• Title/Summary/Keyword: Private Infrastructure Project

Search Result 113, Processing Time 0.033 seconds

Private Procurement for Constructions and Operation of Buman Road in Daegu (도시 인프라 시설을 위한 민자 유치 -대구시 범안로 민자도로의 운영 실태와 대책-)

  • Choi, Byung-Doo
    • Journal of the Korean association of regional geographers
    • /
    • v.13 no.6
    • /
    • pp.674-694
    • /
    • 2007
  • Recently private procurement projects for urban infrastructure have been emphasized and introduced by government(both central and local) as an important method to supplement public budget shortage and to improve creativity and efficiency in its construction and operation, and hence to promote regional development. But these private procurement projects seem to be implemented under the neoliberal condition of urban policy for private capital to extend its sphere of investment and to ensure its opportunity of profit. Such private procurement projects for urban infrastructure have been legislated and widely applied since 1994 in S. Korea, but in recent years they have triggered out a variety of serious problems. In results of this study on the private procurement for construction and operation of Burnan Road in Daegu, it can be pointed out, it has led serious problems such as overestimation of traffic volume in plan, over-appropriation of construction cost and appurtenant business, irYational operation and account of the operating firm, problem in refinancing and change in contents of practical agreement, and over-compensation of minimum operation revenue. Some measures that can be considered as alternatives to resolve those problems and to operate more rationally the Buman Road include those of increasing traffic revenues, of reducing supports of public financing, and withdrawal of (part or whole of) operational right from the private firm.

  • PDF

Derivation of Components for Feasibility Study of Smart City Public and Private Partnership Projects (스마트시티 민관합동사업의 타당성분석 구성요소 도출)

  • Hyun, Kilyong;Jin, Chengquan;Lee, Sanghoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.98-110
    • /
    • 2023
  • The smart city public and private partnership project is a project to build and operate a sustainable city by investing land and capital in public-private partnership to build urban infrastructure and providing various urban services. It highly depends on the precise feasibility study and the projection of the various factors affecting the project during the planning stage to get the project successful. However, it is very difficult to predict the possibility of the project success in advance due to various physical and social factors. It is necessary to derive factors affecting the project at the planning stage and respond with appropriate analysis in order to solve these problems and to carry out a successful project. Therefore, this study derived preliminary components for feasibility study through previous studies and order status analysis and presented feasibility study components such as five-step processes, 10 process items, 19 analysis items, and 54 detailed analysis items through the Delphi method. It can be expected that this research is to contribute corresponding to diversified possible risks and facilitate the projects during the promotion.

Identification and Effect Analysis of Risk Factors for Build Transfer Lease Projects (BTL민간투자사업의 리스크 식별 및 영향도 분석에 관한 연구)

  • Jung, Jung-Man;Park, Young-Min;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.47-56
    • /
    • 2007
  • The Build-Transfer-Lease(BTL) system is a new way of attracting private capital to social infrastructure construction projects. Private companies will get back their investment by leasing facilities to the government. In January 2005, government introduces a 'Korean New Deal Policy' to initiate BTL system in the field of social infrastructure development such as education, public welfare, housing, culture etc. As BTL being still in premature phase, thus it is lack of knowledge in BTL and there is no such studies about problems and impacts of BTL projects. However, there could be so many problems underlying within BTL projects. Therefore, the purpose of this paper is to identify various risk factors during implementation of BTL projects. For this purpose, five BTL undertaking projects were studied. Field survey was conducted based-on interview instruments. Prevailing risk factors in operating the BTL Project were collected from the both officials of project promoters and concessionaires. In addition, a distinct need has emerged for analysis of risk factors for BTL projects. Based on real cases, this study resulted in risk factors influencing every phases and grouped risk factors into each phase. Moreover, this study also perform sensitivity analysis in order to know how risk factors affect to BTL projects. From analyzing the data, the study addresses that both major BTL project participants 'the competent authority' and 'Special purpose company(SPC)' have many problems and difficulties to operate the projects.

Development Scheme of Transport Infrastructure in Poland as the European Union Member by Public Private Partnership

  • Stanislaw Barbuzynski;Kim Soo-Yong;Lee Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.120-127
    • /
    • 2004
  • In May 2004, Poland with nine other Eastern European countries joined the European Union(EU). After accession to the EU, Poland will accelerate the realization of investment in road sector, and wants to achieve important development of its road network condition in year 2005. Polish government is not able to afford the whole investment needed for construction of its motorways, so it wants to develop effective techniques of project funding based on the Public Private Partnerships(PPP). Without having high-performance transport networks, one country's economy cannot be competitive. It was the reason for establishing the Trans European Network(TEN) in the European Union. It creates the links, which are still missing between the fifteen countries of Western Europe and the new member countries like Poland. Consequently, Poland will also need to establish a proper transport infrastructure network. This paper will discuss how the PPP scheme can be applied for the transport infrastructure development in Poland as a EU member.

A Study on the Evaluation of Value for Money in Private Provided Infrastructure with a Focus on BTO Projects (BTO 민간투자사업의 화폐적 투자가치 평가)

  • Baek, Seong-Jun
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.1 s.94
    • /
    • pp.49-59
    • /
    • 2007
  • This study has examined the allocation of risk in Korea's private provided Infrastructure(PPI) with the following contents (1) Developing a quantitative risk allocation model for Korea's PPI and (2) examining the implication of changes in the minimum revenue guarantees (MRG) clause of government legislation using the developed empirical model. The model of this study adopts and extends H. Yamaguchi's model developed in 2002. To investigate Korea's actual risk allocation deals, the author incorporated the MRG framework. The payment related to the MRG is indeterminable. Hence. the average MRG rate was calculated using probabilistic risk analysis. The risk allocation model is applied to the two eases to validate the model and evaluate the project's VFM(Value for Money). As the revenue guarantee rate is lowered, the government subsidies are increased. This in turn worsens VFM. The same relationship is true when the revenue guarantee Period is shortened.

Decision Support Model for Determining Public or Private Highway Investment Projects (고속도로 건설사업의 재정/민자 발주선택 의사결정 지원모델)

  • Yeo, Donghoon;Jeong, Wooyong;Han, Seung Heon;Lee, Young Cheon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.381-389
    • /
    • 2009
  • Korean government is investing 1.8 billion won on infrastructure and investment on PPP projects constitutes 16.3%. This phenomenon is to promote private investment as well as lessening government burdens of public budgeting. However, the only criterion to be considered is government financial status in selecting public or private highway investment projects. So systematic decision support model is required in choosing public or private highway investment projects. So, this paper suggests a systematic decision support model for deciding public or private highway investment at the early stage of project planning. Furthermore, this paper identifies key decision variables with respect to economic, politic, project management criterions based on the related literatures and feedbacks from experts. This paper analyzed 30 cases of government investment and PPP projects and got the survey result from highway specialists. As a result, this paper presents an interval with respect to economic criteria using mean and standard deviation and a logistic regression equation which can predict the possibility of PPP project. Through this study, decision maker of central or local government can decide public or PPP highway project more systematically and reasonably.

Performance-Oriented Procurement Process and VE/PSC for Private Finance Initiatives (민간투자사업의 성능중심적 발주방식 및 PSC의 활용방안)

  • Lim Jong-Kwon;Park Heung-Min;Jung Kun-Ho;Woo Ji-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.51-58
    • /
    • 2004
  • The input-oriented project promotion system private participation in infrastructure projects currently in use in Korea has encountered difficulties in securing the primary benefits of private sector creativity problem solving and inflow of private capital. As such, the performance (or output)-oriented procurement process implemented in England and other developed countries should be evaluated for introduction. In Korea, private participation projects are currently identified as either solicited or unsolicited projects, each with different promotional procedures, the problem with these procedures is that competition is not pre-activated, the private sectors creativity is under utilized, and the rationality of project evaluations is inconsistent. Korea should, in order to raise the level of private sector creativity and efficiency, go beyond the currently applied Input Specification project promotion system to a Performance-oriented system similar to those implemented in England and other countries. To achieve this, we mate several proposals for the introduction of the performance-oriented system. We divide the main features of our proposals into three categories, including a reformed concessionaire selection system, a performance orientation in preparation of the concession agreement, and a performance orientation in contract management, and discuss each. 1'his study describes performance-oriented promotion systems in an output-focused way As this is an initial study on the introduction of performance orientation in private participation, various key points and proposals were identified. However, in the future, detailed research in technical fields and systems, legal research, and practical projects will be needed for implementation

  • PDF

Understanding the Perceptions of Stakeholders in Environmental Conflict - Public-Supported Private Rental Housing Conflict in Busan Sasang-gu Jurye 3 District - (환경갈등에 있어 이해관계자들의 인식에 관한 연구 - 부산 사상구 주례 3지구 민간임대주택사업사례를 대상으로 -)

  • Park, Jong-Sik;Cho, Seong Yun;Jung, Juchul
    • Journal of Korea Planning Association
    • /
    • v.54 no.4
    • /
    • pp.109-121
    • /
    • 2019
  • The purpose of this study is to understand the perceptions of stakeholders in environmental conflicts. The private rental housing project in Busan Sasang-gu Jurye 3 District, which took place in 2017 is one of many cases of environmental conflicts between developers and local residents. The case is considered as a typical failure of collaborative governance that has consequently caused negative impacts to both local residents and government. To understand why local residents could not come to consensus even though the majority of them were against the development project, we analyzed residents' perceptions and subjective opinions towards environmental conflicts. This study adopted 'Q methodology' to investigate human subjectivity. The results showed three distinguished types of subjectivity structures. Each type was named as 'collaborative governance advocates', 'public administration distrusters', and 'current local government supporters' based on their characteristics. Participants in all three types showed opposition to environmental damages that can be caused by the private rental housing development, but they revealed different perspectives on the importance of public participation and institutional responsibility in the process of decision-making. This study makes better understand what makes it difficult to build collaborative governance as a means of overcoming environmental conflicts.

A Feasibility Study on the Infrastructure Project of PCB Industrial Technology (PCB 산업기술 기반구축 사업의 타당성 분석 연구)

  • Kim, Dae Ho
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.8 no.4
    • /
    • pp.57-66
    • /
    • 2013
  • Domestic PCB industry formed by orders of demand companies is extremely vulnerable in its innovation infrastructure including high value-added technology development and information exchange. The majority of PCB products produced in the country relies on the imports from abroad and it causes its vulnerability to external market changes. Due to the negative perceptions about the industry (e.g., 3D job), low treatment (especially SMEs) and expertise employment avoidance in PCB industry, the job market conditions of PCB industry is not so good. In these circumstances, the PCB industry is completely dependent on the demand market such as cellular phones, and tablet PC, and as a result the responsiveness of PCB industry to the changes in demand market is also vulnerable. In this PCB industry, Korean government is trying to build the research infrastructure for PCB industry that realizes the sharing of information among companiesthrough the operation of the PCB industry innovation forum (information innovation), builds SME suppot platform and supports quality improvement (technology innovation), and supports enterprise collaboration processes (material-process-equipment) utilizing PCM open laboratory. The PCB industry technology infratstructure project is going to be promoted by the government(1.3 billion won, each year) and the private investmen(434 million won each year) from 2013 to 2017(5 years project)(table 1). This study analyzes the feasibility of the project, by using the AHP analysis and the results shows that this project is considered feasible because the AHP overall score is evaluated as 0.841, the overall score is greater than or equal to 0.55.

  • PDF

Promotion of the Private Investments in the Military Facilities through Integration of BTL and BTO Methods (BTL방식과 BTO방식을 혼합한 군시설 민간 투자사업의 활성화 방안의 연구)

  • Kwak, Soo-Nam;Park, Sang-Hyuk;Han, Seung-Heon;Kim, Hyoung-Kwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.278-283
    • /
    • 2006
  • Koran Government introduced BTL(Build-Transfer-Lease) to provide convenience through early supplying infrastructure and plans to invest 8,315million dollar to 84 projects of 15 BTL type involving official residence and railroad. But some of construction company hates to invest BTL projects because of its low earning rate. In addition if we correctively apply project which partly has profitability to BTL, the earnning rate declines more seriously. So this paper presents BTL+BTO model which operates BTL in the non-profitable parts to improve convenience of users and BTO in the profitable parts to improve earning rate. BTL+BTO model based on operate period was presented and its suitability was confirmed by applting 00 region official residence project.

  • PDF