• Title/Summary/Keyword: Pretension method

Search Result 38, Processing Time 0.021 seconds

Pretension process control based on cable force observation values for prestressed space grid structures

  • Zhou, Zhen;Meng, Shao-Ping;Wu, Jing
    • Structural Engineering and Mechanics
    • /
    • v.34 no.6
    • /
    • pp.739-753
    • /
    • 2010
  • Pointing to the design requirement of prestressed space grid structure being the target cable force, the pretension scheme decision analysis method is studied when there's great difference between structural actual state and the analytical model. Based on recursive formulation of cable forces, the simulative recursive system for pretension process is established from the systematic viewpoint, including four kinds of parameters, i.e., system initial value (structural initial state), system input value (tensioning control force scheme), system state parameters (influence matrix of cable forces), system output value (pretension accomplishment). The system controllability depends on the system state parameters. Based on cable force observation values, the influence matrix for system state parameters can be calculated, making the system controllable. Next, the pretension scheme decision method based on cable force observation values can be formed on the basis of iterative calculation for recursive system. In this way, the tensioning control force scheme that can meet the design requirement when next cyclic supplemental tension finished is obtained. Engineering example analysis results show that the proposed method in this paper can reduce a lot of cyclic tensioning work and meanwhile the design requirement can be met.

Development and Field Application of Portable Tensioning System Using Segmental CFT Member (분절형 CFT부재를 이용한 이동식 프리텐션 제작대의 개발 및 활용)

  • Lee, Doo Sung;Kim, Tae Kyun;Lee, Sung Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.965-975
    • /
    • 2014
  • Pretension PSC (Prestressed Concrete) members are subjected to a certain limit of size as they are generally produced in the off-site plant and transferred to the site due to the large scale of the product on system. In this study, a portable pretensioning production system has been developed, which allow us to apply the pretension method on site. Considering that a 50m span PSC girder using the pretension method requires a pressing device to endure a large jacking force, the portable pretension production system has to ensure safety against such a large pretension jacking force. In this study, the portable pretensioning system to produce a 50m span pretension girder was manufactured by using CFT (Concrete Filled steel Tube) members. In order to understand the stability of the system and the behavior of the elements, a static loading test was conducted and the stability of the proposed portable pretensioning production system was confirmed. The developed portable pretension system was applied to several construction sites and was investigated the problems on site. During the pretension girder and slab members that was producted by this pretension system in construction site, it has be found the several advantages such as simple fabrication processes, reduction of prestress-loss, and a decrease of 15% compared with the fabrcation cost of post-tension girder. After due consideration of the problems, this portable pretension system will be improved.

Research on the support of larger broken gateway based on the combined arch theory

  • Yang, Hongyun;Liu, Yanbao;Li, Yong;Pan, Ruikai;Wang, Hui;Luo, Feng;Wang, Haiyang;Cao, Shugang
    • Geomechanics and Engineering
    • /
    • v.23 no.2
    • /
    • pp.93-102
    • /
    • 2020
  • The excavation broken zones (EBZ) of gateways is a significant factor in determining the stability of man-made opening. The EBZ of 55 gateways with variety geological conditions were measured using Ground Penetrating Radar (GPR). The results found that the greatly depth of EBZ, the smallest is 1.5 m and the deepest is 3.5 m. Experimental investigations were carried out in the laboratory and in the coal mine fields for applying the combined arch support theory to large EBZ. The studies found that resin bolts with high tensile strength and good bond force could provide high pretension force with bolt extensible anchorage method in the field. Furthermore, the recently invented torque amplifier could greatly improve the bolt pretension force in poor lithology. The FLAC3D numerical simulation found that the main diffusion sphere of pretension force was only in the free segment zone of the surrounding rock. Further analysis found that the initial load-bearing zone thickness of the combined arch structure in large EBZ could be expressed by the free segment length of bolt. The using of high mechanical property bolts and steel with high pretension force will clearly putting forward the bolt length selection rule based on the combined arch support theory.

Mechanical Behavior of Cable Net Structures Considering Sag Ratio (새그 비를 고려한 케이블 네트 구조물의 역학적 거동)

  • Park, Kang-Geun;Lee, Dong-Woo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.16 no.3
    • /
    • pp.47-58
    • /
    • 2016
  • Cable network system is a flexible lightweight structure which curved cables can transmit only tensile forces. The weight of cable roof dramatically can reduce when the length becomes large. The cable network system is too flexible, most cable systems are stabilized by pretension forces. The tensile force of cable system is greatly influenced by the sag ratio and pretension forces. Determining initial sag ratio of cable roof system is essential in a design process of cable structures. Final sag ratio and pretension depends on initial installed sag and on proper handling during installation. The design shape of cable system has an affect on the sag and pretension, and must be determined using well-defined design philosophy. This paper is carried out the comparative data of the deflection and tensile forces on the geometric non-linear analysis of cable network systems according to sag ratio. The study of cable network system is provided to technical informations for the design of a large span cable roof, analytical results are compared with the results of other researchers. Structural nonlinear analysis of systems having cable elements is relatively complex than other rigid structural systems because displacements are large as a reason of flexibility, initial prestress is applied to cables in order to increase the rigidity, and then divergence of nonlinear analysis occurs rather frequently. Therefore, cable network systems do not exhibit a typical nonlinear behavior, iterative method that can handle geometric nonlinearities are necessary.

A Structural Performance Test of a Full-scale Pretension PSC Girder (실물모형 프리텐션 PSC 거더의 구조성능 시험)

  • Kim, Tae Kyun;Lee, Doo Sung;Lee, Sung Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1741-1751
    • /
    • 2013
  • The main purpose of this study is to investigate the static behavior of a prestressed concrete (PSC) girder using pre-tension method. A 30m long full-scale pretension PSC girder is fabricated by the portable fabrication system and tested. All results have been compared to those obtained from F.E.A results. Deflections at the middle of girders have been measured for evaluation. Also, strains of concrete at the middle of span have been measured. From the results of experimental, the load when initial crack was developed was obtained to be 1.75 time the unfactered design load in the full-scale girder specimen. Also, the data of specimen are satisfied the desgin requirements of ductility on the Korea Bridge Design Specification(2010). In service state, the vertical deflection at center of test specimen when a initial crack was developed is satisfied the vertical deflection requirement under live load of the Korea Bridge Design Specification(2010). To verify the experimental results, we numerical analyze the test and confirmed that the data were similar with results from the test above. The pretension girder fabricated in site were found to have enough strength for safety under and after construction.

Stability Analysis and Design of the Pretension Soil Nailing System (프리텐션 쏘일네일링 시스템의 안정해석 및 설계)

  • Park Si-Sam;Kim Hong-Taek;Choi Young-Geun
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.7
    • /
    • pp.197-206
    • /
    • 2004
  • The ground anchor support system may not be occasionally used because of space limitations in urban excavation sites nearby the existing structures. In this case, soil nailing system with relatively short length of nails could be efficiently adopted as an alternative method. The general soil nailing support system, however, may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then could play important roles to reduce deformations mainly in the upper part of the nailed-soil excavation system as well as to improve local stability. In this study, a newly modified soil nailing technology named as the PSN (Pretension Soil Nailing), is developed to reduce both facing displacements and ground surface settlements in top-down excavation process as well as to increase the global stability. Up to now, the analytical procedure and design technique are proposed to evaluate maximum pretension force and stability of the PSN system. Also, proposed are techniques to determine the required thickness of a shotcrete facing and to estimate probability of a failure against the punching shear, Based on the proposed procedure and technique, effects of the radius of a influence circle and dilatancy angle on the thickness of a shotcrete facing, bonded length and safety factors are analyzed. In addition, effects of the reduction of deformations expected by pretension of the soil nails are examined in detail throughout an illustrative example and the $FLAC^{2D}$ program analysis. And a numerical approach is proposed PSN system using the shear strength reduction technique with the $FLAC^{2D}$ program.

Fabrication Technique and Structural Performance Verification of PSC U-Type Segment Girder Using On-Site Pretension Method (현장 프리텐션 긴장 방식 적용 PSC U형 분절 거더 제작 기술 및 구조 성능 검증)

  • Sangki Park;Jaehwan Kim;Dong-Woo Seo;Ki-Tae Park;Hyun-Ock Jang
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.3
    • /
    • pp.17-26
    • /
    • 2023
  • Prestressed Concrete (PSC) girders are divided into pre- and post-tension types as prestressing method, and I- and U-type as cross-sectional shape. There are both advantages and disadvantages depending on each prestressing method and cross-sectional shape, and each method is applied to bridge construction sites. In this study, a new girder design was attempted to develop that overcomes its shortcomings by using the pretension method and U-type cross sectional shape. Its structural performance was verified in this study. Pretension type girders are mainly manufactured in factories because they require a reaction arm and related facilities, and have the disadvantage of being limited in weight and span length for road transportation. In addition, in the case of the U-type cross-section, structural stability is very reliable during construction against overturning, but its own weight is relatively large comparing to I-type, and the post-tension method is mainly applied after on-site production. In this study, a PSC girder manufacturing method using the field pretension was proposed and a span length of 40 m real-scale test specimen was manufactured and verified its structural performance.

Optimum Design of Grid Structures with Pretension (초기인장력을 받은 그리드 구조물의 최적설계)

  • Kim, Dae-Hwan;Lee, Jae-Hong
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.1
    • /
    • pp.77-85
    • /
    • 2011
  • In this study, micro genetic algorithm is used to find an optimum cross section of grid structures with pretension. Design optimization of trusses consists of arriving at optimum sizes of cross-section and prestressing force parameters, when weight of the truss is minimum, satisfying a set of specified constraints. The present approach is verified by ten-bar truss example showing good agreements with previous results. Features of the proposed method, which help in modeling and application to optimal design of pretensioned truss structures, are demonstrated by solving a problem of seventy two bar truss structures. The minimum weight design of seventy two bar truss is performed for various magnitudes of pretension and optimal prestressing forces are also found for various configurations of pretensioned truss structures.

Investigating the supporting effect of rock bolts in varying anchoring methods in a tunnel

  • Wang, Hongtao;Li, Shucai;Wang, Qi;Wang, Dechao;Li, Weiteng;Liu, Ping;Li, Xiaojing;Chen, Yunjuan
    • Geomechanics and Engineering
    • /
    • v.19 no.6
    • /
    • pp.485-498
    • /
    • 2019
  • Pre-tensioned rock bolts can be classified into fully anchored, lengthening anchored and point anchored bolts based on the bond length of the resin or cement mortar inside the borehole. Bolts in varying anchoring methods may significantly affect the supporting effect of surrounding rock around a tunnel. However, thus far, the theoretical basis of selecting a proper anchoring method has not been thoroughly investigated. Based on this problem, 16 schemes were designed while incorporating the effects of anchoring length, pretension, bolt length, and spacing, and a systematic numerical experiment was performed in this paper. The distribution characteristics of the stress field in the surrounding rock, which corresponded to various anchoring scenarios, were obtained. Furthermore, an analytical approach for computing the active and passive strengthening index of the anchored surrounding rock is presented. A new fully anchoring method with pretension and matching technology are also provided. Then, an isolated loading model of the anchored surrounding rock was constructed. The physical simulation test for the bearing capacity of the model was performed with three schemes. Finally, the strengthening mechanism of varying anchoring methods was validated. The research findings in this paper may provide theoretical guidelines for the design and construction of bolting support in tunnels.

Elastoplastic FEM analysis of earthquake response for the field-bolt joints of a tower-crane mast

  • Ushio, Yoshitaka;Saruwatari, Tomoharu;Nagano, Yasuyuki
    • Advances in Computational Design
    • /
    • v.4 no.1
    • /
    • pp.53-72
    • /
    • 2019
  • Safety measures for tower cranes are extremely important among the seismic countermeasures at high-rise building construction sites. In particular, the collapse of a tower crane from a high position is a very serious catastrophe. An example of such an accident due to an earthquake is the case of the Taipei 101 Building (the author was the project director), which occurred on March 31, 2002. Failure of the bolted joints of the tower-crane mast was the direct cause of the collapse. Therefore, it is necessary to design for this eventuality and to take the necessary measures on construction sites. This can only be done by understanding the precise dynamic behavior of mast joints during an earthquake. Consequently, we created a new hybrid-element model (using beam, shell, and solid elements) that not only expressed the detailed behavior of the site joints of a tower-crane mast during an earthquake but also suppressed any increase in the total calculation time and revealed its behavior through computer simulations. Using the proposed structural model and simulation method, effective information for designing safe joints during earthquakes can be provided by considering workability (control of the bolt pretension axial force and other factors) and less construction cost. Notably, this analysis showed that the joint behavior of the initial pretension axial force of a bolt is considerably reduced after the axial force of the bolt exceeds the yield strength. A maximum decrease of 50% in the initial pretension axial force under the El Centro N-S Wave ($v_{max}=100cm/s$) was observed. Furthermore, this method can be applied to analyze the seismic responses of general temporary structures in construction sites.