• Title/Summary/Keyword: Process equipment

Search Result 3,203, Processing Time 0.033 seconds

Implementation of a Virtual Environment for the HLW Disposal Process Analyses (고준위폐기물 처분공정 개념분석을 위한 가상환경 구축)

  • Lee J.Y.;Cho D.K.;Choi H.J.;Kim S.G.;Choi J.W.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1636-1639
    • /
    • 2005
  • The process equipment and remote handling for the deep geological disposal of high-level radioactive waste(HLW) should be checked prior to the operation in view of reliability and operability. In this study, the concept of virtual environment workcell is implemented to analyze and define the feasible disposal process instead of real mock-up, which is very expensive and time consuming. To do this, the parts of process equipment for the disposal and maintenance will be modeled in 3-D graphics, assembled, and kinematics will be assigned. Also, the virtual workcell for the encapsulation and disposal process of spent fuel will be implemented in the graphical environment, which is the same as the real environment. This virtual workcell will have the several functions for verification such as analyses for the equipment's work space, the collision detection, the path planning and graphic simulation of the processes etc. This graphic virtual workcell of the HLW disposal process can be effectively used in designing of the processes for the hot cell equipment and enhance the reliability of the spent fuel management.

  • PDF

Concept of the Encapsulation Process and Equipment for the Spent Fuel Disposal (심지층 처분을 위한 사용후핵연료 포장공정 장비개념 설정)

  • Lee J.Y.;Choi H.J.;Cho D.K.;Kim S.K.;Choi J.W.;Hahn P.S.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.10a
    • /
    • pp.470-473
    • /
    • 2005
  • Spent nuclear fuels are regarded as a high level radioactive waste and they will be disposed in a deep geological repository. To maintain the safety of the repository for hundreds of thousands of years, the spent fuels are encapsulated in a disposal canister and the canister containing spent fuels should have the structural integrity and the corrosion resistance below the several hundreds meters from the ground surface. In this study, the concept of the spent fuel encapsulation process and the process equipment fur deep geological disposal were established. To do this, the design requirements, such as the functions and the spent fuel accumulations, were reviewed. Also, the design principles and the bases were established. Based on the requirements and the bases, the encapsulation process and the equipment from spent fuel receiving process to transferring canister into the underground repository including hot cell processes was established. The established concept of the spent fuel encapsulation process and the process equipment will be improved continuously with the future studies. And this concept can be effectively used in implementing the reference repository system of our own case.

  • PDF

Development of a Prototype Equipment for Road Stripe Removing Using High Pressure Water-Jet (워터젯을 이용한 노면표시 제거장비의 프로토타입 개발)

  • Kim, Kyoon-Tai;Han, Jae-Goo;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.149-158
    • /
    • 2006
  • Current removing process is labor intensive and time consuming, employing a conventional grinding type manual machine. This manual tasks trigger various dangers such as unexpected traffic accidents or explosions of propane gas used for finalizing removing process, leading to health damage and environment pollution by dusts and noxious gases. Accordingly, it is necessity for the development of new alternative equipment. In this paper, we have developed a prototype equipment for road stripe removing made up with a high-pressure water-jet system as a mobile type system. The following shows the results. First, an analysis of the current road stripe removal process showed that it can be divided into a) preparation, b) removal and c) ground finishing. It also showed that the b) removal process requires equipment which can cover the whole process. Second, the study compared between the productivity of the developed equipment and conventional methods, and it obtained 280% productivity improvement compared to the conventional equipment.

An Empirical Study on Manufacturing Process Mining of Smart Factory (스마트 팩토리의 제조 프로세스 마이닝에 관한 실증 연구)

  • Taesung, Kim
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.4
    • /
    • pp.149-156
    • /
    • 2022
  • Manufacturing process mining performs various data analyzes of performance on event logs that record production. That is, it analyzes the event log data accumulated in the information system and extracts useful information necessary for business execution. Process data analysis by process mining analyzes actual data extracted from manufacturing execution systems (MES) to enable accurate manufacturing process analysis. In order to continuously manage and improve manufacturing and manufacturing processes, there is a need to structure, monitor and analyze the processes, but there is a lack of suitable technology to use. The purpose of this research is to propose a manufacturing process analysis method using process mining and to establish a manufacturing process mining system by analyzing empirical data. In this research, the manufacturing process was analyzed by process mining technology using transaction data extracted from MES. A relationship model of the manufacturing process and equipment was derived, and various performance analyzes were performed on the derived process model from the viewpoint of work, equipment, and time. The results of this analysis are highly effective in shortening process lead times (bottleneck analysis, time analysis), improving productivity (throughput analysis), and reducing costs (equipment analysis).

Development of Process and Equipment for Roll-to-Roll convergence printing technology

  • Kim, Dong-Su;Bae, Seong-U;Kim, Chung-Hwan
    • Proceedings of the Materials Research Society of Korea Conference
    • /
    • 2010.05a
    • /
    • pp.19.1-19.1
    • /
    • 2010
  • The process of manufacturing printed electronics using printing technology is attracting attention because its process cost is lower than that of the conventional semiconductor process. This technology, which offers both a lower cost and higher productivity, can be applied in the production of organic TFT (thin film transistor), solar cell, RFID(radio frequency identification) tag, printed battery, E-paper, touch screen panel, black matrix for LCD(liquid crystal display), flexible display, and so forth. In general, in order to implement printed electronics, narrow width and gap printing, registration of multi-layer printing by several printing units, and printing accuracy of under $20\;{\mu}m$ are all required. These electronic products require high precision to the degree of tens of microns - in a large area with flexible material, and mass productivity at low cost. As such, the roll-to-roll printing process is attracting attention as a mass production system for these printed electronic devices. For the commercialization of this process, two basic electronic ink technologies, such as conductive ink and polymers, and printing equipment have to be developed. Therefore, this paper addressed basis design and test to develop fine patterning equipment employing the roll-to-roll printing equipment and electronic ink.

  • PDF

A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment

  • Shin, Tae-Hong;Yoon, Su-Won;Chin, Sangyoon
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.11-19
    • /
    • 2012
  • Construction supply chain management (CSCM) has become one of the critical factors that determine the success of a construction project as it becomes increasingly complicated and mega-sized. Particularly for high-rise or mega-sized building construction, just-in-time supply chain management is required due to lack of storage space and effective logistics for construction components and materials at a construction site. Despite the fact that research and development of radio frequency identification (RFID) and wireless sensor network (WSN) technology have been performed, construction project managers still need to carry mobile devices and check material and component flow at each stage of the supply chain process. This research proposes that the equipment used in the construction supply chain process, such as movers, trailers, gates, and hoists, can become main actors in the supply chain process using RFID and WSN technologies. And the proposed equipment and process focused on a solution to the redundancy identification problem, which has been observed in operations that use RFID/WSN-based processes for construction logistics. This paper also presents issues identified through verification and validation of the research results and proposes further studies.

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

Application of Reliability Growth Management for Construction Equipment Development Process (건설장비 개발과정에서 신뢰성성장관리 적용방법에 대한 연구)

  • So, Young-Kug;Jeon, Young-Rok;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.13 no.3
    • /
    • pp.175-190
    • /
    • 2013
  • This study considers reliability growth management as the excellent method for construction equipment development with the effect on decreasing COPQ(Cost of Poor Quality Cost) of new products. MIL-HDBK-189A(1981) and RADC-TR-84-20(1984) standards provide a general concept of reliability growth management including to reliability growth test, models and FRACAS(Failure Reporting and Corrective Action System). There is no study how to apply reliability growth management to construction equipment(or machine) development. This paper propose the method to apply it to construction equipment development process from the reliability target setting for developing products to launching them at market. It is expecially showing how to set target reliability for new developing equipment and the development risk to reach the reliability target in detail.