• Title/Summary/Keyword: Priority

Search Result 6,405, Processing Time 0.035 seconds

Analysis of Quality Improvement Priority for Construction PMIS

  • An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.10-21
    • /
    • 2012
  • As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.

Performance Analysis of ATM Switch Using Priority Control by Cell Transfer Ratio (셀 전송비율에 의한 우선순위 제어방식을 사용한 ATM 스위치의 성능 분석)

  • 박원기;김영선;최형진
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.32A no.12
    • /
    • pp.9-24
    • /
    • 1995
  • In this paper, we proposed and analysed two kinds of priority control mechanism to archive the cell loss rate requirement and the delay requirement of each class. The service classes of our concern are the high time priority class(class 1) and the high loss priority class(class 2). Two kinds of priority control mechanism is divided by the method of storing the arriving class 2 cell in buffer on case of buffer full. The first one is the method which discarding the arriving class 2 cell, the second one is the mothod which storing the arriving class 2 cell on behalf of pushing out the class 1 cell in buffer. In the proposed priority schemes, one cell of the class 1 is transmitted whenever the maximum K cells of the class 2 is transmitted on case of transmitting the class 1 cell and the class 2 cell sequentially. In this paper, we analysed the cell loss rate and the mean cell delay for each class of the proposed priority scheme by using the Markov chain. The analytical results show that the characteristic of the mean cell delay becomes better for the class 1 cell and that of the cell loss rate becomes better for the class 2 cell by selecting properly the cell transfer ratio according to the condition of input traffic.

  • PDF

A study of Priority-setting in Korean National Dental Health Insurance Scheme (치과 건강보험 우선순위 설정을 위한 고찰)

  • Han, Ji-Hyoung;Hwang, Yoon-Sook
    • Journal of Korean society of Dental Hygiene
    • /
    • v.6 no.3
    • /
    • pp.243-261
    • /
    • 2006
  • Priority setting in national health insurances in major advanced countries and the nation was investigated to draw the criteria for priority setting and suggest the most rational criteria for dental insurance so as to help secure the efficiency of medicare financing and individual's health right and also elevate medical consumers' satisfaction with health insurance. 1. Priorities in national health insurance are different from country to country, depending on the medical security systems, priority introducing conditions, and social environment, but have many common factors. 2. The priority setting criteria for national health insurance in those countries include the following in common: the efficiency, equity, and cost effect of treatment, emergency of treatment, consumption of expense, efficacy of treatment, patient's receptiveness, patient's demand, severity of disease, and patient's responsibility for the disease. 3. In oral diseases, severe diseases including oral cavity cancer are low in rate, and in-hospital treatments are few. From the above findings, it is suggested that dental insurance should establish discriminative criteria for priority setting by reflecting the aspects of dental diseases and system difference between dental and other health insurances and taking account of efficiency of treatment through prevention, cost effect, prevalence and incidence of generalized diseases, and individual's financing burden.

  • PDF

Priority setting for expanding health insurance benefit package using Analytic Hierarchy Process (계층화분석법(AHP)을 이용한 건강보험급여확대상병 우선순위 결정)

  • Choi, Sook-Ja;Ko, Su-Kyoung;Kim, Jung-Hee;Lee, Sang-Yi
    • Health Policy and Management
    • /
    • v.16 no.1
    • /
    • pp.73-94
    • /
    • 2006
  • This study was carried out to show how the Analytic Hierarchy Process technique could be used in setting the priority among selected diseases to increase the range of health insurance benefit. Thirty experts, including doctors (group1), experts for preventive medicine or public health(group2), and representatives of the insured(group 3), participated in the study panel that is conducted for priority setting. They were asked to evaluate the priorities among 6 selected criteria and then 42 selected diseases. The results were as follows; First, representatives of the insured think that the magnitude of out-of-pocket payment should have high priority while doctors think that effectiveness of treatment should have high priority. Second, all experts think that catastrophic diseases such as malignant neoplasm, major heart disease, and cerebral vascular disease should have high priority in health insurance coverage even though there is little difference among groups. These results can be useful to establish a systematic strategy for expanding health insurance benefit package.

Effects of Software Education Program for the Education Welfare Priority Support Students on Learning Motivation, Self-efficacy and Goal Orientation

  • Kim, Jeong-Rang
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.11
    • /
    • pp.161-168
    • /
    • 2017
  • In this paper, we propose a Software Education Program for the Education Welfare Priority Support students. Elementary school students of education welfare priority support programs has low school satisfaction level and course maturity. Also, they have various problem such as relatively large digital divide when compared to general student. To solve such problem, we designed, developed, and applied a software education program on education welfare priority support program's elementary school students to analyze its effect on their learning motivation, self-efficacy, and goal orientation. Software education program followed the main stages of ADDIE model and was designed into experience Sharing, Requirements analysis, Sharing, Grouping, and Organizing. 20 of 6th graders in education welfare priority support programs were chosen as subject for software education program. The effectiveness has been analyzed through pre, and pro test. As a result of the analysis, we found that the developed software education program has meaningful effect on Learning Motivation, Self-efficacy, and Goal Orientation of education welfare priority support program's elementary students.

A Novel Cross-Layer Dynamic Integrated Priority-Computing Scheme for 3G+ Systems

  • Wang, Weidong;Wang, Zongwen;Zhao, Xinlei;Zhang, Yinghai;Zhou, Yao
    • Journal of Communications and Networks
    • /
    • v.14 no.1
    • /
    • pp.15-20
    • /
    • 2012
  • As Internet protocol and wireless communications have developed, the number of different types of mobile services has increased gradually. Existing priority-computing schemes cannot satisfy the dynamic requirements of supporting multiple services in future wireless communication systems, because the currently used factors, mainly user priority, are relatively simple and lack relevancy. To solve this problem and provide the desired complexity, dynamic behavior, and fairness features of 3G and beyond 3G mobile communication systems, this paper proposes a novel cross-layer dynamic integrated priority-computing scheme that computes the priority based on a variety of factors, including quality of service requirements, subscriber call types, waiting time, movement mode, and traffic load from the corresponding layers. It is observed from simulation results that the proposed dynamic integrated priority scheme provides enhanced performance.

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.

A Priority Analysis on Influential Factors for Software Bid Evaluation in Public Sectors based on Analytic Hierarchy Process(AHP) (AHP 기법을 활용한 소프트웨어 제안평가요인의 상대적 중요도에 관한 연구 : 발주자와 수주자 비교를 중심으로)

  • Kim, Hong Jin;Jo, Dong Hyuk;Ahn, Tae Ho
    • Journal of Information Technology Services
    • /
    • v.16 no.1
    • /
    • pp.41-53
    • /
    • 2017
  • Recently, due to the economic recession and increase of ITO (IT Outsourcing), bidding in software industry has been recognized as more competitive and the importance of software bid evaluation for corporate selection is being increased. This study aims to analyze and prioritize influential factors in the software bid evaluation criteria which is adopted as the main evaluation model of national software businesses by Ministry of Science. The priority was developed by AHP (Analytic Hierarchy Process) through pair-wise comparison. For the analysis, this study developed analysis model for AHP and conducted survey of experts who have work experience for more than 10 years in the IT industry. As the result of analysis, weighted factors in the evaluation criteria were deduced and differences of priority factors between purchaser and bidder were investigated. The analysis showed differences of view point in the bidding process. With these results, this study suggests how to write a proposal strategically and effectively in perspective of the purchaser. It is expected that priority factors will be adopted in strategic proposals in both bidder and purchaser. For purchaser, the priority will be adopted to select reliable bidder. So, we expect that the priority factors will be used to get more values for both bidder and purchaser in their business atmosphere.

Development of the Priority Decision System for Redevelopment of Agricultural Reservoir (농업용저수지 재개발 우선순위 산정시스템 개발)

  • Kim, Hae-Do;Kim, Sun-Joo;Kim, Phil-Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.2
    • /
    • pp.45-52
    • /
    • 2011
  • This study is to develop a Priority Decision System for Redevelopment (PDSR) which is able to decide the priority for redevelopment of agricultural reservoirs. The major scopes of this research are to make the related GIS data like hydrologic unit map and other thematic maps to determine the suggested priority index (PI), and to develop the PDSR handling the GIS data and calculating weighing factors for the PI. In order to make the weighing factor decision module, the AHP technique was adopted. The result of the weighing factor calculation was showed PC (Possibility Criteria) and RC (Restriction Criteria) were 76% and 24% respectively. Which means that most of the specialist selected PC category prior to RC because of whom to mostly of major technique. So, in order to make more objective result, the selection of specialists is important like environmental activists or local residents and so on. The product from this research can provide more scientific support to decide the priority decision.

A Study on Criteria for investment Priority of Railway Project (철도건설 투자우선순위에 관한 연구)

  • Park, Il-Ha;Park, Yong-Gul;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF