• Title/Summary/Keyword: Production Plan

Search Result 1,067, Processing Time 0.037 seconds

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

A Study on Smart Teaching Plan Production System Combined Education Profiling (교육 프로파일링을 융합한 스마트 교안제작 시스템에 관한 연구)

  • Kim, Ki-Bong;Cho, Han-Jin
    • Journal of Digital Convergence
    • /
    • v.13 no.3
    • /
    • pp.185-191
    • /
    • 2015
  • We are fusing to the profiling techniques in education and making to a smart teaching plan production systems. Therefore, we investigated based on technical elements necessary for the proper look for profiling techniques, trends in the technology and product trends. We proposed that is smart teaching plan production system such as the smart teaching plan production and editing technique, the management technique for the smart teaching plan, and works for relation skill to smart teaching plan production systems. If you using the techniques that we were proposed to build effective smart teaching plan production system, management system for contents control, virtual classroom then they can management their's class and class teaching plan production, file management to teaching group easy. and those students can easy understand in their class too easy.

Efficiency Estimation of Process Plan Using Tolerance Chart

  • Kim I.H.;Dong Zuomin
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.2
    • /
    • pp.148-155
    • /
    • 2006
  • This paper presents a new method for assessing the efficiency of production process plans using tolerance chart to lower production cost. The tolerance chart is used to predict the accuracy of a part that is to be produced following the process plan, and to carry out the quantitative measurement on the efficiency of the process plan. By comparing the values of design tolerances and their corresponding resultant tolerances calculated using the tolerance chart, the process plan that is incapable of satisfying the design requirements and the faulty production operations can be identified. Similarly, the process plan that imposes unnecessarily high accuracy and wasteful production operations can also be identified. For the latter, a quantitative measure on the efficiency of the process plan is introduced. The higher the unnecessary cost of the production, the poor is the efficiency of the process plan. A coefficient is introduced for measuring the process plan efficiency. The coefficient also incorporates two weighting factors to reflect the difficulty of manufacturing operations and number of dimensional tolerances involved. To facilitate the identification of the machining operations and the machined surfaces, which are related to the unnecessarily tight resultant tolerances caused by the process plan, a rooted tree representation of the tolerance chart is introduced, and its use is demonstrated. An example is presented to illustrate the new method. This research introduces a new quantitative process plan evaluation method that may lead to the optimization of process plans.

Making Semiconductor Production Plan using the past marketing pattern reference (과거의 판매자료 패턴에 근거한 반도체 생산 계획의 수립)

  • Park, Dong-Sik;Han, Young-Shin;Lee, Chil-Gee
    • Journal of the Korea Society for Simulation
    • /
    • v.14 no.3
    • /
    • pp.1-12
    • /
    • 2005
  • Designing a production and equipment investment plan for semiconductors, many variables must be taken into account. However, depending on these variables could bring many changes to the plans, and the end result is hard to predict. Because it's hard to predict the end result, it's never easy to make a standard production plan. So, the goal of this project is to design a production plan based on past marketing patterns to satisfyall the variables and come up with a reasonable thesis on a standardized process.

  • PDF

The Study on NCS Development for the Production of Hanbok (한복생산 분야의 국가직무능력표준 개발에 관한 연구)

  • Suh, Seunghee;Kim, Jung-Sook
    • Journal of the Korean Society of Costume
    • /
    • v.65 no.2
    • /
    • pp.62-74
    • /
    • 2015
  • The purpose of this research is to analyse the process of development and verification of 'National Competency Standards' of Hanbok production, which was carried out in 2013 for the fashion industry. As the result of this research, the definition of the duty in Hanbok production is 'to conduct a series of step-by-step processes of planning and developing fabric and design, then making pattern, cutting fabric and sewing.' The competency unit for Hanbok production is analyzed in 10 categories: analysis of market trends, design plan, production and manipulation of fabric, production process plan, sample making, pattern making, cutting out, sewing, finishing sewing, inspection of the product quality. Competency unit elements of each competency unit are as follows. 1) analysis of market trends: to research market trend resources, to analyse consumers' buying trend, to analyse industry changes, 2) design plan: to develop design, to plan fabrication, to draw flats, 3) production and manipulation of fabric: to develop fabric planning, to prepare fabric manipulation, to conduct fabric manipulation, 4) production process plan: to grasp design, to plan sewing method, to prepare a specification sheet, 5) sample making: to make a sample pattern, to cut sample fabrics, to sew sample, to finish sample making, 6) pattern making: to measure body, to make production pattern, to adjust production pattern, 7) cutting out: to care fabrics, to lay out patterns, to cut out fabrics, 8) sewing: to sew a garment, to sew a lining, to attach a lining, 9) finishing sewing: to neaten edges, to attach trims, to press to finish, 10) inspection of the product quality: to confirm correspondence with the specification sheet, to inspect appearance.

Knowledge-based Decision Support System for Process Planning in the Electric Motor Manufacturing (전동기 제조업의 지식기반 공정계획 지원시스템에 관한 연구)

  • Song, Jung-Su;Kim, Jae-Gyun;Lee, Jae-Man
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.159-176
    • /
    • 1998
  • In the motor manufacturing system with the properties of short delivery and order based production, the process plan is performed individually for each order by the expert of process plan after the completion of the detail design process to satisfy the specification to be required by customer. Also it is hard to establish the standard process plan in reality because part routings and operation times are varied for each order. Hence, the production planner has the problem that is hard to establish the production schedule releasing the job to the factory because there occurs the big difference between the real time to be completed the process plan and the time to be required by the production planner. In this paper, we study the decision supporting system for the process plan based on knowledge base concept. First, we represent the knowledge of process planner as a database model through the modified POI-Feature graph. Then we design and implement the decision supporting system imbedded in the heuristic algorithm in the client/server environment using the ORACLE relational database management system.

  • PDF

The Study on Decline Plan of Primary Production Organic Matter of Uiam Lake Basin (의암호 유역에서 발생하는 자체생산 유기물 저감방안에 관한 연구)

  • 허인량;이건호;함광준;최지용;정의호
    • Journal of Environmental Health Sciences
    • /
    • v.30 no.1
    • /
    • pp.50-58
    • /
    • 2004
  • The present study was designed to evaluate primary production organic matter in basin of lake around by execution of total maximum daily loading. BOD influent loading of Uiam lake was 2,819 kg/day, which was less then 28.3 percent, total effuluent loading as 3,619 kg/day, in comparision with BOD, total nitrogen influent loading was 4,681 kg/day, which was less then 10.0 percent, total effuluent loading as 5,150 kg/day. But in case of total phosphors influent loading was 73.3 kg/day, which was more then 34.2 percent, total run off loading as 48.3 kg/day. The result of survey reduction plan of primary production organic matter in basin of lake around which objectives of abstract is as follows. First plan was reduction of primary production organic matter by moving the outlet of municipal wastewater treatment center from present place to lake downstream. Secondary plan was improvement by diffusion type of outlet municipal wastewater treatment center. The third plan was reduction of environmental impact by passing and storing of municipal wastewater. Finally plan was decline water surface level which was present hydrouric retention time was reduction from 7.6 day to 6.0 day per meter.

A Computation Model of the Quantity Supplied to Optimize Inventory Costs for Fast Fashion Industry (패스트 패션의 재고비용 최적화를 위한 상품공급 물량 산정 모델)

  • Park, Hyun-Sung;Park, Kwang-Ho;Kim, Tai-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.1
    • /
    • pp.66-78
    • /
    • 2012
  • This paper proposes a computation model of the quantity supplied to optimize inventory costs for the fast fashion. The model is based on a forecasting, a store and production capacity, an assortment planning and quick response model for fast fashion retailers, respectively. It is critical to develop a standardized business process and mathematical model to respond market trends and customer requirements in the fast fashion industry. Thus, we define a product supply model that consists of forecasting, assortment plan, store capacity plan based on the visual merchandising, and production capacity plan considering quick response of the fast fashion retailers. For the forecasting, the decomposition method and multiple regression model are applied. In order to optimize inventory costs. A heuristic algorithm for the quantity supplied is designed based on the assortment plan, store capacity plan and production capacity plan. It is shown that the heuristic algorithm produces a feasible solution which outperforms the average inventory cost of a global fast fashion company.

An Exploratory Study on Determining Optimal Fishing Effort and Production Levels of Danish Seine Fishery under the Sandfish Stock Rebuilding Plan (도루묵 수산자원회복계획 하에서 동해구기선저인망어업의 최적 어획노력량과 어획량 수준 결정에 관한 탐색적 연구)

  • Choi, Jong-Yeol;Kim, Do-Hoon
    • The Journal of Fisheries Business Administration
    • /
    • v.43 no.1
    • /
    • pp.1-9
    • /
    • 2012
  • Based on Clark and Munro's theory of dynamic optimization between fishery resources and production, this study is aimed to take an empirical analysis of optimal production level to the Danish Seine fishery under the sandfish stock rebuilding plan. For empirical analysis, it examined the optimal fish stock size, production and fishing effort levels and it also made an additional evaluation of optimal production changes on main variables by sensitivity analyses. When a 4% of the discount rate is assumed, the optimal sandfish production of Danish Seine fishery would be 3,049 t, and the sandfish optimal stock size is evaluated to be 19,016 t. In addition, the optimal fishing effort is estimated to be 4,368 days. Accordingly, to achieve the optimal production level, current fishing efforts should be reduced while the fish stock size should be increased up to the optimal level.

Development of Scheduling System for Production of the Hydraulic Control Valve of Construction Equipment (건설기계 유압밸브 생산을 위한 일정계획 시스템 개발)

  • Kim, Ki-Dong;Lee, Bo-Hurn
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.61-67
    • /
    • 2007
  • The construction machine is the composite machine assembled by about 30,000 parts. Excavator, one kind of a construction machine, plays the leading role for export of construction equipment. It is generally impossible to produce all of the items within one company. Especially the supply of hydraulic control valves, one of the core part of the construction equipment, depends on the import heavily. So it is important to make an efficient production plan of hydraulic control valves in the company. The most important thing for the production scheduling of a hydraulic control valve is to make production schedule keeping the start date for assembly line for an excavator and to make minimization of the stock level. The production plan of hydraulic control valve includes the decision of the quantity supplied by subcontractor. This paper presents a scheme for a scheduling system of the hydraulic control valve considering the schedule of the assembly line for excavator production. This paper provides a methodology, which can make a plan of supply and production and generate a detailed schedule for daily production.

  • PDF