• 제목/요약/키워드: Priority of risk

검색결과 493건 처리시간 0.023초

도시안전에 영향을 미치는 재난유형에 관한 연구 (A Study on Types of Disasters Affecting City Safety)

  • 최윤철
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.93-100
    • /
    • 2019
  • Modern society is transforming into an extreme climate environment. This is fatal to humans and ecosystems and is expected to cause large-scale damage. As this spokesman, natural disasters are increasing as this global average temperature rises. Social and economic damage by this tendency is also increasing. In addition, the frequency and scale of social disasters are increasing. Damage to the living area due to the damage of the infrastructure due to the increased reliance on infrastructure has been increasingly enlarged. In this research, various disasters such as natural disasters and social disasters analyze the impact on urban safety. A local autonomous entity K Priority Management Establish a kind of disaster, prepare crisis management manual, and use it as a basic material of education / training.

실패유형의 종속성을 고려한 서비스 시스템의 FMEA 평가모델 (A Systematic Approach for Evaluating FMEA of a Service System under Considering the Dependences of Failure Modes)

  • 오형술;박노국
    • 벤처창업연구
    • /
    • 제9권1호
    • /
    • pp.177-186
    • /
    • 2014
  • FMEA는 실패로 인한 위험을 최소화하기위해 실패의 요인과 그로인한 영향을 사전에 평가하는 체계적인 방법이다. 이 방법은 제품의 신뢰도 문제를 해결하기 위해 제조산업 분야에서 주로 사용되어 왔으나, 서비스의 역할과 중요성이 커지면서 최근에는 이를 서비스의 신뢰도 문제에도 사용하고 있다. 하지만, 서비스에서는 고객이 서비스 전달 프로세스에 참여하며 고객마다의 이질성 등으로 인해 제조업을 위해 개발된 FMEA를 직접 사용할 수은 없다. 이러한 이유로 인해, FMEA를 서비스에 적용하기위한 여러 연구가 이루어지고 있다. 본 논문에서는, 심각도, 발생빈도, 검출력으로 우선순위를 평가하던 기존의 RPN 대신에, 서비스 특성을 고려하여 심각도, 발생빈도, 회복력 3가지로 평가하는 새로운 지수 S-RPN을 제시하였으며, 기존연구의 사례를 통해 제시된 방법의 효용성을 평가하였다.

  • PDF

AHP를 활용한 국방 품질보증 위험도 평가 개선 방안 (A Method to Improve the Risk Assessment in the Defense Quality Assurance Using AHP)

  • 이낙형;이상진
    • 한국국방경영분석학회지
    • /
    • 제33권1호
    • /
    • pp.31-42
    • /
    • 2007
  • 국방기술품질원에서 1999년부터 수행중인 품질위험도 평가 기법은 하자발생 가능성이 높은 취약업체 또는 취약품목을 식별하는데 제한적이라는 평가를 받고 있다. 이 연구는 AHP 기법을 통해 평가요소의 중요도를 재 산정한 평가모형을 제시한다. 개선된 평가배점의 타당성을 검증하기 위해 2005년도 하자발생 품목의 위험도 평가결과에 적용하여 평가점수 및 위험도의 변화를 분석하였다. 개선된 평가모형은 기존의 평가배점 방법 보다 고 중 위험도 품목을 더 많이 식별해 낼 수 있었으며 업체위험도가 품목위험도보다 더 중요한 것으로 나타났다. 업체위험도에서는 전문능력과 생산실적, 품목위험도에서는 제품특성 평가요소가 상당히 중요한 것으로 평가되었다. 고 위험도로 분류된 업체는 품질에 있어 집중관리를 받게 됨으로 하자 발생의 가능성이 더 줄어들 수 있을 것이다.

Hazard Analysis and Risk Assessments for Industrial Processes Using FMEA and Bow-Tie Methodologies

  • Afefy, Islam H.
    • Industrial Engineering and Management Systems
    • /
    • 제14권4호
    • /
    • pp.379-391
    • /
    • 2015
  • Several risk assessment techniques have been presented and investigated in previous research, focusing mainly on the failure mode and effect analysis (FMEA). FMEA can be employed to determine where failures can occur within industrial systems and to assess the impact of such failures. This research proposes a novel methodology for hazard analysis and risk assessments that integrates FMEA with the bow-tie model. The proposed method has been applied and evaluated in a real industrial process, illustrating the effectiveness of the proposed method. Specifically, the bowtie diagram of the critical equipment in the adopted plant in the case study was built. Safety critical barriers are identified and each of these is assigned to industrial process with an individual responsible. The detection rating to the failure mode and the values of risk priority number (RPN) are calculated. The analysis shows the high values of RPN are 500 and 490 in this process. A global corrective actions are suggested to improve the RPN measure. Further managerial insights have been provided.

Location Analysis for Emergency Medical Service Vehicle in Sub District Area

  • Nanthasamroeng, Natthapong
    • Industrial Engineering and Management Systems
    • /
    • 제11권4호
    • /
    • pp.339-345
    • /
    • 2012
  • This research aims to formulate a mathematical model and develop an algorithm for solving a location problem in emergency medical service vehicle parking. To find an optimal parking location which has the least risk score or risk priority number calculated from severity, occurrence, detection, and distance from parking location for emergency patients, data were collected from Pratoom sub-district Disaster Prevention and Mitigation Center from October 2010 to April 2011. The criteria of risk evaluation were modified from Automotive Industry Action Group's criteria. An adaptive simulated annealing algorithm with multiple cooling schedules called multi-agent simulated quenching (MASQ) is proposed for solving the problem in two schemes of algorithms including dual agent and triple agent quenching. The result showed that the solution obtained from both scheme of MASQ was better than the traditional solution. The best locations obtained from MASQ-dual agent quenching scheme was nodes #5 and #133. The risk score was reduced 61% from 6,022 to 2,371 points.

퍼지-FMEA기법을 이용한 차량탑재형 고소작업대 사고의 주요 유해위험요소 위험우선순위 결정 (Determination of Critical Hazard Factors in Vehicle-Mounted MEWP using Fuzzy-FMEA)

  • 오세윤;이강돈;신재호;임재용
    • 한국안전학회지
    • /
    • 제38권1호
    • /
    • pp.9-17
    • /
    • 2023
  • In this study, we aimed to identify the important hazard factors and determine their criticality in causing serious accidents in vehicle-mounted mobile elevated work platforms (MEWPs). Fuzzy failure modes and effects analysis (FMEA)was performed using accident data and a survey of experts. To determine the hazard factors, the accident data for the last 10 years were used and a questionnaire survey was designed. The questionnaire survey was sent to four experts in the field of occupational safety to determine the severity, occurrence, and detectability of serious accidents in MEWPs. Furthermore, objective RPN scores and risk priority were obtained using fuzzy FMEA. Finally, the criticality of hazard factors in descending order was found to be overloading, non-installation or defective installation of outriggers, breakage due to wire rope aging, and illegal remodeling of vehicle structures. The results were verified by comparing the occurrence data of serious disasters.

FMEA를 이용한 건설현장 전력설비의 위험성에 대한 정성적 평가 (Qualitative Assessment for Hazard on the Electric Power Installations of a Construction Field using FMEA)

  • 김두현;이종호
    • 한국안전학회지
    • /
    • 제19권4호
    • /
    • pp.36-41
    • /
    • 2004
  • This paper presents an qualitative assessment for hazard on the electric power installations of a construction field using FMEL The power installations have the mission to maintain the highest level of service reliability on the works. The more capital the electric power invest the higher service reliability they plausibly will achieve. However, because of limited resources, how effectively budgets can be allocated to achieve service reliability as high as possible. The assessment typically generates recommendations for increasing component reliability, thus improving the power installation safety. The FMEA tabulates the failure modes of components and how their failure affects the power installations being considered. Tn order to estimate the risks of a failures, the FMEA presents criticality estimation or risk priority number using the severity, occurrence, and detectability. The results showed that the highest components of the risk priority number among components were condenser, transformer, MCCB and LA. And In case of the criticality estimation, the potential failure modes were abnormal temperature rise, insulation oil leakage, deterioration for the transformer, overcurrent for the MCCB and operation outage fir the LA.

The Failure Mode and Effects Analysis Implementation for Laser Marking Process Improvement: A Case Study

  • Deng, Wei-Jaw;Chiu, Chung-Ching;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • 제8권1호
    • /
    • pp.137-153
    • /
    • 2007
  • Failure mode and effects analysis (FMEA) is a preventive technique in reliability management field. The successful implementation of FMEA technique can avoid or reduce the probability of system failure and achieve good product quality. The FMEA technique had applied in vest scopes which include aerospace, automatic, electronic, mechanic and service industry. The marking process is one of the back ends testing process that is the final process in semiconductor process. The marking process failure can cause bad final product quality and return although is not a primary process. So, how to improve the quality of marking process is one of important production job for semiconductor testing factory. This research firstly implements FMEA technique in laser marking process improvement on semiconductor testing factory and finds out which subsystem has priority failure risk. Secondly, a CCD position solution for priority failure risk subsystem is provided and evaluated. According analysis result, FMEA and CCD position implementation solution for laser marking process improvement can increase yield rate and reduce production cost. Implementation method of this research can provide semiconductor testing factory for reference in laser marking process improvement.

FMEA 기반 우편 기계 유지 보수 방법 (Maintenance Method of Mail Sorting Machine Based on FMEA)

  • 박정현
    • 한국산학기술학회논문지
    • /
    • 제11권5호
    • /
    • pp.1601-1607
    • /
    • 2010
  • 본 논문에서는 FMEA (Failure Mode Effect Analysis) 기법을 적용한 우편기계 유지보수 방법 제시하였다. 제안된 방법은 우편기계 모듈 및 부품에 대해 고장 유형을 정의하고, 고장 유형별 시스템에 주는 영향과 고장 빈도 및 검출도 등을 정의하여 고장 유형에 대한 시스템 위험도를 계산하여 그 값에 기반하여 점점 항목과 점검 주기를 조정하도록 하므로 시스템의 고장을 사전에 예방하고 시스템 가동율을 높이도록 하는 효율적인 유지보수 방법이다. 실제 현장에서 운영되고 있는 소형 통상 우편 구분 기계에 대해 제안된 방법의 적용 예를 보였다. 따라서 제안된 방법은 향후 국내 우편기계 유지보수에 적용시 유지보수 용이성과 효율성을 높일 것으로 기대한다.

도시철도 건설공사의 공종별 위험도에 관한 연구 (A Study on The Risk Level of Work Types in Urban Railway Construction)

  • 이종빈;한인국;장성록
    • 한국안전학회지
    • /
    • 제31권2호
    • /
    • pp.98-103
    • /
    • 2016
  • The goals of this study were to investigate some significant factors to judge level of safety at urban railway construction field and to analyze degree of risk by work classification. Currently, there are lots of construction fields for the urban railway for national transportation, and our government also planned constructing more urban railway in near future. However, most of the researches on safety neglected the degree of risk factors on the urban railway construction field. Safety managers participated in the brainstorming session for deriving decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for deriving most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including adjacency of obstacle, intensity of work, unsafe condition and work space. Third, the results of AHP showed civil work is the most dangerous work among 6 work types. The results could be used to give the safety management priority on accident prevention efforts among several hazards and to reduce degree of risk in construction field of the urban railway.