• 제목/요약/키워드: Production Rules

검색결과 336건 처리시간 0.027초

熔接이음부의 形象 最適化에 關한 硏究 (A Study on the Optimization of Shape of Weld Joints)

  • 방한서;강성원
    • Journal of Welding and Joining
    • /
    • 제15권4호
    • /
    • pp.70-77
    • /
    • 1997
  • Welding is one of the most important and popular joining techniques employed in structures. In spite of, weld designs depend on the rules and regulations. Moreover, the study to optimize a shape of welding joint not may be sufficient and systematic on the theoretical and experimental sides. Therefore, in this study, a computer program based on thermal elasto plastic theory is developed for optimizing(minimizing) shape of weld joints. By the results, study is made on the characteristics of the distributions of welding residual stresses and plastic strains, and their production mechanisms. Also, Various kinds of tests are carried out to find out mechanical characteristics due to shape of weld joints. As a result of this optimization(minimization) of weld joints, the productivity and the reliability will be improved.

  • PDF

DSS와 사례기반 추론의 결합 (Integrating Case-Based Reasoning with DSS)

  • 김진백
    • 경영과정보연구
    • /
    • 제2권
    • /
    • pp.169-193
    • /
    • 1998
  • Case- based reasoning(CBR) offers a new approach for developing knowledge based systems. Unlike the rule-based paradigm, in which domain knowledge is encoded in the form of production rules, in the case-based approach the problem solving experience of the domain expert is encoded in the form of cases stored in a casebase(CB). CBR allows a reasoner (1) to propose solutions in domains that are not completely understood by the reasoner, (2) to evaluate solutions when no algorithmic method is available for evaluation, and (3) to interprete open-ended and ill-defined concepts. CBR also helps reasoner (4) take actions to avoid repeating past mistakes, and (5) focus its reasoning on important parts of a problem. Owing to the above advantages, CBR has successfully been applied to many kinds of problems such as design, planning, diagnosis and instruction. In this paper, I propose case-based DSS(CBDSS). CBDSS is an intelligent DSS using CBR technique. CBDSS consists of interface, case-based reasoner, maintainer, casebase management system, domain dependent CB, domain independent CB, and so on.

  • PDF

한-EU FTA 협상에서 관세환급제도에 대한 논의와 경제적 효과 (A Review on the discussion of the duty drawback system in Korea-EU FTA negotiations)

  • 박현희
    • 통상정보연구
    • /
    • 제12권2호
    • /
    • pp.213-237
    • /
    • 2010
  • Duty refund taken exports of raw materials in the manufacture of goods for import duties paid, and refunds, as a system, enhance the price competitiveness of domestic exporters to promote exports is established for them. The duty drawback system is consumed in the production of export goods levied on imported inputs does not exceed the level of reimbursement is established within the WTO rules do not restrict the export support policy is one of. Korea-EU FTA negotiations is a drawback in the ongoing maintenance of claims, while the EU claims that the duty drawback system can not be negotiated until the end of the field of focus is discussed. Intermediate goods imports to Korea is a higher percentage was pointed out the importance of duty drawback, EU FTA, the duty drawback is not a party to remain exporters of raw materials, such as 3rd party can not go back because the benefits were opposed to. The final one-EU Concessions for the current duty drawback system was to maintain continuous.

  • PDF

a hybrid approach for jobshop scheduling with lot-streaming

  • 김인수;서윤호
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 2007년도 춘계학술대회
    • /
    • pp.491-497
    • /
    • 2007
  • The planning and scheduling is considered as an important function because it influence to the overall performance of production in manufacturing system for supporting global objectives. In this paper, propose the hybrid approach to solve the problem which considered alternative resources and sequences, a sequence-dependent setups and transportation times. The objective of this problem is minimize the makespan with AGV traveling time. A iterative two heuristic algorithm(PSO, SA) is proposed to obtain the sequence of operations and CPLEX package is used to obtain the optimal sub-lot sizes(OLS) when the sequence of operations and greedy-based AGV dispatching rules are fixed or given. we show that performance of iterative two heuristic algorithms and simple numerical experiment.

  • PDF

공압 진공장치 설계를 위한 전문가 시스템 개발에 관한 연구 (A Study on the Development of Expert System for Pneumatic Vacuum Equipment Design)

  • 신흥열;김준식;이재원
    • 한국정밀공학회지
    • /
    • 제14권4호
    • /
    • pp.15-21
    • /
    • 1997
  • Pneumatics is widly used in the industrial implementation, in the operation of air-powered actuators and the control devices needed in their operation. However, there are many empirical factors in pneumatics design, it might cause excessive design of pneumatic components. For that reason, we developed VDES(Vacuum Design Expert System) for the economic design of pneumatic vacuum equipment. VDES is achieved with CLIPS(C Language Integrated Production System) and knowledge base that contains a number of facts and rules for pneumatic vacuum design. Forward chaining and depth first search technique are used in this system. Appling VDES to the actual field, this system is verified to be a good efficiency and could be applied to the field of pneumatic vacuum equipment design.

  • PDF

축대칭 디프 드로잉 제품에 대한 공정설계 시스템의 적용 (Application of Computer-Aided Process Design System for Axisymmetric Deep Drawing Products)

  • Park, S.B.;Park, Y.;Park, J.C.
    • 한국정밀공학회지
    • /
    • 제14권4호
    • /
    • pp.145-150
    • /
    • 1997
  • A computer-aided process design system for axisymmetric deep drawing products has been developed. An approach to the system is based on the knowledge based system. The hypothesized process outline of the deep drawing operations is generated in the geometrical design module of the system. In this paper, the module has been expanded. The rules of process design sechems for complex cup drawings are formulated from handbooks, experimental results and empirical knowhow of the field experts. The input to the system is final sheet-metal objects geometry and the output from the system is process sequence with intermediate objects geometries and process parameters, such as drawing load, blank holding force, clearance and cup-drawing coefficient.

  • PDF

공급사슬경영에 있어서의 납기 회신 시스템 (An ATP Quotation System in Supply Chain Management)

  • 심승배;한주윤;정봉주
    • 산업공학
    • /
    • 제13권3호
    • /
    • pp.405-415
    • /
    • 2000
  • The accurate quotation of Available-To-Promise (ATP) plays a very important role in enhancing customer satisfaction and fill rate maximization. However, the complexity of Supply Chain structure, which includes all the linkages among procurement, production, and distribution, makes the accurate quotation of ATP be a quite difficult job. This paper presents a computerized ATP quotation system in global SCM environments where the worldwide headquarter, distribution centers, and manufacturing facilities are globally networked. We modeled the ATP quotation processes with the definition of required data flow and a comprehensive ATP-algorithm was newly developed. The illustrative example shows the efficiency of the proposed system is largely affected by the selection of alternative rules used in ATP-algorithm.

  • PDF

주문 생산 방식을 따르는 혼합 흐름 공정에서의일정계획에 관한 연구 (Scheduling Methods for a Hybrid Flowshopwith Dynamic Order Arrival)

  • 이근철
    • 대한산업공학회지
    • /
    • 제32권4호
    • /
    • pp.373-381
    • /
    • 2006
  • This paper considers a scheduling problem for a hybrid flowshop with dynamic order arrival. A hybrid flowshop is an extended form of a flowshop, which has serial stages like a flowshop but there can be more than one machine at each stage. In this paper, we propose a new method for the problem of scheduling with the objective of minimizing mean tardiness of orders which arrive at the shop dynamically. The proposed method is based on the list scheduling approach, however we use a more sophisticated method to prioritize lots unlike dispatching rule-based methods. To evaluate the performance of the proposed method, a simulation model of a hybrid flowshop-type production system is constructed. We implement well-known dispatching rules and the proposed methods in the simulation model. From a series of simulation tests, we show that the proposed methods perform better than other methods.

주문형 반도체 웨이퍼 공정분석을 위한 시뮬레이션 연구 (A Simulation Study for Analyzing an on-Demand Semiconductor Wafer Process)

  • 김기영;이정호;강창호;김갑환
    • 산업공학
    • /
    • 제18권1호
    • /
    • pp.22-34
    • /
    • 2005
  • This paper introduces a simulation model which is based on the process analysis of a semiconductor company. The objective of the simulation modelis not only to estimate the overall performancesof the company but also to evaluate the performances of various operation rules for shop floor control. First, in order to develop the simulation model, a time study is performed for each process after analyzing the processes for the company. Second, by using ARENA, a simulation model is constructed based on the process analysis and the time study. After the simulation model is tested and run, its results are discussed.

시작시기와 납기를 고려하는 유연흐름공장의 일정계획 (A Scheduling Scheme for Flexible Flow Shop with Release Date and Due Date)

  • 이주한;김성식
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.1-13
    • /
    • 1998
  • This paper addresses a scheduling scheme for Flexible Flow Shop(FFS) in the case that a factory is a sub-plant of an electronic device manufacturing plant. Under this environment, job orders for the sub-plants in the production route are generated together with job processing time bucket when the customer places orders for final product. The processing time bucket for each job is a duration from possible release date to permissible due date. A sub-plant modeled FFS should schedule these jobs orders within time bucket. Viewing a Printed Circuit Board(PCB) assembly line as a FFS, the developed scheme schedules an incoming order along with the orders already placed on the scheduled. The scheme consists of the four steps, 1)assigning operation release date and due date to each work cells in the FFS, 2)job grouping, 3)dispatching and 4)machine allocation. Since the FFS scheduling problem is NP-complete, the logics used are heuristic. Using a real case, we tested the scheme and compared it with the John's algorithm and other dispatching rules.

  • PDF