Pusan the principal port of South Korea, has opened its door since 1876. Currently, the four-stage port construction project is under way to handle ever-growing marine transportation volume. While the port unloading capabilities are increasing the infrastructure to deal with all the transportation volume failed to catch up with them. Accordingly the city had to suffer from worst traffic congestion on due to the increasing container traffic volume causing logistical costs to rise. This study was designed to inspect the enforcement of infrastructure construction plan and suggest systematical and effective ways to improve the plan. The study focused on :\circled1The decision-making procedure, \circled2Financial resource for the plan, \circled3Effectiveness of the project enforcement, and \circled4Who will be in charge of the project. As a result from the study, these followings were suggested to improve the plan. First, Pusan Port Infrastructure consisting of (Inter-city Free way, Belt Highway and Outer Highway) should be immediately legally-regulation project. Second, the method to finance the project should be deter-mined and investment consultation among the central government the city government and private sector should be also made. Measures to make the central government budget allocation for the project mandatory should be discussed. Third, Effectiveness of the project can be doubled by gradually or partialyl opening the routes based on long-term or short-term operating plans. Fourth, The organizer of the project should be appointed, or a special task-force team in charge of the plan can be formed.
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.3
/
pp.1-6
/
2012
This paper aims to suggest a validity analysis model that would be helpful for local governments considering u-City construction projects and a methodology for them to promote build-transfer-lease (BTL) u-City projects. This methodology mainly uses quantitative and qualitative analysis based on the Value For Money (VFM) designed by the Public and Private Infrastructure Investment Management Center (PIMAC) under the Korea Development Institute (KDI). BTL projects requires a large amount of capital and involves long-term investments. Therefore, multi-faceted validity analysis is required for the success of a project. This study will enumerate various factors to be considered in the pre-analysis of validity of BTL projects and suggest a methodology to verify them. A case study of a BTL project promoted by Ansan City assisted in designing this study in detail.
Otemachi(大手町) is the region where it plays a pivotal role in Japanese economy as representative head offices of companies including financial insurance, general trading, information and communication newspaper media are concentrated. However, regenerating the entire region from worn-out infrastructures of buildings and city into the fresh and vibrant foothold in international business was the problem to be solved. In this situation, was examined on the basis of administrative agencies and relevant enterprises to reconstruct office buildings in phases without ceasing business functions and activities by utilizing the large-scale vacant land occurred from the relocation of the national public institutions. The independent administrative institution 'Urban Renaissance Agency(UR)' has completed the examination of industrialization and participation request for the commencement of the project. In this article, The overview of , the new form of project promoted and cooperated by officials and people, is introduced by UR (Urban Renaissance Agency) reorganizing the land exchange and infrastructure through the land readjustment project, and at the same time, procuring capital and building office buildings in solidarity with private development enterprises and financial institutions.
Korean Journal of Construction Engineering and Management
/
v.5
no.3
s.19
/
pp.55-62
/
2004
The purpose of this study is to suggest a systematic procedural model for selecting competent project promoter. The proposed model was made by comparing domestic regulations and procedures with foreign nations', and through interviews with experts and literatures survey. The summaries of this paper are as follows. The current promoter selection procedure was evaluated by reviewing relevant papers, regulations and existing model. Some obstructions which hinder PPI project activation were identified, those are inadequacy of promoter qualification and negotiation process, lack of communication between parties, etc. Some alternatives which remove major obstructions are embodied in the model. The suggested model is comprised of PQ(prequalification), two phased evaluation for the technical proposals which include alternate, communication meeting, etc. To manage the overall procedure well, an involvement of professional "project promoter selection team" would be highly recommended. They will participate in each evaluation stage with full activities, and provide government with some technical materials for selecting promoter as coordinator.
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.3
/
pp.192-203
/
2012
As a leading nation of ubiquitous technology, South Korea has been promoting u-City pilot projects throughout the country. According to 'Fundamental Construction Law of u-City,' u-City projects are classified into old-town and new-town types. However, most projects have focused only on the new-town type. Pushing forward large-scale land development projects, Korea Land and Housing Corporation (LH Co.) under Ministry of Land Transport and Maritime Affairs (MLTM) has gained a development profit out of the u-City infrastructure and then donated the infrastructure to a local government without making any plan for operations. In the process of u-City pilot projects, old-towns have been relatively ignored and various of unexpected problems have emerged. Building the u-City of an old-town is not easy due to many constraints such as huge initial investment, long validity and verification procedures, lack of useful services for citizens, lack of professional outsourcing methods for business promotion, high operating costs of the integrated control center, inadequate law related, insufficient institutional requirements and so on. This paper introduces a case study on u-City development for an old-town, Ansan City, as a private investment project. The case will help boost u-City projects for old-towns by solving their problems and providing an effective operational mechanism. As the first BTL (Build-Transfer-Lease) project for constructing u-City, 'Broadband Information Network Development Project' of Ansan City will provide a reference model of expanding u-City projects for other cities.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.338-341
/
2006
After the revision of Private Investment Law in January 2005, BTL is introduced to expand the social infrastructures as a major business procedure. Especially, the size of the public educational infrastructure ordered by each city education office is increased by 45% compared to last year, so it is major in BTL Project. However, in the process of practicing BTL Project by now, there are a lot of problems specially in the public educational infrastructure. As a result, this study gives the solutions in the process of BTL Project, the CM models to support the Education Office${\square}{\square}$job and the suggestions for the working scope of the participating construction companies.
International conference on construction engineering and project management
/
2022.06a
/
pp.967-974
/
2022
It is no news that Nigeria's infrastructure challenge is enormous. In the global ranking, Nigeria ranked low in quantity and quality of its infrastructural provision which has a great impact on the ease of business transaction. Low investments in transportation have brought about the current infrastructural deficit. Recently, the Nigerian government has made effort to address at least to some extent the infrastructural deficit through Public-Private Partnership, but this has not yielded the desired result. Moreover, the sustainability issues relating to railway projects such as, emissions, noise pollution, ecosystem, and other environmental issues calls for urgent attention. Hence, this necessitated consideration on sustainability appraisal for the Chinese rail project in Nigeria. This study reviews sustainability of railway projects built by the Chinese firm in Nigeria with particular emphasis on the environmental and social impact of these projects. The study further identified issues and challenges in project implementation with a particular focus on civil dialogue and community engagements. A detailed literature search was conducted on railway projects and infrastructure by systematically reviewing selected published articles.The analysis of the selected articles identified sustainability issues and potential for improvement of Chinese railway projects and how they contribute to or inhibit competitiveness in the Nigerian railway market. From the literature searched, some of the projects constructed by Chinese firm revealed that there is economic and social impact of railway projects delivered by the Chinese firm in terms of capacity development and knowledge transfer potentiality. For instance, in the just concluded Lagos-Ibadan railway projects, the study gathered that the project brought about 5000 jobs and local staff were trained by the Chinese company, this will boost man power and local content capability. Also, it will significantly improve Nigeria's infrastructure and boost its economic development. The study suggests that Nigerian government should ensure and provide an enabling environment that is conducive for investment on the continent. Peace, improved security, and decent governance are the best conditions for sustainable transportation growth.
Journal of the Korea Institute of Building Construction
/
v.20
no.4
/
pp.347-355
/
2020
The economic growth rate and the urban population of the Vietnam are steadily increasing. As a result, the size of the Vietnam's construction market for infrastructure development is expected to increase. However, Vietnam is adopting PPP(Public-Private Partnership) to solve this problem because the government lacks the financial and administrative capacity for infrastructure development. PPP is a business that lasts more than 10 years, so risk management is very important because it can be a long term damage in case of business failure. This study proposes a self-organization map (SOM) for analyzing the impact of risk factors and determining the priority of them. SOM is a visualization analysis method that analyzes the inherent correlation through the color pattern of each factor.
Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.6D
/
pp.655-662
/
2010
As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.
Purpose The beginning of innovation and creation, Haenggung-dong, Paldal-gu, Suwon-si: Suwon Hwaseong Fortress, which began in 1794 by King Jeongjo in accordance with the spirit of Beopgochangsin, mobilized the abilities of traditional techniques, new science and technology, and artists New starting point for urban innovation in Suwon: Based on 5G technology possessed by leading companies in the global ICT industry in Hwaseong (Haenggung-dong), a product of cutting-edge evidence, solve various urban problems through public, private, industrial and academic governance, and a new business model It aims to reorganize into the space where this is created. Design/methodology/approach The New 1794 Project is a 2019 demonstration project requested by the Ministry of Land, Infrastructure and Transport for "Suwon Smart City Challenge Project: Haenggung-dong, Paldal-gu, Suwon-si," developed by the Dankook University SW Design Convergence Center, and the main project from 2020 to 2022. The smart city project strategy should be implemented based on partnerships with multiple stakeholders, and the bottom-up approach and the traditional top-down must be able to coexist. Therefore, the smart city solution applied a horizontal governance method. Findings In this study, the definition of the New 1794 Project, which is the key to defining smart cities in relation to all analyzed aspects, was developed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.