The application of a process view, as complement to the traditional functional division, is often a way to highlight organisational improvement potential. This paper examines the process of providing university level education in quality management, using Sweden as an example. The purpose is to assess the performance of university education as part of the supply chain of providing quality management to a society. This has been done by studying the actual offering compared to a notional benchmark of best performance. Preliminary results indicate that there could be a significant improvement potential in both providing more education of the right type and in the right way. A lot of similar basic courses are given but with varying names, possibly reflecting difficulties in defining the area of quality management and its constituents. An important reason for the detected improvement potential seems to be the lack of ownership of the studied supply chain of providing university level quality education to the Swedish society.
This paper investigates the relation between the Process capability index(PCI) and the quality assurance level under various conditions. The effect of the off-targetness of the process mean, deviation from the nomality, the estimation error, and tile measurement error on the quality assurance level is evaluated. Various distributions such as the Student-t, the chi-square, the gamma, the Weibull, and the log-normal distributions are considered to evaluate the deviation from the nomality. The quality levels under abnormal conditions turn out to be severely different from that under the standard condition. We provide tables and graphs of the quality assurance level on various abnormal conditions. In order for the industry users to use the PCI properly, they should refer to the tables and graphs, especially when they are not certain about the standard assumptions on which the PCI depends.
In this paper, we consider the quality problem of black oxide process in casting for which Taguchi method is used. We explain simply the Taguchi method and existing problems in Black Oxide process. We analyze the problem by the quality improvement procedure proposed by Taguchi. The design factors and noises using cause-effect diagram are found, the experiment is made using orthogonal array. After ANOVA, the critical factors are determined and the optimal process condition is designed. After parameter design, we derive the tolerance levels. As a result of changing the levels of process parameters, the variance of quality characteristic was decreased by quarter and the average value was also decreased by half. We estimated the predictable profit of the improvement.
This paper presents a six sigma project for improving gate painting quality in a medium-sized automotive part company. The project follows a disciplined process of five macro phases: Define, Measure, Analyze, Improve, and Control. A CTQ(critical to quality) is determined based on COPQ(cost of poor quality) analysis, and a process map is utilized for identifying process input variables. Three KPIV s(key process input variable) are selected; Painting Temperature, Painting Quantity, and Painting Viscosity, and DOE(design of experiments) is utilized for finding the optimal process conditions for three KPIVs. MINITAB software is used for data analyses and DOE. The sigma level of defects rate has improved from 2.93 to 3.66.
Kim, Jong-Guk;Kim, Kil-Hwan;Son, Chul-Min;Kim, Chang-Eun
Journal of the Korea Safety Management & Science
/
v.13
no.4
/
pp.153-160
/
2011
This thesis introduced a model of diagnosing a company's quality management, and a process of achieving quality innovation based on the model. As for study methods, books and theses related to quality and process innovation were collected for investigation, a survey on internal employees to investigate major issues of quality and standard consciousness was conducted, and 5DP was discussed for balanced process analysis.
Kim, Sang-Kuk;Shin, Sung-Ho;Lee, Young-Sei;Chung, Taek-Young
Journal of Korean Society for Quality Management
/
v.33
no.2
/
pp.13-21
/
2005
Most organizations adopt a process-based approach to manage their operations and now business process management(BPM) is a well-established concept. Because ISO 9001:2000 has been influenced by BPR and it also emphasizes process based, BPM can get together with ISO 9001:2000. Korea Institute of Science and Technology Information has taken ISO 9001:2000 certificate in November 11, 2003 and now implements quality management systems based on BPMS. We call it KQMS(KISTI Quality Management System). KQMS based on BPMS is a new example in field of ISO quality management and is expected to support process management well.
Journal of the Korean Society for Precision Engineering
/
v.11
no.2
/
pp.189-196
/
1994
Quality assurance in the process of manufacturing high strengh bolt sets used in the frictional joints of structures in one of important concern to users as well as to manufactures. In case of occurrences of either defective or low-quality products, even if they are quite rare, some systematic means of localizing the cause-characteristics and matching to corresponding production process is necessary. Control chart of torque factor is the primary indicatir in finding defectiveness of the products. Use of correlation diagrams ofnhardness of the bolt set presents in part a way of screening the cause. Retest data of the bolt set provide additional ideas of localizing the cause, for which theoretical background is presented in this regard. A process-characteristics matrix relating the causes of low quality to the corresponding process of manufacturing, which is of prime importance for the feedback control of production, is also proposed. Finally general features of control to assure quality of the set is described.
Journal of the Korean Society for Precision Engineering
/
v.13
no.12
/
pp.63-69
/
1996
As the significance of quality in the sense of customer satisfaction is growing, the management of quality becomes one of the main interests in the manufacturing systems research. This paper presents the concept of quality-driven CIM(Computer Integrated Manufacturing) system which is composed of a business process domain and a quality domain. In the business process domain, business functions are integrated by conventional design and manufacturing databases on the one hand, and an integrated quality system is interlinked to them via several quality modules on the other hand. Quality information model connects the business process domain with the quality domain where various types of quality data are stored in the form of quality database. This framework helps a manufacturing enterprise to implement the quality-driven CIM system to achieve its final objective "customer satisfaction".ion".uot;.
Journal of the Korean Data and Information Science Society
/
v.19
no.2
/
pp.609-620
/
2008
There may be several parallel equipments having the same function in a multi-stage manufacturing process, which affect the product quality differently and have significant differences in defect rate. The product quality may depend on what equipments it has been processed as well as what process variable values it has. Applying one model ignoring the presence of different equipments may distort the prediction of defect rate and the identification of important quality variables affecting the defect rate. We propose a procedure for data segmentation when constructing models for predicting the defect rate or for identifying major process variables influencing product quality. The proposed procedure is based on the principal component analysis and the analysis of variance, which demonstrates a better performance in predicting defect rate through a case study with a PDP manufacturing process.
This study aims to establish the quality checking factors for the construction process of digital topographic map. Total 17 regulations related to quality of digital topographic map and major aerial survey firms are analyzed in terms of working process, equipments, and accuracy of results. It is standardized the process of making new digital maps using aerial photography, revising existing digital maps, and digitizing paper map. Quality checking factors for the construction process of digital topographic map are also established.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.