• 제목/요약/키워드: Probable Maximum Flood

검색결과 55건 처리시간 0.031초

하구언 설치에 따른 하천유사량 변화에 관한 연구 (Reservoir Sedimentations of the Enclosure of Estuary Barraye in Gumgang Basin)

  • 이중기
    • 물과 미래
    • /
    • 제9권1호
    • /
    • pp.86-100
    • /
    • 1976
  • To study influences on the downstream, and the Gunsan harbor by setting up estuary of the Gumgang, available data which were collected from the measuring stations which were established within the river basin of which results attained are as follows: 1. The discharge can be calculated as the relationship between the discharge and precipitation in the basin is $R=4{\times}10^{-4}p^2$ or R=P-600 2. The discharge flow in to small resevoirs in the basin can be estimated as $QR=QS\frac{PR-600}{PS-600}(\frac{AR}{AS})$ 3. This daily average discharge at Kongju is 31% less than the during maximum probable discharge and that in Okcheon is 48% less than the daily maximum probable flood. 4. The maximum probable flood from the small stream in the basin can be estimated by a $Q=82.45A^{0{\cdot}464}$ 5. Sediments can be computed with Qs (suspended load)=1.41 $Q^{1{\cdot}42}$ and Qb (bed load)=165.2 $Q^{0{\cdot}705}$. 6. By setting up the specific estuary the tidal movement will be reduced to 93.6% on the average and the sedimentation is reduced to 96.0%. Upon review of overall analysis, the dead wate level of estuary of Gumgang will completely sedimented in next 30 years, therefore, the dredging work at Gunsan harbor is reduced to 73.6%, it is considered that life length will be extended about 52years taking account the existing condition.

  • PDF

가능최대홍수량 산정을 위한 단위도의 수정 방법 제안 (Suggestion of modification method of unit hydrograph for estimating probable maximum flood)

  • 이진욱;김소은;유철상
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2021년도 학술발표회
    • /
    • pp.309-309
    • /
    • 2021
  • 댐 설계 시 가능최대강수량(probable maximum precipitation, PMP)으로 인한 홍수량인 가능최대홍수량(probable maximum flood, PMF)이 고려되며, 이를 산정하기 위해서는 단위도가 필요하다. 즉, PMF는 PMP를 입력으로 하여 단위도를 이용한 강우-유출 해석을 통해 얻어진다. 따라서, 동일한 PMP가 고려되더라도 적용되는 단위도에 따라 산정되는 PMF는 달라진다. PMP가 발생하는 상황에서는 평균적인 상황에 비해 단위도의 반응이 보다 빠르고 강해진다(한국개발연구원, 2007; 한국수자원공사, 2008; Kjedsen et al., 2016). 국내의 경우, 아직까지 PMF 산정을 위한 단위도에 대한 명확한 지침은 존재하지 않는다. 댐설계기준해설(국토해양부, 2011)에서는 유역의 평균단위도로 PMF를 추정할 경우 실제보다 낮은 결과치가 도출되는 문제가 있을 수 있다는 점을 경고하는 수준에 그치고 있다. 이에 본 연구에서는 유속 정보를 기반으로 PMF 산정을 위한 단위도를 결정해 보고, 이를 통해 대표단위도로부터 PMF 산정을 위한 단위도를 결정하기 위한 수정 방법을 제안하였다. 추가적으로 이러한 수정단위도를 적용하여, 기존 국내 기준 적용 결과 및 확률 강우량을 통해 산정되는 빈도홍수량과의 비교를 수행하였다.

  • PDF

저수지 재해대비 보강설계를 위한 PMF의 적용 (Application of PMF on Reinforcement Design of Agricultural Reservoirs against Disaster)

  • 장중석;정진호;배상수
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2005년도 학술발표논문집
    • /
    • pp.324-329
    • /
    • 2005
  • This study considers that hydrologic stability evaluation of agricultural reservoirs designed by past standards and approximate increase methods of flood control when PMF(Probable maximum flood) flows in.

  • PDF

가능최대강수량 및 홍수량 산정에 대한 개선방안 연구 (A Study on the Improvement of Probability Maximum Precipitation and Probability Maximum Flood Estimation)

  • 전시영;문영일;안재현;김종석
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.1762-1766
    • /
    • 2006
  • In order to protect properties and human lives from disasters such as heavy rainfall, rational Probability Maximum Flood(PMF) estimation procedures for existing dam basins are recently required. This study analyzes the Probable Maximum Flood(PMF) as a part of a counterplan for disaster preventions of hydraulic structures such as dams, according to recent unfavorable weather conditions. In this study, an improvement method of parameter estimation was proposed, being estimated as an appropriate method for application to the unit hydrograph, the time of concentration and storage constant corresponding to the discharge of flood were considered differently when estimating PMF in Hoengseong dam basin.

  • PDF

PMF 산정방법에 따른 비교 (Comparison of the Estimation Methods for PMF)

  • 권남원;이정은;신홍섭
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2005년도 학술발표회 논문집
    • /
    • pp.710-714
    • /
    • 2005
  • 가능최대홍수량(Probable Maximum Flood; PMF)은 "지역에서 합리적으로 가능한 극심한 기상학적 그리고 수문학적인 조건들의 가장 심각한 조합으로 예상되는 홍수"라 정의되며, 가능최대강수량(Probable Maximum Precipitation, PMP) 입력으로 한 강우-유출관계에 의해서 산정되어진다. 본 연구에서는 댐과 같은 대규모 수공구조물의 설계와 평가의 기준이 되는 PMF 산정시 영향을 미치는 요소와 그에 따른 PMF를 비교$\cdot$검토하였다. PMF 산정방법 중 시간분포방법에 따른 가능최대호우(Probable Maximum Storm; PMS)의 구축과 단위도의 선정이 PMF의 값에 영향을 크게 미침을 알 수 있었다. 또한 기존 댐설계시 산정된 PMP/PMF와 재산정한 PMP/PMF의 변화를 비교$\cdot$고찰하였다. 평균적으로 기존 댐설계시에 비해 금회 산정한 PMP는 약 $27\%$, PMF는 약 $42\%$의 증가를 보였다. PMF의 증가는 PMP의 증가와 더불어 기존 단위도보다 실측자료에 근거한 단위도가 더 빠르고 강한 강도의 유역반응을 초래한 영향으로 판단된다.

  • PDF

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • 제7권
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

하천유역의 설계 홍수량 결정을 위한 P.M.P의 산정 및 적용 (PMP Estimation and Its Application for the Design Flood Determination in River Basin)

  • 이순택;박정규
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 1986년도 제28회 수공학연구발표회논문초록집
    • /
    • pp.93-101
    • /
    • 1986
  • 본 연구는 하천유역에 있어서, 대규모 수공구조물의 설계홍수량 결정을 위한 최대가능강수량(PMP)분석 및 적용에 그 목적이 있다. PMP는 수문기상학적 방법, 통계학적 방법, 포격선 방법으로 산정하였으며, 최대가능홍수량(PMP)은 합성단위도법과 Chow 방법으로 산정하였다. 각 방법에 의한 PMP를 비교해 본 결과, 통계학적 방법, 수문기상학적 방법, 포격선 방법의 크기 순으로 나타나고 있음을 알 수 있었으며, 산정된 PMP를 기왕의 최대강수량과 비교해 본 결과 수문기상학적 방법이 기상학적 제요소를 고려한 방법이 가장 타당한 방법이라고 사료된다. 산정된 PMP 및 PMF를 확률 수문량과 비교해 본 결과 수문기상학적 방법 및 통계학적 방법은 재현기간 1000년 확률 수문량을 다소 상회하는 것으로 나타났으며, 포격선 방법은 재현기간 200~500년 확률 수문량에 접근하고 있음을 알 수 있었다. 대규모 수공 구조물의 설계에 있어서 위험도를 고려할 경우에는 PMP로부터 PMF를 산정하는 것이 타당할 것이다.

  • PDF

분포형 수문모형을 이용한 유역기반의 PMF 및 유사-유출량 산정 (Watershed-based PMF and Sediment-runoff Estimation Using Distributed Hydrological Model)

  • 유완식;이기하;김영규;정관수
    • 한국농공학회논문집
    • /
    • 제60권2호
    • /
    • pp.1-11
    • /
    • 2018
  • Probable Maximum Flood (PMF) is mostly applied for the designs of large-scale hydraulic structures and it is estimated by computing the runoff hydrograph where Probable Maximum Precipitation (PMP) is inserted as design rainfall. The existing PMP is estimated by transferring the heavy rainfall from all watersheds of korea to the design watershed, however, in this study, PMP was analyzed by selecting only rainfall events occurred in the design watershed. And then, Catchment-scale Soil Erosion Model (CSEM) was used to estimate the PMF and sediment-runoff yield according to the watershed-based estimated PMP. Although the PMF estimated in this study was lower than the existing estimated PMF in the Yongdam-dam basin, it was estimated to be higher than the 200-year frequency design flood discharge. In addition, sediment-runoff yield was estimated with a 0.05 cm of the maximum erosion and a 0.06 cm of the maximum deposition, and a total sediment-runoff yield of 168,391 tons according to 24-hour PMP duration.

남사천 하류지역 홍수피해 분석 (The Analysis for Flood Damage on Nam-sa Down Stream Region)

  • 김가현;이영대;서진호;민일규
    • 한국환경과학회지
    • /
    • 제10권3호
    • /
    • pp.217-223
    • /
    • 2001
  • Where no records are available at a site, a preliminary estimate may be made from relations between floods and catchment chatacteristics. A number of these chatacteristics were chosen for testing and were measured for those catchments where mean annual flood estimates were available. Although the improvement using extended data in regression of flood estimates on catchment characteristics was small, this may be due to the limitations of the regression model. When an individual short term record is to be extended, more detailed attention can be given; an example is presented of the technique which should be adopted in practice, particularly when a short term record covers a period which is known to be biassed. A method of extending the peaks over a threshold series is presented with a numerical example. The extension of records directly from rainfall by means of a conceptual model is discussed, although the application of such methods is likely to be limited by lack of recording raingauge information. Methods of combining information from various sources are discussed in terms of information from catchment characteristics supplemented by records. but are generally applicable to different sources of information. The application of this technique to estimating the probable maximum flood requires more conservative assumptions about the antecedent condition, storm profile and unit hydrograph. It is suggested that the profile and catchment wetness index at the start of the design duration should be based on the assumption that the estimated maximum rainfall occurs in all durations centered on the storm peak.

  • PDF

돌발홍수 발생시 도시하천의 치수안전도 분석 (Safety Analysis of the Flood Control of Urban River in Flash Flood)

  • 박호상;심우배;송재우
    • 한국방재학회 논문집
    • /
    • 제3권3호
    • /
    • pp.125-132
    • /
    • 2003
  • 본 연구에서는 국지성 이상호우에 대한 하천의 치수 안전도를 분석하기 위하며 서울의 도시하천중 지방2급 하천인 홍제천을 연구 대상하천으로 선정하였고, 최근 발생한 이상호우 중에서 서울에 많은 피해를 입힌 2001년 7월 14일${\sim}$15일 강우 310.1mm와 서울지역 가능최대강수량(PMP)740.0mm를 적용 강우로 선정하였다. 홍제천의 치수 안전도를 분석한 결과, 계획빈도인 50년인 경우, 안전단면이 85%, 관리단면이 15%, 위험단면은 발생치 않았으나, 100년 빈도에서 안전단면이 5% 감소하고 관리단면이 4% 위험단면은 2% 증가하였다. 빈도가 증가함에 따라 증감율은 작게 나타났고 200년 빈도 이후에는 관리단면은 거의 변화가 없었으며 위험단면이 다소 증가하여 300년 빈도에서는 50년 빈도에 비해 8%, 500년 빈도에서는 12% 증가하였고 1000년 빈도에서는 위험단면이 19%, 관리단면이 13% 크게 증가하였다.