• Title/Summary/Keyword: Production and Delivery

Search Result 524, Processing Time 0.024 seconds

Synthesis, Characterization and In Vitro Evaluation of Triptolide-lysozyme Conjugate for Renal Targeting Delivery of Triptolide

  • Zheng, Qiang;Gong, Tao;Sun, Xun;Zhang, Zhi-Rong
    • Archives of Pharmacal Research
    • /
    • v.29 no.12
    • /
    • pp.1164-1170
    • /
    • 2006
  • A triptolide-lysozyme (TP-LZM) conjugate was synthesized to achieve renal specific delivery and to reduce the side effects of triptolide. Triptolide was coupled to lysozyme through succinic via an ester bond with an average coupling degree of 1 mol triptolide per 1 mol lysozyme. The lysozyme can specifically accumulate in the proximal tubular cells of the kidney, making it a potential carrier for targeting drugs to the kidney. The structure of triptolide succinate (TPS) was confirmed by IR, $^{1}H-NMR$, MS and UV. The concentrations of triptolide in various samples were determined by reversed-phase high-performance liquid chromatography (HPLC). In this study, the physicochemical and stability profiles of TP-LZM under various conditions were investgated the stability and releasing profiles of triptolide-lysozyme (TP-LZM) under various conditions. In vitro release trails showed triptolide-lysozyme was relatively stable in plasma (less than 30% of free triptolide released) and could release triptolide quickly in lysosome (more than 80% of free triptolide released) at $37^{\circ}C$ for 24 h. In addition, the biological activities of the conjugate on normal rat kidney proximal tubular cells (NRK52E) were also tested. The conjugate can effectively reduce NO production in the medium of NRK52E induced by lipopolysaccharide (LPS) but with much lower toxicity. These studies suggest the possibility to promote curative effect and reduce its extra-renal toxicity of triptolide by TP-LZM conjugate.

LEAN CONSTRUCTION MEANS TO PROMOTE GOOD- AND ERADICATE BAD VARIATION

  • Iris D. Tommelein
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.51-59
    • /
    • 2009
  • Lean construction researchers and practitioners have established a new paradigm for managing construction projects. This paradigm stems from insights gained by viewing project delivery as one kind of production and, inspired by the success of the Toyota Production System, leveraging Toyota's 'lean thinking' in the context of such one-of production. Premises of lean construction are that (1) production systems are riddled with variation, (2) variation can be good or bad, but most of it is bad, (3) most of this variation-good or bad-is self-inflicted; consequently 'lean' passionately promotes good- and relentlessly eradicates bad variation. This paper surveys a few of many lean construction means to manage variation. Lean thinking encompasses a lot more than thinking about variation, but that is the lens used here through which construction project management is viewed. Pairing these premises with lean variation-management tools may help readers broaden the insights they can gain from reading the lean construction literature.

  • PDF

A Study on the Heuristic Solution for n/m Job-Shop Scheduling Problems of Slack Degree (Slack Degree에 의한 n/m Job-Shop 스케줄링 문제의 발견적 해법에 관한 연구)

  • 김제홍;조남호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.39
    • /
    • pp.275-284
    • /
    • 1996
  • It can be made a definition that scheduling is a imposition of machinery and equipment to perform a collection of tasks. Ultimately scheduling is an assessment of taking order for which would be perform. So it is called "sequencing" in other words. In a job shop scheduling, the main object is to making delivery in accordance with the due date and order form customer, not to producing lots of quantity with minimizing mean flow time in a given time. Actually, in a company, they concentrate more in the delivery than minimizing the mean flow time. Therefore this paper suggest a new priority dispatching rule under consideration as below in a n/m job shop scheduling problem with due date. 1. handling/transportation time, 2. the size of customer order With this algorithm, we can make a scheduling for minimizing the tardiness of delivery which satisfy a goal of production.roduction.

  • PDF

A Case Study on the Process Improvement Using JIT Concept in a Company (제조업체에 있어서 JIT 개념을 활용한 공정개선 사례연구)

  • 권병우;이동형;김진수;임준묵
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.55
    • /
    • pp.43-50
    • /
    • 2000
  • Recently, the companies can't avoid the change toward the jobbing production from mass production because manufacturing types are changed from manufacturing-oriented to customer-oriented for the security of competitive power among the related companies. The jobbing production system usually has such problems as low productivity, high unit cost, much stocks, long manufacturing time and one-sided decision of delivery date compared with the mass production. In order to settle these problems in the jobbing production system, we introduced the JIT production system including 3 regulations & 6S activities and Kanban system etc. The effective operation of JIT production system makes the processes efficiently and reduces the unneeded stocks and maximizes the revenue of company.

  • PDF

A Dynamic OHT Routing Algorithm in Automated Material Handling Systems (자동화 물류시스템 내 차량 혼잡도를 고려한 무인운반차량의 동적 경로 결정 알고리즘)

  • Kang, Bonggwon;Kang, Byeong Min;Hong, Soondo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.40-48
    • /
    • 2022
  • An automated material handling system (AMHS) has been emerging as an important factor in the semiconductor wafer manufacturing industry. In general, an automated guided vehicle (AGV) in the Fab's AMHS travels hundreds of miles on guided paths to transport a lot through hundreds of operations. The AMHS aims to transfer wafers while ensuring a short delivery time and high operational reliability. Many linear and analytic approaches have evaluated and improved the performance of the AMHS under a deterministic environment. However, the analytic approaches cannot consider a non-linear, non-convex, and black-box performance measurement of the AMHS owing to the AMHS's complexity and uncertainty. Unexpected vehicle congestion increases the delivery time and deteriorates the Fab's production efficiency. In this study, we propose a Q-Learning based dynamic routing algorithm considering vehicle congestion to reduce the delivery time. The proposed algorithm captures time-variant vehicle traffic and decreases vehicle congestion. Through simulation experiments, we confirm that the proposed algorithm finds an efficient path for the vehicles compared to benchmark algorithms with a reduced mean and decreased standard deviation of the delivery time in the Fab's AMHS.

Enhanced Delivery of siRNA Complexes by Sonoporation in Transgenic Rice Cell Suspension Cultures

  • Cheon, Su-Hwan;Lee, Kyoung-Hoon;Kwon, Jun-Young;Choi, Sung-Hun;Song, Mi-Na;Kim, Dong-II
    • Journal of Microbiology and Biotechnology
    • /
    • v.19 no.8
    • /
    • pp.781-786
    • /
    • 2009
  • Small interfering synthetic double-stranded RNA (siRNA) was applied to suppress the expression of the human cytotoxic-T-Iymphocyte antigen 4-immunoglobulin (hCTLA4Ig) gene transformed in transgenic rice cell cultures. The sequence of the 21-nucleotide siRNA was deliberately designed and synthesized with overhangs to inactivate the expression of hCTLA4Ig. The chemically synthesized siRNA duplex was combined with polyethyleneimine (PEl) at a mass ratio of 1:10 (0.33 ${\mu}g$ siRNA:3.3 ${\mu}g$ PEl) to produce complexes. The siRNA complexes (siRNA+PEI) were labeled with Cy3 in order to subsequently confirm the delivery by fluorescent microscopy. In addition, the cells were treated with sonoporation at 40 kHz and 419W for 90 s to improve the delivery. The siRNA complexes alone inhibited the expression of hCTLA4Ig to 45% compared with control. The siRNA complexes delivered with sonoporation downregulated the production of hCTLA4Ig to 73%. Therefore, we concluded that the delivery of siRNA complexes into plant cells could be enhanced successfully by sonoporation.

A Case Study of the Construction of Smart Factory in a Small Quantity Batch Production System: Focused on IDIS Company (다품종 소량 생산 체제의 스마트 공장 구축 사례: (주) IDIS를 중심으로)

  • Oh, sea-nam;Park, won-chul;Riew, Moon Charn;Lee, Min Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.1
    • /
    • pp.11-26
    • /
    • 2018
  • Purpose: This study is to help the construction of smart factories of other manufacturing enterprises through IDIS 's case of smart factory construction. Methods: We introduce the four phases of implementing smart factory building by IDIS company, which produces a small quantity of multi-odd units. Results: Through the smart factory construction, the cost of product is reduced due to the improvement of total productivity such as office work, production work, and energy saving, and sales are enhanced by customized production, quality / delivery reliability improvement. Conclusion: We present the actual examples needed to build the manufacturer's smart factory.

Production Planning and Kanban Operations in JIT Systems for Small Manufacturers (중소기업을 위한 JIT 생산방식 : 생산계획(生産計劃)의 수립과 칸반의 운용(運用))

  • Chung, Nam-Kee;Yoo, Chul-Soo
    • IE interfaces
    • /
    • v.5 no.2
    • /
    • pp.29-37
    • /
    • 1992
  • An approach to Just-In-Time for small job-shop-type manufacturers is presented. This is aimed at those who understand the pull production system, however, cannot afford either swift changeover in workcenters or frequent delivery to customers. First, as a production planning technique, a lot-sizing model entitled Multilevel Least Total Cost Model(MLTCM) is developed; The production order quantities of each components be those requiremensts of the end item production lot. The contribution of MLTCM is shown via simulation. Then, a framework of the Kanban operations is designed; A Production Control Kanban is introduced as a communication tool with Production Kanban in a job-shop.

  • PDF

Automobile Assembly Sequence System Using Production Information (생산정보를 이용한 자동차 조립 서열시스템에 관한 연구)

  • Ock, Young-Seok;Kim, Byung Soo;Bae, Jun-Hee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.3
    • /
    • pp.8-15
    • /
    • 2014
  • For zero inventory and mixed assembly production, JIT (Just In Time) production system in Toyota and JIS (Just-In-Sequence) production system in Hyundai motor co. have been proposed in automobile production areas. Even though the production systems are popular in the areas, many subcontract companies producing part-modules for final production at a parent company suffers from excessive or shortage amount of inventory due to the time gap of production and delivery to the parent company. In this study, we propose an efficient real-time assembly sequence system applying a well-known Pareto method using Paint-In information in painting process and daily production planning information. Based on this system, a production line can estimate the shortage amount of UPH (Units Per Hour) at production line and recovers the amount before operating assembly production in the line. The proposed system provides efficiency on productivity compared with the previous system.

A Scheme of Data-driven Procurement and Inventory Management through Synchronizing Production Planning in Aircraft Manufacturing Industry (항공기 제조업에서 생산계획 동기화를 통한 데이터기반 구매조달 및 재고관리 방안 연구)

  • Yu, Kyoung Yul;Choi, Hong Suk;Jeong, Dae Yul
    • The Journal of Information Systems
    • /
    • v.30 no.1
    • /
    • pp.151-177
    • /
    • 2021
  • Purpose This paper aims to improve management performance by effectively responding to production needs and reducing inventory through synchronizing production planning and procurement in the aviation industry. In this study, the differences in production planning and execution were first analyzed in terms of demand, supply, inventory, and process using the big data collected from a domestic aircraft manufacturers. This paper analyzed the problems in procurement and inventory management using legacy big data from ERP system in the company. Based on the analysis, we performed a simulation to derive an efficient procurement and inventory management plan. Through analysis and simulation of operational data, we were able to discover procurement and inventory policies to effectively respond to production needs. Design/methodology/approach This is an empirical study to analyze the cause of decrease in inventory turnover and increase in inventory cost due to dis-synchronize between production requirements and procurement. The actual operation data, a total of 21,306,611 transaction data which are 18 months data from January 2019 to June 2020, were extracted from the ERP system. All them are such as basic information on materials, material consumption and movement history, inventory/receipt/shipment status, and production orders. To perform data analysis, it went through three steps. At first, we identified the current states and problems of production process to grasp the situation of what happened, and secondly, analyzed the data to identify expected problems through cross-link analysis between transactions, and finally, defined what to do. Many analysis techniques such as correlation analysis, moving average analysis, and linear regression analysis were applied to predict the status of inventory. A simulation was performed to analyze the appropriate inventory level according to the control of fluctuations in the production planing. In the simulation, we tested four alternatives how to coordinate the synchronization between the procurement plan and the production plan. All the alternatives give us more plausible results than actual operation in the past. Findings Based on the big data extracted from the ERP system, the relationship between the level of delivery and the distribution of fluctuations was analyzed in terms of demand, supply, inventory, and process. As a result of analyzing the inventory turnover rate, the root cause of the inventory increase were identified. In addition, based on the data on delivery and receipt performance, it was possible to accurately analyze how much gap occurs between supply and demand, and to figure out how much this affects the inventory level. Moreover, we were able to obtain the more predictable and insightful results through simulation that organizational performance such as inventory cost and lead time can be improved by synchronizing the production planning and purchase procurement with supply and demand information. The results of big data analysis and simulation gave us more insights in production planning, procurement, and inventory management for smart manufacturing and performance improvement.