the process of urban regeneration projects.

  • PDF

Cost Estimating of Heat and Electricity on a Gas-Turbine Cogeneration (가스터빈 열병합발전에서 생산된 열과 전기의 원가산정)

  • Kim, Deok-Jin
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.351-356
    • /
    • 2008
  • When various kinds of outputs are produced from a single energy system, the methodology which allocates the common cost to each output cost is very important because it is directly related with the profit and loss of producers and purchasers. In the cost allocation methodology of the heat and the electricity on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, various exergetic methods, and so on. On the other hand, we have proposed a worth evaluation method which can be applied to any system. The definition of this methodology is that the unit cost of a product is proportion to the worth. Where, worth is a certain evaluating basis that can equalize the worth of products. In this study, we applied this methodology to a gas-turbine cogeneration which produces 119.2 GJ/h of electricity and 134.7 GJ/h of heat, and then we allocated 3,150 $/h of fuel cost to electricity cost and heat cost. Also, we compared with various cost allocation methods. As the result, we conclude that exergy of various kinds of worth basis evaluates the worth of heat and electricity most reasonably on this system.

  • PDF

A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction (임시 활주로 건설공사의 위험영향 및 손실비용 사례분석)

  • Kang, Hyunwook;Lee, Wonbae;Kim, Minjung;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.32-39
    • /
    • 2020
  • The purpose of this study is to derive the risk factors that occurred during the construction of the temporary aircraft runway and to analyse the risk costs and loss costs. For this purpose, actual construction data made during the construction of the aircraft runway were investigated. And the risk factors that occurred during the construction work were derived. So the increased construction costs and loss costs due to risk factors were analyzed. The results of this study are as follows: 1)The number of risk factors that occurred during the construction of the aircraft runway was derived from eight. 2)It was calculated that the total risk cost of 5.2million won, the risk cost of the owner's should be 243 million won and the cost of the contractor should be 277million won. 3)Owner's was up 2.36% from its planned budget and the contractor lost -277million won out of its planned profit of 443million won, resulting in a residual profit of 165million won. The results of the study are used as a reference for estimating risk factors and contingency that should be considered in aircraft runway construction.