• Title/Summary/Keyword: Production time

Search Result 9,571, Processing Time 0.039 seconds

Understanding and Implementation Strategy of Tact Time, Pitch Time and Cycle Time (택트타임, 피치타임, 사이클타임의 이해와 적용방안)

  • Choe, Seong-Un
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.557-561
    • /
    • 2011
  • The study proposes three types of production lead time according to the production or demand pattern. First of all, it discusses the difference of three lead times. While pitch time and cycle time are used in push system with process stock and mass conveyor production, the tact time is used in pull system like as JIT based lean production system.

  • PDF

Determining an Optimal Production Time for EPQ Model with Preventive Maintenance and Defective Rate (생산설비의 유지보수서비스와 제품의 불량률을 고려한 최적 생산주기 연구)

  • Kim, Migyoung;Park, Minjae
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.1
    • /
    • pp.87-96
    • /
    • 2019
  • Purpose: The purpose of this paper is to determine an optimal production time for economic production quantity model with preventive maintenance and random defective rate as the function of a machinery deteriorates. Methods: If a machinery shifts from "in-control" state to "out-of-control" state, a proportion of defective items being produced increases. It is assumed that time to state shift is a random variable and follows an arbitrary distribution. The elapsed time until process shift decreases stochastically as a production cycle repeats and quasi-renewal process is used to implement for production facilities to deteriorate. Results: When the exponential parameter for exponential distribution increases, the optimal production time increases. When Weibull distribution is considered, the optimal production time is closely affected by the shape parameter of Weibull distribution. Conclusion: A mathematical model is suggested to find optimal production time and optimal number of production cycles and numerical examples are implemented to validate the patterns for changes of optimal times under different parameters assumptions. The real application is implemented using the proposed approach.

Real-Time Visual Production using Unity 3D

  • Lee, Dong-Min;Shin, Seung-Jung
    • International journal of advanced smart convergence
    • /
    • v.7 no.4
    • /
    • pp.138-146
    • /
    • 2018
  • Generally, the animation and image production process consists of three stages: Pre-Production, Main-Production, and Post-Production. Real-time video production is also made based on this configuration. On the premise of the increase of productivity by reducing the production time effectively in the main production stage that takes the most time, this study aims to summarize the process of producing videos, focusing on the concrete main production stage. To do this, we propose a method for creating a real-time image from the point of view of the general user using Unity 3D, one of the game engines. Also, this study utilizes the Cinemachine feature provided by Unity 3D, which is suitable for the implementation of the proposed module structure.

Real-Time Batch Size Determination in The Production Line (생산 라인에서의 실시간 배치 크기 결정)

  • Na, Kihyun;Kim, Minje;Lee, Jonghwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.1
    • /
    • pp.55-63
    • /
    • 2019
  • This paper develops an algorithm to determine the batch size of the batch process in real time for improving production and efficient control of production system with multiple processes and batch processes. It is so important to find the batch size of the batch process, because the variability arising from the batch process in the production system affects the capacity of the production. Specifically, batch size could change system efficiency such as throughput, WIP (Work In Process) in production system, batch formation time and so on. In order to improve the system variability and productivity, real time batch size determined by considering the preparation time and batch formation time according to the number of operation of the batch process. The purpose of the study is to control the WIP by applying CONWIP production system method in the production line and implements an algorithm for a real time batch size decision in a batch process that requires long work preparation time and affects system efficiency. In order to verify the efficiency of the developed algorithm that determine the batch size in a real time, an existed production system with fixed the batch size will be implemented first and determines that batch size in real time considering WIP in queue and average lead time in the current system. To comparing the efficiency of a system with a fixed batch size and a system that determines a batch size in real time, the results are analyzed using three evaluation indexes of lead time, throughput, and average WIP of the queue.

A Study on major nations and Koea's FTA policy (주요국의 통상정책과 한국의 FTA 정책방향에 관한 연구)

  • Kim Jongkwon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.415-438
    • /
    • 2004
  • This dissertation is assumed to continuously occur adjustment cost on present investment. So, I derived from time-nonseparable production-based CAPM and tested the performance of model through data. I also compared time-nonseparable production-based CAPM with time-separable production-based CAPM and CCAPM, CAPM through testifying the performance of model. At the part of applied application, I estimated time-nonseparable PCAPM-betas. The data of Korea consists of 320 listed companies on Korea Stock Exchange (KOSPI) from first quarter 1987 to first quarter 2002. This data also is categorized by scale and industries. Additionally, I estimated time-nonseparable PCAPM-betas through 500 listed companies of New York Stock Exchange (NYSE) from first quarter 1973 to first quarter 2002. I observed the statistical significance of 230 firms by 320 companies in Korea. After that, I compared time-nonseparable PCAPM-betas by firms with time-separable production-based CAPM-betas and CCAPM-betas, CAPM-betas through individual firms. At empirical test, I found that estimated parameter of adjustment cost on time-nonseparable production-based CAPM by scale and industries in Korea had positive value and statistical significance, Moreover, this approach proved to resolve the underestimation of adjustment cost on time-separable production-based CAPM by scale and industries. I also found that the time-nonseparable PCAPM performed better than time-separable production-based CAPM and CCAPM, CAPM. The result from U.S data proved to have similarity to that of Korea. Specifically, I found that time-nonseparable PCAPM-betas by firms performed better than CAPM-betas on individual firms in Korea.

  • PDF

Minimizing Production Lead Time of Kanban System in a Stochatic Environment

  • Kim, Ilhyung
    • Management Science and Financial Engineering
    • /
    • v.8 no.2
    • /
    • pp.1-20
    • /
    • 2002
  • This paper presents a model that analyzes the impact of uncertainties in demand and processing times on the production lead time of a Kanban system. We consider the waste associated with under-production as well as over-production when we measure the production lead time. We set up an optimization model to minimize the production lead time. A simple heuristic procedure is developed to determine solutions in terms of the size of containers and the number of Kanban cards. In addition, we numerically examine the behavior of the optimal Kanban system.

Implementation of Real-time Integrated Platform for Producing Food Packaging Container

  • Kim, Chigon;Park, Jong-Youel;Park, Dea-Woo
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.194-200
    • /
    • 2021
  • This study proposes a plan to construct an integrated platform that reduces manufacturing costs and efficiently produce by integrating the systems of main producers, production subcontractors, and raw material subcontractors for the production of food packaging containers. The production plan of food packaging containers and raw materials is established in real time between the main producers, production subcontractors, and raw material subcontractors in consideration of the demand characteristics of each product. It establishes basic information that all processes from the production planning stage to the forwarding stage of the product are linked to each other. The progress of each producer of interlinked processes is shared in real-time to improve productivity and quality of food packaging containers and raw materials and reduce manufacturing costs. By monitoring the system of the main producer and the production subcontractor in real time, the production of food packaging containers is performed in a timely manner, thereby improving productivity. The application of the plan-do-check-action (PDCA) process, which includes planning, execution, evaluation and improvement in the production operation processes of the main producer, production subcontractor and raw material subcontractor, enables improved production compliance rate. The contents of the main producers, production subcontractors, and raw material subcontractors are managed in real time, then a converged production management system is established through the platform proposed in this study to ensure timely supply and demand of raw materials without delay in ordering.

Mechanized tunnels lining prefabricated segments production methods

  • Elaheh Banihashemigargari;Amir H. Rezaeifarei
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.503-512
    • /
    • 2023
  • In tunneling projects, a significant part of the costs is spent on segment production. By more economically producing, the cost of tunnel construction can be greatly reduced, especially in long and large-diameter tunnels. In the present study, the effect of using the Carousel method in the improvement of the production system performance compared to the conventional Static system has been studied. To carry out the research, a quantitative comparison of cost and production time was carried out for two production methods using the available documentation. The opinions of experts have been obtained using questionnaires and qualitative comparison of cost, time and production quality was done by implementation of statistical analysis. The SPSS software and the univariate t-test were used to analyze the questionnaires. According to the results of statistical analysis with SPSS, the use of the Carousel method will reduce production time and costs along with increasing manufacturing quality. According to the documentation analysis, the Carousel method reduces the cost of production by almost 30% and leads to a reduction of the production time to approximately 40% of the Static moulds system. The Carousel method has a higher production rate, efficiency, and better performance. Research into quantifying the benefits of Carousel method in the production system performance is very limited. This comparison is based on real information from the under construction Tabriz Metro project. This article can be very helpful in choosing the best production method.

Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule (대일정 생산 계획에 따른 조선소 생산 용량의 초기 평가를 위한 이산사건 시뮬레이션)

  • Kim, Kwang-Sik;Hwang, Ho-Jin;Lee, Jang-Hyun
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.2
    • /
    • pp.111-122
    • /
    • 2012
  • Capacity planning plays an important role not only for master production plan but also for facility or layout design in shipbuilding. Product work breakdown structure, attributes of production resources, and production method or process data are associated in order to make the discrete event simulation model of shipyard layout plan. The production amount of each process and the process time is assumed to be stochastic. Based on the stochastic discrete event simulation model, the production capacity of each facility in shipyard is estimated. The stochastic model of product arrival time, process time and transferring time is introduced for each process. Also, the production capacity is estimated for the assumed master production schedule.

An Effectivity Analysis of Production Control Policies Based on Demand and Production Characteristics (수요 및 생산특성에 따른 생산통제 기법간의 효율성 분석에 대한 연구)

  • Lee, Jang-Han;Jeong, Han-Il;Park, Jin-Woo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.2
    • /
    • pp.403-420
    • /
    • 1997
  • In this paper, we examine the effect of production uncertainty to production control policies. First, we examine two famous production control policies, namely, MRP and JIT from the view point of shop floor control perspective, and analyze the differences between them due to demand fluctuations and activity time variations. Second, we conduct simulation studies on MRP and JIT to draw out the effects of demand fluctuations and activity time variations. Demand fluctuations are further classified into demand lumpiness and demand irregularity. And, activity time variations are further classified into stationary time variations and non-stationary time variations. Experimental results show that, in terms of demand fluctuations, MRP is affected by demand lumpiness, but JIT by demand irregularity. And we also see that both MRP and JIT are influenced by stationary time variation with respect to activity time variations.

  • PDF