• Title/Summary/Keyword: Pressure monitoring system

Search Result 543, Processing Time 0.026 seconds

Development of an automated system for water-hydraulic and leakage test of pressure vessels

  • Kim, Dong-Soo;Lee, Won-Hee
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.5 no.1
    • /
    • pp.55-59
    • /
    • 2004
  • This study developed a fully automated test system for pressure vessels, containing such as oxygen, nitrogen, which is widely used in many industries. The pressure vessel test has three major parts including weight measurement test, water-hydraulic test and leakage test followed by cleaning and drying. The control system for these tests consists of three parts: a PLC, a monitoring system and a database management system. The PLC oversees overall control of test machines, while the monitoring system measures and displays weight, pressure, flow etc. for every situations, and the database management system stores test data. These three modules are designed to communicate with one another at 1 Hz frequency alerting problematic situations to the operator. The system has gone through actual field tests for verification of performances.

Construction of a Pilot Headbox System and Pressure Monitoring Apparatus for the Development of High Speed Hydraulic Headboxes

  • Youn, Hye-Jung;Lee, Hak-Lae
    • Journal of Korea Technical Association of The Pulp and Paper Industry
    • /
    • v.35 no.5
    • /
    • pp.37-45
    • /
    • 2003
  • To investigate the influence of the design and operating parameters of the headbox on hydrodynamics, a pilot headbox system and pressure monitoring apparatus were constructed. The pilot headbox system consisted of a circulating water reservoir, centrifugal pump, distributor, turbulence generator and slice. The distributor was designed to function as a pressure attenuator. Flow rate to the headbox and MD and CD velocity profiles in the slice zone were monitored using an ultrasonic flowmeter and Pitot tubes, respectively. As the distance from the step diffusor increased, evener CD velocity profile was observed. Wall effect increased with the increase of the velocity. Flow stability in the headbox was evaluated by injecting a dye at the outlet of the distributor. Application of theoretical analysis based on CFD in designing headboxes is briefly discussed.

A Development of Blood Pressure and Blood Sugar Monitor Using the Bluetooth and Tele-monitoring System (블루투스를 이용한 혈압, 혈당 측정 단말기 제작 및 원격건강관리시스템 개발)

  • Hong, Seung-Beom;Kim, Sung-Jin;Lee, Won-Keun;Lee, Moo-Ho
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.80-83
    • /
    • 2008
  • We propose the tele-monitoring system to real-time medical signal system and implemented the blood-pressure and blood-sugar monitoring system with bluetooth communication system. And, it transmits patient's data blood pressure, blood sugar to doctor and doctor sends the result of medical treatment to patient's phone, hand-phone or PDA. We developed the measurer as portable type in order to non-restrained monitor.

  • PDF

Development of Volume Monitoring System Filled in Storage Space (저장공간에 채워진 부피 모니터링 시스템 개발)

  • Lee, Young Tae;Kwon, Ik Hyun
    • Journal of the Semiconductor & Display Technology
    • /
    • v.18 no.4
    • /
    • pp.129-133
    • /
    • 2019
  • In this paper, we developed a system to monitor the storage capacity of suction-type device such as vacuum cleaner or crop harvesters. The monitoring system consists of load cells and a differential pressure sensor which simultaneously monitor the weight and volume of the stock. Since weighing objects stored in storage containers alone cannot fully monitor the level of filling, more accurate monitoring can be achieved by monitoring volume and fusion with weight information. The volume was monitored using a phenomenon in which the flow rate of the inhaled air varies depending on the volume of the object filled in the storage container. In this paper, we developed a system to monitor the storage in three stages: low, medium and high.

Generalized Sidelobe Canceler for TPMS Interference Cancellation (TPMS 간섭제거를 위한 Generalized Sidelobe Canceler)

  • Park, Cheol;Hwang, Suk-Seung
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.22 no.5
    • /
    • pp.663-668
    • /
    • 2012
  • A TPMS(Tire Pressure Monitoring System) is a wireless communication system designed to monitor the pressure and temperature of pneumatic tires of a vehicle. In order to provide the aid in protecting a driver, this system reports tire pressure information to the driver of the vehicle. Since the wireless communication technique should be employed to transmit the TPMS data from each tire to signal processing unit in the vehicle, it suffers from interference signals from external electrical or electronics equipments. In this paper, we propose the TPMS interference cancellation technique based on GSC(Generalized Sidelobe Canceler), which does not have only the excellent performance like MVDR(Minimum-Variance-Distortionless-Response) but also has the low computational complexity comparing with MVDR. The performance of interference suppression is conformed by computer simulation examples.

On-line Monitoring of Tribology Parameters and Fault Diagnosis for Disc Brake System

  • Yang Zhao-Jian;Kim Seock-Sam
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.224-228
    • /
    • 2003
  • The basic Principles and methods of the on-line monitoring of tribology parameters (friction coefficient and wear allowance) and fault diagnosis for the hoist disc brake system were introduced, the method were based on the spring force and oil pressure of the brake system and the hoist kinematics parameters. The experiment on the monitoring and diagnosis of hoist brake system were carried out. The research results showed: the monitoring and diagnosis methods are feasible.

  • PDF

Design of ambulatory urodynamics monitoring system (휴대용 하부요로기능 검사 장치의 설계)

  • Lee, S.O.;Kim, K.S.;Yoon, D.Y.;Seo, J.H.;Song, C.G.
    • Proceedings of the KIEE Conference
    • /
    • 2005.05a
    • /
    • pp.48-50
    • /
    • 2005
  • Urodynamics describes a collection of tests designed to evaluate lower urinary tract function and can be performed using retrograde filling of the bladder within a room. In this study, we designed and calibrated the potable urodynamics monitoring system using DSP chip (TMS320VC33, Texas Instrument$^{TM}$, U.S.) and collected pressure and EMG using calibration kit (DPT9022K0122, Medtronics$^{TM}$, U.S.). This system can make patients more comportable and monitor spontaneous urination during daily life.

  • PDF

Comparative Analysis of Injection Molding Process by On-line Monitoring in Cylinder of Injection Molding Machine and in Cavity of Mold (사출성형기 실린더와 금형 캐비티의 실시간 모니터링을 이용한 사출성형공정 비교 분석)

  • Park, Hyung-Pi;Cha, Baeg-Soon;Tae, Jun-Sung;Choi, Jae-Hyuk;Rhee, Byung-Ohk
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.10
    • /
    • pp.1513-1519
    • /
    • 2010
  • Recently, on-line process monitoring systems using sensors are being extensively used to produce highquality products. However, the difficulty in installing the sensors within the mold in the cases of micro-molds, optical molds, and molds with complex structures is a serious disadvantage of such process monitoring systems. In this study, the quantitative index of a process monitoring system was evaluated with the mold cavity pressure and the nozzle pressure for the injection molding machine. In order to evaluate the effect of the nozzle pressure, we performed correlation analysis for the weight of the molded product. We also examined the control characteristics of the injection molding machine by analyzing the effect of multistage injection speed, holding pressure, and injection pressure limit on the process monitoring data.

Assessment on Aging Management of Delayed Neutron Monitoring System Tubing for Continued Operation of Wolsong Unit 1 (월성1호기 계속운전 관련 결함연료위치탐지계통 배관의 열화관리평가)

  • Song, Myung Ho;Kim, Hong Key;Lee, Young Ho
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.2
    • /
    • pp.14-20
    • /
    • 2011
  • The end of design lifetime for Wolsong unit 1 will be reached on 20th November in 2012. So the license renewal documents for the continuous operation of Wolsong unit 1 is under reviewing now. Major components of primary system such as pressure tubes, feeder pipes including delayed neutron monitoring system tubing are being replaced and many components of secondary system are also being repaired. In this paper, the assessment on the wear degradation of delayed neutron monitoring system tubing(on the other hand, DN tube was called) was performed for the ageing management of the same component. The wear defects of this component was one of causes that resulted in heavy water leakage accidents. Therefore design specifications of Wolsong uint 1 and heavy water leakage accidents of pressurized heavy water reactors were reviewed and causes of wear defect for DN tubes were analyzed. Wear propagation equations based on the heavy water leakage history were made and the proper repairing time was possible to be expected if the continued operation was considered. Finally design change items of DN tubes that were conducted for the long term operation of Wolsong unit 1 are introduced.

Study on Analysis for the Slope Monitoring Performance at the Whangryeong Mountain Site (황령산 사면 계측관리 분석에 관한 연구)

  • La Won Jin;Choi Jung Chan;Kim Kyung Soo;Cho Yong Chan
    • The Journal of Engineering Geology
    • /
    • v.14 no.4 s.41
    • /
    • pp.429-442
    • /
    • 2004
  • Landslide of the Whanpyeong Mountain which was occurred at Busan Metropolitan City in 1999 belongs to the category of plane failure. Automatic monitoring system to measure horizontal displacement, pore pressure change and load change has operating from reconstruction stage for evaluating rock slope stability (August, 2000$\~$Feburuary, 2002). As a result of the analysis on the monitoring performance data, it is suggested that infiltrated rain water from pound surface discharges rapidly through cut-slope because pressure head of water decreases rapidly after rainfall while rise of pore pressure is proportional to the amount of rain water. As a result of data analyses for inclinometers and load cells, it seems that slope is stablized be cause ground deformation is rarely detected. The areas especially similar to the study site where landslide is induced by heavy rain fall, change of pore pressure is rapidly analyzed using automatic monitoring system. Therefore, it is considered that automatic monitoring system is very effect for slope stability analysis on important cut-slopes.