In this paper, the employment planning model is developed which is a decision-making model for determining the optimum employment level with respect to varying net manpower requirement for each planing period such that total cost in a planning horizon is minimized. It is constructed as a nonlinear programming model and a dynamic programming model on the basis of studies in the areas of production smoothing and manpower scheduling. Costs for a planning period are categorized into regular wage cost, hiring cost, and overtime cost. The first is a linear function. The other two cost functions are of quadratic nature. The planning horizon of this planning model is intermediate range (five years) for which a fair planning accuracy can be guaranteed. The model considers learning period for each job class. It is simple and an optimum solution can be easily obtained by direct search techniques.
The network representation and branch and bound algorithm with efficient lower and upper bounding procedures are developed to determine a global optimal production schedule on a machine that minimizes sequence-dependent setup cost and earliness/tardiness penalties. Lower bounds are obtained based on heuristic and Lagrangian relaxation. Priority dispatching rule with local improvement procedure is used to derive an initial upper bound. Two dominance criteria are incorporated in a branch and bound procedure to reduce the search space and enhance computational efficiency. The computational results indicate that the proposed procedure could optimally solve the problem with up to 40 jobs in a reasonable time using a personal computer.
공정계획(process planning)이란 제품에 대한 설계정보 및 제한된 가용자원에 대한 정보를 바탕으로 비용, 생산량을 고려하여 원자재를 원하는 형태로 변형시키기 위한 방법의 체계적인 결정과정이라 할 수 있으며, 생산계획(production planning: scheduling)이나 작업계획(operation planning)과 연계하여 설계와 생산을 연결하는 교량 역할을 수행한다. 이러한 공정계획 작업을 컴퓨터에 의해 자동화하기 위한 컴퓨터 원용 공정계획(computer aided process planning : CAPP)은 변환적 방식(variant approach)에서 시작되어 창생적 방식(generative approach)으로 발전되어 왔으며 인공지능 기법을 응용 한 지식기반 CAPP(knowledge based CAPP) 방식에 이르기 까지 CAM-1's CAPP, APPAS, GARE, SIPS, XCUT등 수많은 연구가 행해 졌다. 본 연구에서는 자동차 부품 업체인 K사의 공정계획 사례를 바탕으로 범용성이 있는 개방형 공정계획 시스템의 개발을 목표로 한다. 본 시스템에서 i) 설계정보는 객체지향에 의해 표현된 형상특징을 사용하고 ii) 공정계획은 국부적 공정계 획과 전체적 공정계획 과정(golbal planning)으로 구별하였고 iii) 공정계획을 위한 정보는 지식 베이스(knowledge base : KB) 와 데이타 베이스(data base : DB)로 구분하였다. 또한 iv) 정보의 모듈화를 통하여 임의의 제조라인에 적합하도록 개방형을 추구하였다.
The setting of the factory under this study is as the following. There are multiple assembly lines. Each line can handle any of given set of products. Furthermore each line is capable of assembling several products concurrently, i.e. mixed model assembly line. An incoming production order is characterized by its due-date, product type and quantity. Under this setting we first have to select the starting time and the place(assembly line) for an order to be processed. We also have to devise a way to control orders to be manufactured as scheduled. Finally there should be a mean to reschedule orders when something unexpected happens. This paper offers a scheme that provides the above mentioned necessities. It also provides a case where the scheme is applied.
한국농업기계학회 1993년도 Proceedings of International Conference for Agricultural Machinery and Process Engineering
/
pp.952-965
/
1993
A simulation modeling is necessary for the optimal design of a rice processing plant, which consists of a facility (a silo system) of rice drying and storage and a rice mill plant. In a rice processing plant, the production scheduling and the decision on capcity of each unit based on a queuing theory is very important and difficult. In this study a process-oriented simulation model was developed for the design of a rice drying and storage system with SLAMSYSTEM. The simulation model is capable of simulating virtually all the processing activities and provides work schedules which minimize total processing time , mean flow time and bottleneck of the plant system and estimate drying time for a batch in a drying silo. Model results were used for determination the size and capacity of each processing unit and for analyzing the performance of the plant . The developed model was actually applied to construct a grain silo system for rice drying and storage.
The heat demand prediction is an essential issue in management of district heating system. Without an accurate prediction through the lead-time period, it might be impossible to make a rational decision on many issues such as heat production scheduling and heat exchange among the plants which are very critical for the district heating company. The heat demand varies with the temperature as well as the time nonlinearly. And the parametric specification of the heat demand model would cause a misspecification bias in prediction. A nonparametric model for the short-term heat demand prediction has been developed as an alternative to avoiding the misspecification error and tested with the actual data. The prediction errors are reasonably small enough to use the model to predict a few hour ahead heat demand.
통합생산시스템의 최적설계를 위하여 이의 생산공정(Manufacturing Process)과 물류시스템 (Material Handling System)은 두 가지 중요한 요소이다. 본 연구에서는 물류시스템의 성능 및 비용을 분석을 위하여 제품의 생산계획(Production Control & Scheduling), 설비배치(Layout) 및 물류시스템 (Material Handling System) 등을 고려하였다. 본 연구의 주요 목적을 통합생산시스템을 위하여 물류시스템 성능의 최적화와 경제적인 분석을 통하여 최적 물류시스템의 선택에 두고 다음 주요 내용들을 포함하였다; 1) 주요 입력 자료로서 통합생산 장비의 배치(Layout), 공정, 생산제품의 예측, 물류시스템 대안 등이 주어지고, 2) 이를 이용하여 각 물류시스템의 대안별 성능 및 비용 등을 비교 분석하고 최적 물류시스템을 선정한다. 본 연구를 위한 성능 및 비용분석을 위한 전산프로그램을 개발하고 이를 활용한 사례를 들어 보였다.
Recently, A manufacturing formula centered of the customer is one of the most important parts for the company competition. Especially, it is the matters of weight and importance that Make to Order(MTO) and Make to stock(MTS) is considered at the same time for designing manufacturing system based the order effectly. This paper suggests a alternative Available to promise(ATP) and capable to promise(CTP) to confirm the delivery time to customer, how to link mid-long term production plan with short term daily based scheduling, how to relate middle processes of device based industry to mid-long term plan through the example of S company in a manufacturing formula mixed MTO and MTS
A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.
This paper presents the study on the development of a DNC, system IPIS(Interactive Plant Information System)/DNC, which can manage NC machines and robots as a distributed control method in the machine. processing factory. The IPIS/DNC system is composed of a host computer, satellites and NC machines. A set of software modules are developed on the host computer and the satellites separately. By modularizing each functions of the IPIS/DNC system and using multi-taking method, the functions such as NC program management, NC program distribution, and shop monitoring can be performed on the host computer, and the functions such as NC program transfer to the NC machines, and NC program editing can be performed on the satellites. A Relational database which is linked with job scheduling system is used for IPIS/DNC system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.