• Title/Summary/Keyword: Productivity management

Search Result 2,569, Processing Time 0.029 seconds

A Study on the Managerial Factors to the Enterprise's Information Productivity (정보생산성에 영향을 미치는 기업경영 요인에 관한 연구)

  • Koo Il Seob;Kim Tae Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.127-135
    • /
    • 2005
  • In general one can find an enormous number of studies about the productivity of land, labor and capital, very little has been done so far to communicate about the productivity of corporate information creating and information-consuming resources in ways that are useful to business executives. In view of the enormous share of corporate spending on information resources it would be useful in planning, budgeting, as well as in performance evaluation to measure how information resources are used in creating EVA(economic value-added). The effectiveness in deploying information resources has potentially a greater effect on corporate financial performance than any other economic influence. That in because corporate executives have greater discretion in directing what their information management staffs will do than in setting the terms for materials purchases, employee compensation, taxes or interest rates. The expenses for information are mostly in the form of overhead costs. Because expenses for information are mostly overhead costs and not for costs of goods, the prudent decision-maker should have a wide array of discretionary options available for allocating this resource. This study is intended for analysis the factors that having effects on the enterprise information productivity and is to description the factor using a foreign enterprise case study.

FDI Spillover Effects on the Productivity of the Indian Pharmaceutical Industry: Panel Data Evidence

  • DESAI, Guruprasad;SRINIVASAN, Palamalai;GOWDA, Anil B
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.8
    • /
    • pp.109-121
    • /
    • 2022
  • The study empirically examines the horizontal spillover effects of foreign direct investment (FDI) on the productivity of Indian pharmaceutical firms. Robust least squares and the Generalized Method of Moments estimators are applied for the firm-level panel data of Indian pharmaceutical companies whose shares were traded on the National Stock Exchange (NSE) and Bombay Stock Exchange (BSE). The information was collected from the Centre for Monitoring Indian Economy (CMIE) Prowess database from 2015 to 2019. Based on the regularity in data availability, the sample firms are limited to 112 companies, 100 of which are domestic firms and 12 international firms. Firms with more than 10 percent foreign equity are classified as FDI firms, while those with less than that are classified as domestic firms. Estimation results show that foreign ownership does not contribute to the productivity of domestic firms. Due to increased competition, the Indian pharmaceutical companies with foreign equity participation are not more productive than local ones. Moreover, the findings reveal a negative and insignificant horizontal spillover effect from FDI on the productivity of domestic enterprises. The absence of horizontal spillovers may be attributable to foreign enterprises' ability to prevent technological outflow to competitors in the same industry.

A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work (철근콘크리트 공사의 작업 생산성 분석을 위한 3차원 객체 활용 정보관리 시스템 구축방안)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.15-24
    • /
    • 2018
  • Despite the recognition of the need for productivity information and its importance, the feedback of productivity information is not well-established in the construction industry. Effective use of productivity information is required to improve the reliability of construction planning. However, in many cases, on-site productivity information is hardly management effectively, but rather it relies on the experience and/or intuition of project participants. Based on the literature review and expert interviews, the authors recognized that one of the possible solutions is to develop a systematic approach in dealing with productivity information of the construction job-sites. It is required that the new system should not be burdensome to users, purpose-oriented information management, easy-to follow information structure, real-time information feedback, and productivity-related factor recognition. Based on the preliminary investigations, this study proposed a framework for a novel system that facilitate the effective management of construction productivity information. This system has utilized Sketchup software which has good user accessibility by minimizing additional data input and related workload. The proposed system has been designed to input, process, and output the pertinent information through a four-stage process: preparation, input, processing, and output. The inputted construction information is classified into Task Breakdown Structure (TBS) and Material Breakdown Structure (MBS), which are constructed by referring to the contents of the standard specification of building construction, and converted into productivity information. In addition, the converted information is also graphically visualized on the screen, allowing the users to use the productivity information from the job-site. The productivity information management system proposed in this study has been pilot-tested in terms of practical applicability and information availability in the real construction project. Very positive results have been obtained from the usability and the applicability of the system and benefits are expected from the validity test of the system. If the proposed system is used in the planning stage in the construction, the productivity information and the continuous information is accumulated, the expected effectiveness of this study would be conceivably further enhanced.

Productivity Analysis by Region and Species of Fish Cage-culture (해상가두리 어류양식업의 지역별 어종별 생산성 분석)

  • Kim, Soo-Hyun;Kim, Dae-Young
    • The Journal of Fisheries Business Administration
    • /
    • v.52 no.3
    • /
    • pp.27-38
    • /
    • 2021
  • This study is aimed to figure out the productivity and variability of cage-aquaculture changes. According to the analysis, the productivity of major fish species has been increasing, except mullet. Although the regional productivity has decreased in the last two years, it has been on the rise considering as a whole. Gyeongsangnam-do showed the highest level of productivity by region. Productivity by species was also higher than other regions in the cases of rock fish, mullet and sea bream followed by productivity of Chungcheongnam-do. The production of marine cage-culture in Jeollanam-do is the second largest in Korea in value/weight while its productivity is lower than that of Chungcheongnam-do. When it comes to comparison by region, Gyeongsangnam-do shows the lowest productivity variation. And Jeollanam-do shows the second-lowest variation in productivity that is only about half of that of Chungcheongnam-do province. Thus, it is found that Jeollanam-do region has an advantage in management stability while its productivity is low. On the other hand, productivity by species was also analyzed. Gyeongsangnam-do has the highest productivity by species for rock fish, mullet and sea bream whereas rock bream productivity is the highest in Jeollanam-do. Therefore, it probably needs to reflect these results when choosing regional-focused incubation fish species.

The Diffusion Period and Productivity of Smartwork by Business Simulation (비즈니스 시뮬레이션으로 살펴본 스마트워크의 확산 기간과 생산성 연구)

  • Jung, Byoungho
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.17 no.1
    • /
    • pp.57-73
    • /
    • 2021
  • The purpose of this study is to analyze the diffusion period and productivity of smartwork in an organization. Firms are increasingly interested in smartwork for non contact work and working from home because of the corona 19. The smartwork is a new technology that changes face-to-face work in an organization. It helps the work of individuals and organizations regardless of time and place. The theoretical background describes the complexity, system thinking, diffusion theory, smart work, organizational resistance, and productivity. This study analyzes the diffusion period and productivity of smart work through business simulation techniques. A simulation study progresses four stages. There are problem definition, hypothesis establishment and causal loop diagram, model construction and verification, and policy evaluation. The simulation models contain an individual's resistance variables organizational investment and leadership variables related to the operation of smartwork. The organizational investment variables include organizational culture, legal system, implement systems and technology investment. The individual resistance variables include cognitive, attitude, structure and technological resistance. The leadership includes leadership interest variables and performance linkage variables. The simulation executed the changes of a people number adopting smart work and the organizational productivity monthly. As a result of the simulation, many organization members have accepted the smart work innovation after 20 months. The organizational productivity through smart work showed very high value after 16 months. In scenario analysis, the individuals' awareness and attitude resistance showed very important variables to productivity and a personal change of smart work adoption. Meanwhile, The organizational investment showed that the high driving-force increased not productivity and the low driving-force showed decreased low productivity. Also, leadership variables showed a powerful driver for changing smart work productivity. The implication of the study has suggested extending complexity, diffusion theory and organization resistance theory based on simulation methods.

A Method of Calculating Baseline Productivity by Reflecting Construction Project Data Characteristics (건설 프로젝트 데이터 특성을 반영한 기준생산성 산정 방법)

  • Kim Eunseo;Kim Junyoung;Joo Seonu;Ahn Changbum;Park Moonseo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.3-11
    • /
    • 2023
  • This research examines the need for a quantitative and objective method of calculating baseline productivity in the construction industry, which is known for its high volatility in performance and productivity. The existing literature's baseline productivity calculation methods rely heavily on subjective criteria, limiting their effectiveness. Additionally, data collection methods such as the "Five-minute Rating" are costly and time-consuming, making it challenging to collect detailed data at construction sites. To address these issues, this study proposes an objective baseline calculation method using unimpacted productivity BP, a work check sheet to systematically record detailed data, and a data collection and utilization process that minimizes cost and time requirements. This paper also suggests using unimpacted productivity BP and comparative analysis to address the objectivity and reliability issues of existing baseline productivity calculation methods.

IMPROVEMENT OF LABOR PRODUCTIVITY BY VISUALIZING EXISTING INFORMATION

  • Kakiuchi Yukio
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.413-418
    • /
    • 1998
  • In order to improve labor productivity in plants, it is important to grasp the existing problems there. But it is not easy for all the people in charge to have the same level understanding to those. This article suggests an approach to tackle with this situation by using various visualization techniques.

  • PDF

Datamodel for Productivity Management of Construction Project (건설공사 생산성 관리를 위한 데이터모델)

  • Ryu Han-Guk;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2002
  • Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

  • PDF

Effect of Wedging on Tree Felling Direction and Productivity (벌도작업에서 쐐기작업 공정이 방향벌도의 정확성과 작업 생산성에 미치는 영향 분석)

  • Eunjai Lee;Sang-Tae Lee;Ho-Seong Mun;Jae-Heun Oh
    • Journal of Korean Society of Forest Science
    • /
    • v.113 no.2
    • /
    • pp.164-169
    • /
    • 2024
  • In South Korea, most felling operations involve the use of chainsaws due to steep and rough terrains. This felling technique is responsible for approximately 80% of all fatalities mainly due to unpredictable felling directions. Therefore, readjust monitorised felling is imperative to improve safety in different working conditions. This study examined the effect of wedging on felling direction error and productivity during felling operations. When wedging was applied, a felling direction error within 22° and a productivity of 0.63 m3/min were obtained. These results show a decrease in mean directional error and a dimish in productivity. Thus, although wedging reduces productivity, it is a necessary strategy to improve safety.

Establishment of Measurement Standards for Productivity Assessment in Construction Project (건설 프로젝트 생산성 평가를 위한 측정 기준 수립)

  • Kim, Junyoung;Yoon, Inseok;Jung, Minhyuk;Joo, Seonu;Park, Seungeun;Hong, Yeungmin;Cho, Jongwoo;Park, Moonseo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.3-12
    • /
    • 2022
  • In general construction project planning ratio of manpower and quantity of outputs produced, such as the construction estimate standard, is used as the criterion for labor productivity. This method is highly effective in construction projects with repetitive work, however, there is a limit to apply in large-scale projects with high complexity. This is because the influence of non-work time caused by various work interruption factors that act complexly on the productivity of the project is greater than the average labor productivity derived from the performance data of the project. Therefore, this study proposes a productivity measurement method that can evaluate the characteristics of construction works and the cause of non-working time. To this end, first, detailed work processes and their non-work factors for each work type are defined, and the Adv-FMR technique is developed for quantitatively measuring them. Next, based on the concept of obtainable productivity, methods for comparative productivity analysis by work type, evaluating non-work factors, and deriving productivity improvement methods are proposed. Finally, a case study is conducted to validate that the analysis results based on Adv-FMR data can support the decision-making of construction managers on productivity management.