• Title/Summary/Keyword: Process change point

Search Result 684, Processing Time 0.032 seconds

A Study on the Dynamic Analysis of Recliner Gear for Vehicle Power Seats (차량용 시트 리클라이너 기어의 동적 해석)

  • Kim, Sung-Yuk;Lee, Jung-Bin;Kim, Key-Sun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.16 no.6
    • /
    • pp.15-20
    • /
    • 2017
  • This study analyzed the load change of the gear generated by the operation of the vehicle recliner through Finite Element Analysis. The basic model of the recliner used was a commercial product, and the effect of the seat frame was excluded. The load conditions applied to the recliner were set considering gravity, the mass of the seat's back frame, and the weight of a person. The operating mode was set to move the seat back from the vertical to the reclined position. As a result, it was found that the tooth bending amount of the gear rim and wheel increased from the cam rotation angle of 450 degrees, and a change in the contact ratio occurred. Furthermore, excessive torque fluctuations occurred in the ranges of 390 to 450 and 750 to 710 degrees. It was found that this occurred in the region of about 30 degrees before and after the point where the x-axis direction load is larger than the y-direction load. From this torque fluctuation it was determined to likely to cause chattering noise.

A RESEARCH ON SEAMLESS PLATFORM CHANGE OF REACTOR PROTECTION SYSTEM FROM PLC TO FPGA

  • Yoo, Junbeom;Lee, Jong-Hoon;Lee, Jang-Soo
    • Nuclear Engineering and Technology
    • /
    • v.45 no.4
    • /
    • pp.477-488
    • /
    • 2013
  • The PLC (Programmable Logic Controller) has been widely used to implement real-time controllers in nuclear RPSs (Reactor Protection Systems). Increasing complexity and maintenance cost, however, are now demanding more powerful and cost-effective implementation such as FPGA (Field-Programmable Gate Array). Abandoning all experience and knowledge accumulated over the decades and starting an all-new development approach is too risky for such safety-critical systems. This paper proposes an RPS software development process with a platform change from PLC to FPGA, while retaining all outputs from the established development. This paper transforms FBD designs of the PLC-based software development into a behaviorally-equivalent Verilog program, which is a starting point of a typical FPGA-based hardware development. We expect that the proposed software development process can bridge the gap between two software developing approaches with different platforms, such as PLC and FPGA. This paper also demonstrates its effectiveness using an example of a prototype version of a real-world RPS in Korea.

Contents Change Aspect on Fixing Process of Local Festival Case of the Yeongsangang Culture Festival in Naju (지역축제 정착화 과정에서의 콘텐츠 변화양상 -나주 영산강문화축제 사례를 중심으로-)

  • Lim, Eun-Mi
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.12
    • /
    • pp.438-447
    • /
    • 2009
  • Korean local festival had grown rapidly quantitatively and qualitatively for past 10 year. And also problems of domestic local festival had been indicated much by specialists and researchers who plan festival. But most precedent researches are stopping in problem presentation that is based in one point of time. In the meantime, most the very best culture tourism festivals are meeting fixing step through trial and error in historic process more than 10 years. It is important to solve fundamental problem that understand process so much. This research analyzed festival contents change aspect on fixing process as local representative festival by time-series analys, Yeongsangang culture festival to example. By the result, the biggest problem is that unclearness of festival subject by wide festival theme establishment is connected by losing festival's identity.

Sedimentary Environment Change in Mid-channel Bar of the Lower Geum River Using Multi-temporal Satellite Data (다중시기 영상자료를 이용한 금강하류의 하중도 퇴적환경 변화)

  • Hong, Ki-Byung;Jang, Dong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.3
    • /
    • pp.171-183
    • /
    • 2009
  • This study aims to analyze the sedimentary environment change in mid-channel bar of the lower Geum river basin after the construction of the estuary barrage using multi-temporal satellite data and GIS. The sedimentary environment changes were observed in mid-channel bar areas. The mid-channel bar F was found to have been newly formed for 10 years(1996-2006), whereas the mid-channel bar B located between mid-channel bar A and C has disappeared by erosion during the same periods. When examined by section, the areas of the mid-channel bar in the upper stream section from the Yipo's reference point generally increased due to the prevailing sedimentary environments, and those of the downstream section decreased where corrosive environments are dominant. In ternms of the centroid movement, the mid-channel bars grew up toward the downstream by switching erosion and accumulation, as sedimentation was prevailing in the downstream area of mid-channel bars and corrosion was dominant in the upper stream. Through grain size analysis, the study areas are divided into three sections according to the average grain size. In Section I, the mid-channel bars were formed as a result of sedimentary process of tides in the past. In Section II, the mid-channel bars were formed partly through the sedimentary process of rivers although the sedimentary process of tides is prevailing. In Section III, the mid-channel bars were formed mainly through the sedimentary process of rivers, even if it showed the sedimentary process of tides in the past.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

An experimental study of heat transfer with $Na_4P_2O_7{\cdot}10H_2O$ as P.C.M. ($Na_4P_2O_7{\cdot}10H_2O$의 축열방열시 열전달 특성에 관한 실험적 연구)

  • Lee, C.M.;Yim, C.S.
    • Solar Energy
    • /
    • v.9 no.1
    • /
    • pp.70-77
    • /
    • 1989
  • Sodium pyrophosphate that melting point is $79-80^{\circ}C$ have been Studied on heat storage and heat discharge. In heat storage process, sodium pyrophosphate was kept up initial temperature $50^{\circ}C,\;60^{\circ}C,\;70^{\circ}C$ which melt by heated water at temperature $85^{\circ}C,\;90^{\circ}C,\;95^{\circ}C$. In heat discharge process, initial temperature of sodium pyrophosphate was maintained at temperature $85^{\circ}C,\;90^{\circ}C,\;95^{\circ}C$ which varied cooling temperature $50^{\circ}C,\;60^{\circ}C,\;70^{\circ}C$. The experiment has been reached conclusions as follows. 1) Heat transfer properties of phase change material is controlled by conduction during heating and cooling process. 2) The temperature increased rapidly at initial stage and transient region increase slowly because of characteristic of latent heat. 3) The lower cooling water temperature is the less the time that get to thermal equivalent state take during discharge process. 4) The higher cooling water temperature is the less temperature difference between top and bottom in P.C.M during discharge process.

  • PDF

CONSTRUCTABILITY IMPLEMENTATION MODEL USING DEPENDENCY STRUCTURE MATRIX

  • Youngjib Ham;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.550-555
    • /
    • 2011
  • Utilizing construction knowledge and experiences in design phase can reduce change orders and improve productivity in construction phase. To do so, information must be made available to the design team in time. Current approaches for effective utilization of constructability knowledge, however, only focus on the formalization of constructability knowledge such as a checklist, which lacks the consideration of the appropriate use at the proper point in time. The inadequate use of constructability knowledge can result in unnecessary reworks. To deal with this problem, the design team needs to know what constructability knowledge is required for specific design activities in the design process. This paper presents a constructability implementation model using the dependency structure matrix (DSM) that focuses on information flows between design activities and constructability knowledge. For this objective, design activities in the design process are modeled in a matrix form based on their dependency. Then, constructability knowledge, which needs to be considered in the design stage, is mapped into activities and incorporated into the matrix, creating Constructability-DSM (C-DSM). Next, the partitioning algorithm is applied to C-DSM for optimal information flow. The Partitioned C-DSM is then analyzed based on the relationship between activities. Finally, the optimal utilization of construction knowledge in the design process is determined by identifying what constructability knowledge is required for each design activity, and how and when it is reflected to design for constructability. Thus, this research can help provide robust control actions to reduce unnecessary iterative cycles in design process for efficient constructability implementation.

  • PDF

Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(II) (장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(II))

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.248-259
    • /
    • 2010
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces one example of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. The characteristics of ground deformation and strut axial force change, the measured data obtained during construction process, were analysed, the effects of relatively deeper excavation than the specification on one excavation side and rapid drawdown of ground water level on the other excavation side were deeply investigated from the viewpoint of mutual influences between ground deformations of both excavation sides and strut axial force changes. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Improved Hierarchical Prefix Delegation Protocol for route optimization in nested NEMO (중첩된 NEMO에서의 경로 최적화를 위한 개선된 계층적 프리픽스 할당 프로토콜)

  • Rho Toung-Taeg
    • Journal of the Korea Society of Computer and Information
    • /
    • v.10 no.5 s.37
    • /
    • pp.227-236
    • /
    • 2005
  • Hierarchical Prefix Delegation (HPD) protocol refers to a type of solution to problems inherent in non-optimal routing which occurs with Network Mobility (NEMO) basic solution. However, because HPD cannot improve the micro-mobility Problems, Problem surfaces each time Mobile Network Node (MNN) changes the attachment point; as happens also in a Mobile IPv6 (MIPv6) protocol in sen야ng Binding Update (BU) messages to Home Agent (HA) / Correspondent Nodes(CNs) By applying Hierarchical Mobile IPv6 protocol concept to HPD, this study Proposes an algorithm for effectively handling micro-mobility problems which occur with HPD in a nested NEMO environment. By sending BU only to nearby Mobility Anchor Point(MAP) during MNN location change within a MAP's domain, the proposed protocol will alleviate service disruption delays and signaling loads during the handover process, overcoming the limitations of HPD.

  • PDF

Improved Hierarchical Prefix Delegation Protocol for route optimization in nested NEMO (중첩된 NEMO에서의 경로 최적화를 위한 개선된 계층적 프리픽스 할당 프로토콜)

  • Rho, Kyung-Taeg
    • Journal of the Korea Society of Computer and Information
    • /
    • v.11 no.1 s.39
    • /
    • pp.147-155
    • /
    • 2006
  • Hierarchical Prefix Delegation (HPD) protocol refers to a type of solution to problems inherent in non-optimal routing which occurs with Network Mobility (NEMO) basic solution. However, because HPD cannot improve the micro-mobility problems, problem surfaces each time Mobile Network Node (MNN) changes the attachment point; as happens also in a Mobile IPv6 (MIPv6) protocol in sending Binding Update (BU) messages to Home Agent (HA) / Correspondent Nodes(CNs). By applying Hierarchical Mobile IPv6 protocol concept to HPD, this study proposes an algorithm for effectively handling micro-mobility problems which occur with HPD in a nested NEMO environment. By sending BU only to nearby Mobility Anchor Point(MAP) during MNN location change within a MAP's domain, the proposed protocol will alleviate service disruption delays and signaling loads during the handover process, overcoming the limitations of HPD.

  • PDF