• Title/Summary/Keyword: Preliminary study

Search Result 6,497, Processing Time 0.031 seconds

A Study on the Humanities-based Preliminary University Model : Focused on the P University (인문학 기반 예비대학 모델 연구: P 대학 사례를 중심으로)

  • Baik, Sangmi;Jeong, Seonho
    • Journal of the Korea Convergence Society
    • /
    • v.13 no.1
    • /
    • pp.357-364
    • /
    • 2022
  • This study aims to design a humanities model for preliminary universities using an online platform to develop and expand humanities thinking of preliminary university students. P University Expert Focus Group Interview and student surveys are conducted, and based on the analysis results, a preliminary university model suitable for the humanities field is proposed. Expert FGI suggested the necessity of human resources education to build an online platform-based preliminary university model and improve humanities capabilities. As a result of the student survey, it was found that a majority of the respondents had high interest in humanities and recognized the need for a humanities preliminary university. This study proposes a humanities-based preliminary university model that enables interactive communication in virtual space using the cross-platform Photo Server. The implication of this study is that it contributes to strengthening the humanities capabilities of preliminary university students by presenting an online platform preliminary university model that can respond to changes in the external environment. Since this study has a limitation in that it does not present examples of preliminary universities, it is necessary to verify the educational effect of platform-based ppreliminary university management in the future.

Preliminary Study on the Construction of Database for BIM-based preliminary estimate. (BIM 기반 개산견적을 위한 DB구축 기초연구)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

A Study on Contract Intention of Preliminary Founders andFranchise Headquarters (예비 창업자와 프랜차이즈 본사의 계약 의사에 관한 연구)

  • Jung, Jin-Woo
    • Culinary science and hospitality research
    • /
    • v.14 no.1
    • /
    • pp.39-55
    • /
    • 2008
  • The characteristics of preliminary founders has taken a part in deciding the structural elements of Franchise headquarters in the food service industry. Thus this study tries to show how preliminary founders have an impact on structural elements in franchise headquarters through demonstrative research on intention of contracting by characteristics of preliminary members. The result shows that the experience factor of a preliminary owner has significant relationships with the structural elements of headquarters. It was analyzed that the structural elements of franchise headquarters such as expert consulting, training support and use of sales guide influence contract intention. The characteristics of the preliminary founders have a major impact on investment, financing, expert consulting, educational support, and untilization of business guideline. The structural elements have a major impact on contract intention.

  • PDF

A Process Analysis on the Experiences of Preliminary Child Care Teachers in Child Care Practice (예비보육교사의 실습 경험에 관한 과정 분석)

  • You, Byoungye;Yang, Sungeun
    • Korean Journal of Childcare and Education
    • /
    • v.9 no.3
    • /
    • pp.95-119
    • /
    • 2013
  • The study uses a qualitative research method for an in-depth study on child care practice for preliminary child care teachers. The study shows firstly that prior to practice, a preliminary child care teacher expects to perform a dual role. The preliminary child care teacher conceives an unequal, vertical relationship with a practice guidance teacher and serves as someone between a teacher and a friend to children, while perceiving the facility head as a mediator and practice colleagues as companions. Secondly, the preliminary child care teacher performed a triple role, while the practice guidance teacher played the role of a preliminary child care teacher. A preliminary child care teacher has mutually supportive interaction with a practice guidance teacher and serves as someone between a teacher and a friend, while acting as an important supporter to the facility head and as an uncomfortable competitor to a practice colleague. Thirdly, when a practice is completed, a preliminary child care teacher feels satisfied and sorry, while emphasizing a balance between theory and practice in a curriculum. The purpose of the current study lies in figuring out the needs for child care practice for a preliminary child care teacher who is the subject in child care practice to suggest improvements for a qualitative enhancement of child care practice.

A Study on the Preliminary Design of Hull Form considering Viscuous Resistance (점성저항을 고려한 선형의 초기설계에 관한 연구)

  • 이경도
    • Journal of Ocean Engineering and Technology
    • /
    • v.14 no.2
    • /
    • pp.112-116
    • /
    • 2000
  • To determine a preliminary hull form with a minimum viscous resistance this study considers the systematic variations of full form and calculations of the viscous resistance for varied hull forms. A preliminary hull form can be determined from a parametric study of viscous resistance.

  • PDF

Development of a Framework for Estimating the Benefits of IT Projects : Focusing on Preliminary Feasibility Study (정보화 사업의 편익 추정 프레임워크 개발 : 정보화부문 예비타당성조사를 중심으로)

  • Lee, Chunghun
    • Journal of Information Technology Services
    • /
    • v.17 no.3
    • /
    • pp.101-115
    • /
    • 2018
  • In order to promote the IT business efficiently, the Preliminary Feasibility Study has been conducted since 2004. It is to verify the feasibility of a large-scale IT project in advance and to determine whether to reflect the budget. It is more difficult to analyze the benefits of the IT project than other projects, because the IT project is carried out by combining tangible and intangible assets and human resources. For this reason, the Standard Guideline for Preliminary Feasibility Study in the IT field suggests a framework to support in estimating the benefits of the IT project. However, it includes the following problems : 1) level discrepancy among the benefit categories, 2) lack of types of benefit items, 3) no consideration of benefit inducing factors. So the framework is facing a low utilization. This study develops a new framework through a three-step research process. The new framework can be used not only for preliminary feasibility studies but also for estimating the benefits of general IT projects.

The Analysis of Assessment Factors for Preliminary Feasibility Study of Dam Project in Korea (국책사업 예비타당성조사 평가항목별 중요도 분석 - 댐 개발사업을 중심으로 -)

  • Koo, Jakon;Lee, Muchoon
    • Journal of Environmental Impact Assessment
    • /
    • v.13 no.6
    • /
    • pp.307-314
    • /
    • 2004
  • Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.

A Study on the Effect of the Project of Examining the Chemist Contributing to the Quality of Human Life (인간의 삶의 질 증진에 공헌한 화학자 조사하기 프로젝트 수업의 효과)

  • Kim, Do-Wook
    • Journal of Korean Elementary Science Education
    • /
    • v.30 no.1
    • /
    • pp.71-82
    • /
    • 2011
  • The purpose of this study was to evaluate the change of chemistry-related attitude of preliminary teachers, after the project of examining chemists contributing to the quality of human life. One group pretest-posttest was used in this study as an experimental design. Before examining the chemist, few preliminary teachers have the knowledge about the chemist contributing to the quality of human life. After the project of examining the chemist, the affirmative awareness on the chemist on preliminary teachers is increased. This result shows that the project of examining the chemist contributing to quality of life can give to make the positive attitude of preliminary teachers on chemistry, and to apply the useful tool related to STS curriculum which is not described effectively in science or chemistry textbook.

A Study for Effectiveness of Preliminary Security Assessment on Online Game Service Domain (온라인게임 서비스 분야에 정보보호 사전진단 적용시 효과성에 관한 연구)

  • Yoo, Dong-Young;Seo, Dong-Nam;Kim, Huy-Kang;Choi, Jin-Young
    • Journal of Information Technology Services
    • /
    • v.10 no.2
    • /
    • pp.293-308
    • /
    • 2011
  • The preliminary security assessment is an information security process to analyze security weaknesses before beginning of services. Discovering security weakness through preliminary security assessment is highly required because it costs much when security incident occur in the middle of service operation. However, this assessment is not widely spread in the online game service domain yet. In this paper, we summarize the security risk existed in the online game service, and we classify the security requirements related to the each risk. Also, through the case study, we evaluated the effectiveness of preliminary security assessment in this domain. In addition, we suggest checklists that should be reviewed once in game-client side, network-side and game-server side for the purpose of security enhancement.

Preliminary Feasibility Study for Water Resources Policy Effect Analysis Direction (수자원분야 예비타당성 조사 정책효과 분석 방향)

  • Seong, Yeonjeong;Choi, Seungan;Kwon, Hyun-Han;Jung, Younghun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.14 no.3
    • /
    • pp.1-16
    • /
    • 2021
  • Recently, large-scale projects are required in the water resources sector considering safety and publicitythe due to uncertainty of securing water resources and changes in the ecological environment by climate change. Among these large-scale projects, the projects that fall under the preliminary feasibility study are determined by comprehensive analysis based on economic analysis, policy analysis, and balanced regional development analysis. However, most of the results of the preliminary feasibility study showed a tendency to depend heavily on economic analysis. For this reason, projects in non-metropolitan areas sometimes fail in the preliminary feasibility study. To supplement this point, the Korea Development Institute revised the standard guidelines for preliminary feasibility studies for water resources sector projects that place a high weight on policy feasibility analysis. Therefore, the objective of this study is to analyze the cases of the preliminary feasibility study conducted previously and to suggest the direction of policy analysis in the preliminary feasibility study for water resources sector projects. For this, we analyze preliminary feasibility studies conducted for 18 years from 2002 to 2019, and suggest direction of policy analysis method using the benefit items not included in the economic analysis.