• Title/Summary/Keyword: Productivity management

Search Result 2,601, Processing Time 0.033 seconds

IT SME Ventures' External Information Network Diversity and Productivity Improvement : The Mediating Role of the Production Period Reduction (IT 중소벤처기업의 외부 정보 네트워크의 다양성과 생산성 향상 : 생산 기간 단축의 매개적 역할)

  • Hau, Yong Sauk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.144-149
    • /
    • 2017
  • This study empirically analyzes the effect of IT SME ventures' external information network diversity on their production period reduction and productivity improvement generated from technology development. This research constructs a mediating model based on the open innovation perspective and tests it with the 138 samples of South Korean IT SME ventures based on the ordinary least squares regression. This research is expected to make a good contribution by shedding a new light on the following three points about the critical role of IT SME ventures' external information network diversity in increasing their production period reduction and productivity improvement generated from technology development which has scarcely been illuminated in the extant studies in the field of the management of technology for SMEs. First, IT SME ventures' external information network diversity positively influences their production period reduction. Second, the external information network diversity positively influences IT SMEs' ventures' productivity improvement. Third, IT SME ventures' production period reduction partially mediates the influence of IT SME ventures' external network diversity on their productivity improvement. These three fresh points are expected to provide useful theoretical and practical implications. Related to the theoretical implication, this research provides a fresh implication that IT SME ventures' external information network diversity positively influences not only their production period reduction but also productivity improvement generated from technology development. Concerning the practical implication, this study suggests that the CEOs in IT SME ventures make strategic efforts to use more diverse external information sources in order to increase their production period reduction and productivity improvement generated from technology development.

The Estimation of Productivity Considering New Technology Port- Equipment By Using Simulation (시뮬레이션을 활용한 신기술 항만장비의 생산성 추정)

  • Kim, Dong-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.1
    • /
    • pp.237-246
    • /
    • 2015
  • In this paper, Improved productivity models of container terminal are provided by utilizing a simulation considering Tandem-lift Quay Crane and transport vehicle of container's high productivity 'Alternative ship-to-yard vehicles.' Feature of this method is deriving the data of tandem-lift Quay Crane and Alternative ship-to-yard vehicles, estimating the productivity model of tandem-lift Quay Crane by using regression analysis. Tandem-lift Quay Crane is equipment of loading and unloading to increase productivity approximately by 2 time existing (single, twin) Quay Crane by dealing with four 20ft containers or two 40ft containers at the same. Alternative ship-to-yard vehicles can transfer containers(4TEU) more than existing Yard Tractor. This paper is deriving the optimal combination showing the highest productivity by using simulation considering Tandem-lift Quay Crane and Alternative ship-to-yard vehicles on container terminals and developing estimating model of productivity by using regression analysis using data of simulation.

Studies on the Grass Productivity and Nutritive value as Affected by Cutting Management in Spring IV. Effects of the first harvesting times and regrowth periods on dry matter productivity, leaf : stem ratio and nutritive value of grasses. (혼파초지에서 봄철 예취방법에 따른 목초의 생산성과 사료가치 비교연구 IV. 1차 이용시기와 재생기간이 목초의 건물생산성 , 경엽분포비율 및 사료가치에 미치는 영향 ( Studies on the Grass Productivity and Nutritive value as Affected by Cutting Management in Sprin)

  • Lee, Joung-Kyong;Seo, Sung;Han, Young-Choon;Lee, Jong-Yeol
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.10 no.1
    • /
    • pp.15-20
    • /
    • 1990
  • This experiment was carried out to investigate the effects of the fist harvesting times (vegetative, stem elongation and heading stage) and regrowth periods (20, 30 and 40 days) after the first harvest on dry matter (DM) productivity, crude protein (CP), CP yield and cell wall constituents of gasses during 1987 and 1988. Although the dry matter productivity of grasses at the first was decreased with earlier cutting, the regrowth DM productivity after the first harvest was increased significantly with earlier cutting (p < 0.05). Also the 30 days of regrowth periods was contributed greatly to the DM productivity p <0.05). The percentage of leaf in the leaf: stem ratio was increased with earlier initial harvest and shorter regrowth period after first harvest. The nutritive value of grasses was increased with earlier initial harvest and the 30 days of regrowth period after fist harvest. Based on the results, it is suggested that good grass DM productivity and nutritive value could be achieved by the earlier harvest at first and the regrowth period of 30 days after first harvest in spring.

  • PDF

Productivity and Economic Analysis of Sandwich Panel Construction Work by Shop Fabrication (공장가공에 따른 샌드위치 패널공사의 생산성 및 경제성 분석)

  • Cho, Dong-Ryul;Son, Jae-Ho;Lee, Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.113-122
    • /
    • 2009
  • The domestic construction market started to expand steadily since 1970s. The building market which utilizes a sandwich panel with advantages of economical construction expenses and convenient construction has grown rapidly in recent years. However, the companies which specialize in constructing sandwich panels are relatively small or medium size, compared with other construction companies. As a result, studies on the improvement of productivity have not been conducted sufficiently. In this study, the construction sites of sandwich panel are investigated, and the work processes by each team are analyzed. Additionally, the productivity and the construction cost of each work group are analyzed by constructing a model using the Web-Cyclone. It analyzed sensitivities about change of productivity and work costs following in processing place of the panel which is one of the productivity effect factors, so it assayed the optimized productivity by each work group and work costs. Analysis showed that 30% of productivity has improved compared with the factory processing work group, and analysis of work costs showed that about 15% of work costs was increased. Also sensitivity analysis of opening ratio showed that the work costs optimization will be accomplished when about 20% of opening was processed from the factory.

Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems

  • Kim, Hyun-Mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.636-647
    • /
    • 2012
  • Construction projects have become so large, complicated and incredibly high-tech that process management is currently considered one of the most important issues. Unlike typical manufacturing industries, most major construction activities are performed in the open air and thus are exposed to various environmental factors. Many studies have been conducted with the goal of establishing efficient techniques and tools for overcoming these limitations. Productivity analysis and prediction, one of the related research subjects, must be considered when evaluating approaches to reducing construction duration and costs. The aim of this research is to present a quantified impact analysis of construction delay factors on construction productivity of a steel staircase system, which has been widely applied to high rise building construction. It is also expected to improve the process by managing the factors, ultimately achieving an improvement in construction productivity. To achieve the research objectives, this paper analyzed different delay factors affecting construction duration by means of multiple regression analysis focusing on steel staircase systems, which have critical effects on the preceding and subsequent processes in structure construction. Statistical analysis on the multiple linear regression model indicated that the environment, labor and material delay factors were statistically significant, with 0.293, 0.491, and 0.203 as the respective quantified impacts on productivity.

Factors Affecting Productivity of Medical Personnel in Training Hospital (병원의 특성에 따른 의료 인력의 진료 생산성 결정요인)

  • Lee, Myung-Keyn
    • Journal of Preventive Medicine and Public Health
    • /
    • v.20 no.1 s.21
    • /
    • pp.56-66
    • /
    • 1987
  • Information on productivity of hospital personnel is required for optimum staffing and hospital management. This study deals with the quantitative aspects of workload of medical personnel in training hospitals by their specific characteristics. Specifically this study attempted to find relevant determinants of the productivity of medical personnel using multiple stepwise regression analysis based on data obtained from 135 training hospitals. The findings of this study were as follows: 1) Daily average number of outpatients and inpatients treated by a physician were 20.4 and 10.2, respectively. 2) Daily average number of patients cared by a nurse was 8.2. Daily average number of tests performed by pathologic technician and radiologic technician were 83.2 and 21.5, respectively. 3) Productivity of medical personnel were significantly different for the three groups of factors: hospital sire (number of beds, number of medical personnel per 100 beds): institutional characteristics (medical school affiliation, training type, profit status); and environmental factors (location, number of physician and beds per 1,000 population in the region). 4) The factors a(footing the productivity varied according to the types of medical profession: the number if beds, the number of physicians per 100 beds, training type, and profit status for physicians; the number of nurses per 100 beds, the number of beds, medical school affiliation for nurses; the number of physicians per 100 beds, the number of technicians per 100 beds, and ownership for pathologic technicians; the number o( technicians, training type, and the number of physicians per 100 beds for radiologic technician.

  • PDF

Database Design for IoT-based Greenhouse Systems

  • Kang, Chunghan;Yu, Seulgi;Moon, Junghoon
    • Agribusiness and Information Management
    • /
    • v.7 no.2
    • /
    • pp.12-18
    • /
    • 2015
  • Since 2000s, proper utilization of IoT (Internet of Things) technology is a key factor for a firm to become more competitive, and this stream is not exceptional for the food and agriculture industry. Along with this stream, Korea government organization, for example MAFRA (Ministry of Agriculture, Food and Rural Affairs), elected to adopt IoT technology, such as USN and RFID technologies, in the food and agriculture industry. Based on the IoT technology, MAFARA launched six "IoT based farm" project in 2007. IoT based farm project includes IoT based greenhouse system project, and it shows drastic efficiency in terms of cost reduction. When it comes to the productivity, however, the effect of IoT based greenhouse system is still ambiguous. In this regard, this study conducted systems analysis and design for IoT based tomato greenhouse in order to help farmers' decision making related to the productivity by establishing standardized database structure and designing output form to analyze productivity indices. Proposed systems analysis and design can be utilized as a data analysis tools by farmers. Productivity data from the proposed systems is can be used by researchers to identify the relationship among environment, plant growth and productivity. Policy makers also can refer to the data and output forms to predict the quantity of fruit during certain period and to revise production guideline more precisely.