• 제목/요약/키워드: Procedure time

검색결과 5,432건 처리시간 0.031초

A tension stiffening model for analysis of RC flexural members under service load

  • Patel, K.A.;Chaudhary, Sandeep;Nagpal, A.K.
    • Computers and Concrete
    • /
    • 제17권1호
    • /
    • pp.29-51
    • /
    • 2016
  • Tension-stiffening is the contribution of concrete between the cracks to carry tensile stresses after cracking in Reinforced Concrete (RC) members. In this paper, a tension-stiffening model has been proposed for computationally efficient nonlinear analysis of RC flexural members subjected to service load. The proposed model has been embedded in a typical cracked span length beam element. The element is visualized to consist of at the most five zones (cracked or uncracked). Closed form expressions for flexibility and stiffness coefficients and end displacements have been obtained for the cracked span length beam element. Further, for use in everyday design, a hybrid analytical-numerical procedure has been developed for nonlinear analysis of RC flexural members using the proposed tension-stiffening model. The procedure yields deflections as well as redistributed bending moments. The proposed model (and developed procedure) has been validated by the comparison with experimental results reported elsewhere and also by comparison with the Finite Element Method (FEM) results. The procedure would lead to drastic reduction in computational time in case of large RC structures.

규격화된 분전반 제작을 위한 표준작업절차(SOP)의 공정 개발 (Process Development of a Standard Operating Procedure (SOP) for the Manufacturing of Standardized Distribution Boards)

  • 고완수;이병설;최충석
    • 한국안전학회지
    • /
    • 제33권5호
    • /
    • pp.21-27
    • /
    • 2018
  • The purpose of this study is to develop a SOP (Standard Operating Procedure) for a distribution board that can monitor the leakage current of a load distribution line in real time. The developed distribution board was fabricated by applying IEC 61439-1. It consists of the distribution board and an alarm device. The work process for making the distribution board was compliant with the KEMC (Korea Electrical Manufacturers Cooperative) regulations. And the AC distribution board range is 1,000 V. In addition, the voltage in DC is less than 1500 V. The distribution board receives a 3-phases and 4-wires power supply system and can supply power to the load of a maximum of 32 single or three phase distribution circuits. Also, leakage current measured on the power distribution board was used by sensors installed. The SOP of the developed distribution board consists of the installation standards for the short circuit alarm device and sensor, the surge protection device, switches and indication lamps, and other devices. The operation procedure was prepared so that each manufacturing step of the distribution board must be confirmed by the persons in charge of preparation, production, quality control and approval before moving forward to the next step.

환자의 프로세스 로그 정보를 이용한 진단 분석 (Diagnosis Analysis of Patient Process Log Data)

  • 배준수
    • 산업경영시스템학회지
    • /
    • 제42권4호
    • /
    • pp.126-134
    • /
    • 2019
  • Nowadays, since there are so many big data available everywhere, those big data can be used to find useful information to improve design and operation by using various analysis methods such as data mining. Especially if we have event log data that has execution history data of an organization such as case_id, event_time, event (activity), performer, etc., then we can apply process mining to discover the main process model in the organization. Once we can find the main process from process mining, we can utilize it to improve current working environment. In this paper we developed a new method to find a final diagnosis of a patient, who needs several procedures (medical test and examination) to diagnose disease of the patient by using process mining approach. Some patients can be diagnosed by only one procedure, but there are certainly some patients who are very difficult to diagnose and need to take several procedures to find exact disease name. We used 2 million procedure log data and there are 397 thousands patients who took 2 and more procedures to find a final disease. These multi-procedure patients are not frequent case, but it is very critical to prevent wrong diagnosis. From those multi-procedure taken patients, 4 procedures were discovered to be a main process model in the hospital. Using this main process model, we can understand the sequence of procedures in the hospital and furthermore the relationship between diagnosis and corresponding procedures.

Extracardiac Conduit Fontan Operation with Reduction Aortoplasty for Left Pulmonary Artery Compression after a Norwood Procedure in a Patient with Double-Inlet Left Ventricle

  • Song, Jae Won;Kim, Woong Han;Kwak, Jae Gun;Park, Ji Young
    • Journal of Chest Surgery
    • /
    • 제51권1호
    • /
    • pp.53-56
    • /
    • 2018
  • Patients with double-inlet left ventricle usually have a small ascending aorta. In the Norwood procedure, which involves a staged operation, a neoaorta is constructed with a homograft, and the pulmonary artery plays a role in the systemic circulation. Dilatation or aneurysmal changes can occur over time due to the exposure of the neoaorta to systemic pressure, which may induce adverse effects on adj acent structures. We report a rare case of surgical repair for neoaortic root dilataiton with aortic regurgitation, compressing the left pulmohary artery, in a patient who underwent the Norwood procedure.

Hirschsprung 병에서 Transanal One-Stage Pull-Through 술식의 단기 성적 (Short-Term Outcomes of Transanal One-Stage Pull-Through Procedure for Hirschsprung's Disease)

  • 손경모;김해영
    • Advances in pediatric surgery
    • /
    • 제7권2호
    • /
    • pp.130-136
    • /
    • 2001
  • The aim of this study was to evaluate the short-term outcomes of the trans anal one-stage pull-through procedure(TOP) in Hirschsprung's disease. Eight patients aged 3 weeks to 8 months with Hirschsprung's disease underwent this procedure. A rectal mucosectomy was performed from just proximal to dentate line to the level of peritoneal reflexion, where muscle layer was incised circumferentially. Rectosigmoid was mobilized out through the anus, and full-thickness frozen biopsy was taken for confirmation of ganglionic cells. After the rectal muscular cuff was divided longitudinally in the posterior aspect, aganglionic bowel was removed and ganglionic colon was anastomozed to the anus. The mean operating time was 161 minutes, and the mean hospital stay after operation was 3.8 days. Five patients had three to four bowel movement per day without other therapy at mean postoperative 39.2 days. Although long-term follow-up will be required, the TOP might be the new alternative surgical procedure for Hirschsprung's disease.

  • PDF

Defection Detection Analysis Based on Time-Dependent Data

  • Song, Hee-Seok;Kim, Jae-Kyeong;Chae, Kyung-Hee
    • 한국지능정보시스템학회:학술대회논문집
    • /
    • 한국지능정보시스템학회 2002년도 추계정기학술대회
    • /
    • pp.445-453
    • /
    • 2002
  • Past and current customer behavior is the best predicator of future customer behavior. This paper introduces a procedure on personalized defection detection and prevention for an online game site. The basic idea for our defection detection and prevention is adopted from the observation that potential defectors have a tendency to take a couple of months or weeks to gradually change their behavior (i.e. trim-out their usage volume) before their eventual withdrawal. For this purpose, we suggest a SOM (Self-Organizing Map) based procedure to determine the possible states of customer behavior from past behavior data. Based on this representation of the state of behavior, potential defectors are detected by comparing their monitored trajectories of behavior states with frequent and confident trajectories of past defectors. The key feature of this study includes a defection prevention procedure which recommends the desirable behavior state for the ext period so as to lower the likelihood of defection. The defection prevention procedure can be used to design a marketing campaign on an individual basis because it provides desirable behavior patterns for the next period. The experiments demonstrate that our approach is effective for defection prevention and efficient for defection detection because it predicts potential defectors without deterioration of prediction accuracy compared to that of the MLP (Multi-Layer Perceptron) neural network.

  • PDF

An extension of an improved forced based design procedure for 3D steel structures

  • Peres, R.;Castro, J.M.;Bento, R.
    • Steel and Composite Structures
    • /
    • 제22권5호
    • /
    • pp.1115-1140
    • /
    • 2016
  • This paper proposes an extension of the Improved Forced Based Design procedure to 3D steel structures. The Improved Forced Based Design (IFBD) procedure consists of a more rational sequence of the design checks proposed in Eurocode 8 and involves a more realistic selection of the behaviour factor instead of selecting an empirical value based on the ductility class and lateral resisting system adopted. The design procedure was tested on a group of four 3D steel structures, composed by moment-resisting frames with three storeys height and the same plan configuration in all storeys. The plan configuration was defined in order to target lateral restrained or unrestrained systems as well as plan regular or irregular structures. The same group of structures was also designed according to the force-based process prescribed in Eurocode 8. The member sizes obtained through the two approaches were compared and the seismic performance was assessed through nonlinear static and time-history analyses. The limit states referred to structural and non-structural damage, considering the two levels design approach, which are the serviceability and the ultimate limit states, were examined. The results obtained reveal that the IFBD leads to more economical structures that still comply with the performance requirements prescribed in Eurocode 8.

ARIMA(0,1,1)모형에서 통계적 공정탐색절차의 MARKOV연쇄 표현 (A Markov Chain Representation of Statistical Process Monitoring Procedure under an ARIMA(0,1,1) Model)

  • 박창순
    • 응용통계연구
    • /
    • 제16권1호
    • /
    • pp.71-85
    • /
    • 2003
  • 일정 시간간격으로 품질을 측정하는 공정관리절차의 경제적 설계에서는 그 특성의 규명이 측정시점의 이산성 (discreteness) 때문에 복잡하고 어렵다. 이 논문에서는 공정 탐색 절차를 Markov 연쇄(chain)로 표현하는 과정을 개발하였고, 공정분포가 공정주기 내에서 발생하는 잡음과 이상원인의 효과를 설명할 수 있는 ARIMA(0,1,1) 모형을 따를 때에 Markov 연쇄의 표현을 이용하여 공정탐색절차의 특성을 도출하였다. Markov 연쇄의 특성은 전이행렬에 따라 달라지며, 전이행렬은 관리절차와 공정분포에 의해 결정된다. 이 논문에서 도출된 Markov 연쇄의 표현은 많은 다른 형태의 관리절차나 공정분포에서도 그에 해당하는 전이행렬을 구하면 쉽게 적용될 수 있다.

병렬 계산을 위한 프로시저 전환 (Interprocedural Transformations for Parallel Computing)

  • 장유숙;박두순
    • 인터넷정보학회논문지
    • /
    • 제2권4호
    • /
    • pp.91-99
    • /
    • 2001
  • 프로그램 수행시간의 대부분이 루프 구조에서 소비되고 있기 때문에 루프 구조를 가진 순차 프로그램에서 병렬성을 추출하는 연구들이 많이 행해지고 있고 그 연구들은 하나의 프로시저 내 루프 구조의 변환에 치중되고 있다. 그러나 대부분의 프로그램들은 프로시저 간 잠재된 병렬성을 가지고 있다. 본 논문에서는 프로시저 호출을 가진 루프에서 병렬성 추출 방식을 제안한다. 프로시저 호출을 포함하는 루프의 병렬화는 대부분 자료종속거리가 uniform 형태의 코드에서만 집중되었다. 본 논문에서는 자료종속거리가 uniform 코드, nonuniform 코드 그리고 복합된(complex) 코드를 가진 프로그램에서 적용 가능한 알고리즘을 제시하였으며, 제안된 알고리즘과 loop extraction, loop embedding 그리고 procedure cloning변환 방법을 CRAY-T3E로 성능 평가하였다. 성능평가 결과는 제안된 알고리즘이 효율적이라는 것을 보여준다.

  • PDF

Analysis of R/C frames considering cracking effect and plastic hinge formation

  • Kara, Ilker Fatih;Ashour, Ashraf F.;Dundar, Cengiz
    • Structural Engineering and Mechanics
    • /
    • 제63권5호
    • /
    • pp.669-681
    • /
    • 2017
  • The design of reinforced concrete buildings must satisfy the serviceability stiffness criteria in terms of maximum lateral deflections and inter story drift in order to prevent both structural and non-structural damages. Consideration of plastic hinge formation is also important to obtain accurate failure mechanism and ultimate strength of reinforced concrete frames. In the present study, an iterative procedure has been developed for the analysis of reinforced concrete frames with cracked elements and consideration of plastic hinge formation. The ACI and probability-based effective stiffness models are used for the effective moment of inertia of cracked members. Shear deformation effect is also considered, and the variation of shear stiffness due to cracking is evaluated by reduced shear stiffness models available in the literature. The analytical procedure has been demonstrated through the application to three reinforced concrete frame examples available in the literature. It has been shown that the iterative analytical procedure can provide accurate and efficient predictions of deflections and ultimate strength of the frames studied under lateral and vertical loads. The proposed procedure is also efficient from the viewpoint of computational time and convergence rate. The developed technique was able to accurately predict the locations and sequential development of plastic hinges in frames. The results also show that shear deformation can contribute significantly to frame deflections.