• 제목/요약/키워드: Process equipment

검색결과 3,203건 처리시간 0.031초

건설중장비 제품개발 초기 단계에서의 라디에이터 진동 설계 (Design for Vibration of Radiator at the Early Stage of Product Development Process in Construction Equipment)

  • 강현석;김성환;강종민
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2011년도 추계학술대회 논문집
    • /
    • pp.271-276
    • /
    • 2011
  • The working conditions of construction equipments such as excavators, wheel loaders and haulers are very tough and severe in fact. To design main components of construction equipment under the severe environment, it's important for engineers to consider design for vibration durability point of view at the early stage of product development process. Radiator as a cooling unit of construction equipment is one of critical components to apply design for vibration. We present a design for vibration process and methodology on the radiator system in construction equipment industries. From the natural frequency and the random vibration analysis based on field vibration test data, we could find current status of radiator layout design to develop and made best layout specification of radiator design to decide for product development process at the early stage.

  • PDF

탈이온수의 압력과 정제된 $N_2$가스가 ILD-CMP 공정에 미치는 영향 (Influence of DI Water Pressure and Purified $N_2$Gas on the Inter Level Dielectric-Chemical Mechanical Polishing Process)

  • 김상용;이우선;서용진;김창일;장의구
    • 한국전기전자재료학회논문지
    • /
    • 제13권10호
    • /
    • pp.812-816
    • /
    • 2000
  • It is very important to understand the correlation of between inter dielectric(ILD) CMP process and various facility factors supplied to equipment to equipment system. In this paper, the correlation between the various facility factors supplied to CMP equipment system and ILD-CMP process was studied. To prevent the partial over-polishing(edge hot-spot) generated in the wafer edge area during polishing, we analyze various facilities supplied at supply system. With facility shortage of D.I water(DIW) pressure, we introduced an adding purified $N_2$(P$N_2$)gas in polishing head cleaning station for increasing a cleaning effect. DIW pressure and P$N_2$gas factors were not related with removal rate, but edge hot-spot of patterned wafer had a serious relation. We estimated two factors (DIW pressure and P$N_2$gas) for the improvement of CMP process. Especially, we obtained a uniform planarity in patterned wafer and prohibited more than 90% wafer edge over-polishing. In this study, we acknowledged that facility factors supplied to equipment system played an important role in ILD-CMP process.

  • PDF

시뮬레이션 기반 배전반 검사장비 교체의 타당성 분석에 관한 사례연구 (A Case Study of Simulation-based Feasibility Analysis of Replacement of Inspection Equipment for Switchboards)

  • 한영진;이도윤;홍준표;주성호;김기민;박재훈
    • 산업경영시스템학회지
    • /
    • 제45권1호
    • /
    • pp.83-90
    • /
    • 2022
  • This study deals with replacement analysis of deteriorated equipment for improving productivity of production system. Frequent breakdown of the deteriorated equipment causes a situation that reduces productivity such as low product quality, process delay, and repair cost. However, the replacement of new equipment will be required a high initial investment cost, so it is important to analysis the economic feasibility. Therefore, we analyze the effect of the production system due to the aging effect of the equipment and the feasibility of equipment replacement based on the economic analysis. The process flow, working time, logistics movement, etc. are analyzed in order to build the simulation modeling for a ship and land switchboard production system. Using numerical examples, the economic feasibility analysis of equipment replacement through replacement of existing deteriorated equipment and additional arrangement of new facilities is performed.

A Study on Automatic Space Analysis for Plant Facilities Based on 3D Octree Argorithm by Using Laser Scanning Information

  • Kim, Donghyun;Kwon, Soonwook;Chung, Suwan;Ko, Hyunglyul
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.667-668
    • /
    • 2015
  • While the plant projects grow bigger and global attention to the plant is increasing, efficient space arrangement is not working in plant project because of the complex structure in installing the equipment unlike the construction project. In addition to this, presently, problem in installation process caused by the disagreement between floor plan and real spot is rising. Therefore the target of this research is to solve the problems and reaction differences, caused by changing the space arrangement in installing the equipment of plant construction. And this research suggests the equipment arrangement method for construction and related processes. To solve the problem, 3D cloud point data of space and equipment is collected by 3D laser scanning and the space matching is operated. In processing the space matching, data is simplified by applying the octree algorithm. This research simplifies the 3D configuration data acquired by 3D scanner equipment through the octree algorithm, and by comparing this data, identifies the space for target equipment, and finally suggests the algorithm that makes the auto space arrangement of equipment possible in construction site and also suggests the process to actualize this algorithm.

  • PDF

Graphic Simulator for Analyzing the Remote Operation of the Advanced Spent Fuel Conditioning Process

  • Song, Tai-Gil;Kim, Sung-Hyun;Lee, Jong-Ryul;Yoon, Ji-Sup
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.1319-1322
    • /
    • 2003
  • KAERI is developing the Advanced Spent Fuel Conditioning Process (ACP) as a pre-disposal treatment process for spent fuel. Equipment used for such a spent fuel recycling and management process must operate in intense radiation fields as well as in a high temperature. Therefore, remote maintenance has a played a significant role in this process because of combined chemical and radiological contamination. Hence suitable remote handling and maintenance technology needs to be developed along with the design of the process concepts. To do this, we developed the graphic simulator for the ACP. The graphic simulator provides the capability of verifying the remote operability of the process without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in the graphic simulator, not in a real environment. The graphic simulator will substantially reduce the cost of the development of the remote handling and maintenance procedure as well as the process equipment, while at the same time producing a process and a remote maintenance concept that is more reliable, easier to implement, and easier to understand.

  • PDF

Smart Factory Big Data를 활용한 공정 이상 탐지 프로세스 적용 사례 연구 (A case study on the application of process abnormal detection process using big data in smart factory)

  • 남현우
    • 응용통계연구
    • /
    • 제34권1호
    • /
    • pp.99-114
    • /
    • 2021
  • 반도체 제조 산업에서는 Big Data에 기초한 Smart Factory 도입과 적용이 가시화되면서 생산 공정의 각 단계에서 수집 가능한 다양한 센서(sensor) 데이터를 활용하여 공정 이상 탐지 및 최종 수율 예측 등에 다양한 분석 방법을 시도하고 있다. 현재 반도체 공정은 원료인 잉곳(ingot)에서 패키징(packaging) 작업 이전의 웨이퍼(wafer) 생산까지 500 600개 이상의 세부 공정과 이와 연계된 수천 개의 계측 공정으로 구성된다. 개별 계측 공정 내의 실제 계측 비율은 대상 제품 대비 0.1%에서 최대 5%를 넘지 못하고 계측 시점별로 일정하게 유지할 수 없다. 이러한 이유로 공정 각 단계의 정상 상태를 간접적으로 판단할 수 있는 장비 센서(sensor) 데이터를 활용하여 관리 여부를 판단하고자 하는 노력이 계속되고 있다. 본 연구에서는 장비 센서 데이터 기반의 공정 이상 탐지 프로세스를 정의하고 현재 적용 되고 있는 기술 통계량 기반 진단 방법의 단점을 보완하기 위해 FDA(Functional Data Analysis)방법을 활용하였다. 실제 현장 사례 데이터에 머신러닝을 이용하여 이상 탐지 정확도 비교를 통해 효과성을 검증하였다.

Development of Heating Table Fabrication Process for the High Speed Curing Composites

  • Kim, Yun-Hae;Ha, Jin-Cheol;Lee, Jin-Woo;Park, Jun-Mu;Han, Joong-Won;Choi, Byung-Keun;Moon, Kyung-Man;Nisitani, Hironobu
    • International Journal of Ocean System Engineering
    • /
    • 제3권1호
    • /
    • pp.38-43
    • /
    • 2013
  • Wind turbine generator is, recently, becoming bigger and bigger. So, in order to produce large amounts of electricity generation, we have to consider the length and thickness of the blade. We investigated the skills of processing for making the super thickness laminate through development fabrication process for high speed curing composite heating table.

A Bridge Transported Bilateral Force-Reflecting Servo-Manipulator for Maintenance of Nuclear Pyroprocessing Equipment

  • Park, B.S.;Jin, J.H.;Ko, B.S.;Lee, J.K.;Yoon, J.S.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.2226-2230
    • /
    • 2005
  • The Advanced Spent Fuel Conditioning Process (ACP), which is a pre-disposal treatment process for spent fuel is being developed at the Korea Atomic Energy Research Institute (KAERI). The ACP equipment is operated in an intense radiation field as well as in a high temperature. Thus, the equipment is designed in consideration of the remote handling and maintenance. This paper describes a Bridge Transported Bilateral Force-Reflecting Servo-Manipulator (BTSM) system, which is being developed to overcome the limitation of access that is a drawback of the mechanical Master-Slave Manipulators (MSMs), which are mounted on the ACP hot cell wall for the operation and the maintenance of the ACP equipment. The BTSM system was manufactured and temporally installed at the mockup to test its performance. The manufactured BTSM system will be installed at the ACP hot cell on June 2005 after the accomplishment of the performance test. The BTSM system consists of four components: a transporter with a telescoping tubeset, a slave manipulator, a master manipulator, and a remote control system. This system will highly increase the volume of coverage for the operation and maintenance of the ACP equipment.

  • PDF

평판 디스플레이 제조 라인의 반복 프로세스 성능 평가를 위한 시뮬레이션 시스템 개발 (Development of Simulation System for Evaluating Performance of the Flat Display Manufacturing Line with Repetitive Process)

  • 이경근;최성길;류시욱
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제17권4호
    • /
    • pp.301-319
    • /
    • 2008
  • The display market has been replaced by the FPD (Flat Panel Display) from the CRT (Cathode-Ray Tube) since the late 1990s. In the FPD production line, the most equipment has high price. Thus, when the equipment has multi-function, the repetitive process is arranged for the equipment. However, such disposition of equipment results in more complicated process flow owing to repetitive operations. This reduces the production capacity and increases lead-time in turn. In this paper, we develop an AutoMod simulation system that derives to information about the quantity, production lead-time, utilities of facilities, and occupation rates of racks. In this simulation system, we consider the situation where the equipment might be broken and suspended randomly. For the developed system, we first evaluate a production plan with current layout and then, propose a revised alternative plan. Using the same simulation scheme, we investigate comparing the production quantity and lead-time with the two plans. In addition, for a proposed alternative, we try to forecast the most adequate rule between the two job dispatching rules which are FOR (Fewest Operation Remaining) and FCFS (First Come First Serve) through simulation.