• Title/Summary/Keyword: Principal Items of construction management

Search Result 6, Processing Time 0.024 seconds

Principal Items of Construction Management for Developing Construction Guide of Large Spatial Roof Construction (대공간 지붕공사 시공지침서 개발을 위한 중점관리항목 도출)

  • Cha, Min-Su;Lee, Myung-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.197-198
    • /
    • 2017
  • Large spatial construction needs to consider various construction management factors through the construction guide, including high-tech roofing works for creating large space without columns and erecting large spatial structure. However, the domestic large spatial construction relies on overseas construction technologies due to the lack of construction guide of large spatial construction and experience in similar type of project. To improve the problem, we deduced principal items of construction management considering characteristics of large spatial construction as a preliminary study for developing a construction guide.

  • PDF

Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.4
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.

Trend Analysis and Market Expansion Strategies for Overseas Civil and Architectural Projects (해외건설 토목 ${\cdot}$ 건축분야 수주패턴 분석 및 시장확대 전략에 관한 연구)

  • Choe, Seok-Jin;Kim, Du-Yeon;Han, Seung-Heon;Kim, Hyeong-Gwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.408-413
    • /
    • 2006
  • Recently, the economic trend of internal enterprises toward the world market appears to exceedingly associate with industrial plants. Such circumstance would limit the diversity of project items and cause various issues of extreme disproportion of overseas construction market at the same time. Consequently, it seems essential to inspect the present state of bookings in the civil engineering and construction fields including the service corps, regarding the former period (from the year 1990 to 1996), the depressed period (from 1997 to 2000), and the latter period of monetary crisis (from 2001 to July 2006), based on the critical situation in foreign exchange occurred in the late 1990's; also important to look into the shifts of the representative items in such fields by regional groups of principal nations throughout the world. Therefore, the current situation of bookings in overseas construction companies should be clarified, and ultimately, appropriate measures should be established.

  • PDF

A Risk Assessment Counterplan for Reducing the Accident Rates in Medium and Small sized Construction Sites (중·소규모 건설현장의 재해율 감소를 위한 위험성평가 방안)

  • Jang, Yun-Ra;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.90-100
    • /
    • 2018
  • Government needs a risk assessment method that is effective in preventing accidents as a part of the three principal projects of the government for protecting the people's lives for establishing preventative measures to prevent accidents in the construction sites, which accounted for more than half of all accidental mortality accidents, and promote the safety-oriented culture for making fundamental changes. Accidents at the medium and small sized construction sites accounted for 88.9% of the total construction accidents. The data indicates that improper management and lack of advanced safety measures due to the absence of a safety supervisor are the biggest problems. It is believed that active measures to evaluate and prevent risks at construction sites are necessary for preventing accidents in the medium and small sized construction sites. The objectives of this study is to identify the key risk items of common accident causes and propose a practical, preemptive, and improved risk assessment method by evaluating the problems in the safety management of construction sites for reducing the accident rate in the medium and small sized construction sites.

Construction and Validation of Infection Control Practice Scale for Dental Hygienist (치과위생사의 감염관리 실천도 측정도구의 개발과 타당화)

  • Cho, Young-Sik;Jun, Bo-Hye;Choi, Young-Suk
    • Journal of dental hygiene science
    • /
    • v.9 no.1
    • /
    • pp.53-59
    • /
    • 2009
  • Infection control is now recognized as an important quality indicator in dental health service setting. The purpose of this study was to develop and validate Dental Hygienist's Infection Control Practice Scale for quality management of dental health service in Korea. The data of 254 dental hygienists was subjected to exploratory factor analysis using SPSS 16.0 and confirmatory factor analysis using AMOS 16.0. The total items of preliminary scale were 21 items and 5 subscale. Principal component analysis was completed with Varimax rotation. The results show a change in factor structure from 5 factor solution to 4 factor solution. The confirmatory factor analysis confirmed the four subscales(Immunization and periodic tests, Clinical procedure, Handwashing, Personal protection) which have a total of 12 items. After the item deleted because factor loading was low, measured model was tested. The results of the measurement model indicated fit indices: $x^2$= 79.593(df = 38, 0 = 0.000), RMR = 0.045, GFI = 0.940, CFI = 0.904, AGFI = 0.896, NFI = 0.837, TLI = 0.861, RMSEA = 0.67. The squared correlation between four constructs were less than the average variance extracted(AVE) of four constructs. Multiple regression analysis was completed. Dependent variable was the perceived infection control practice by dental hygienist. Independent variables were four summated subscales(R = 0.552, $R^2$= 0.304, Adjusted $R^2$= 0.431, F = 25.813, p = 0.000). Unstandardized coefficients of three independent variables were statistically significant.

  • PDF