• Title/Summary/Keyword: Preliminary Feasibility

Search Result 391, Processing Time 0.02 seconds

Trick or Treat? Equity Concerns in the Preliminary Feasibility Study of the Republic of Korea

  • LEE, JONGYEARN
    • KDI Journal of Economic Policy
    • /
    • v.42 no.4
    • /
    • pp.91-116
    • /
    • 2020
  • As a project appraisal tool, the preliminary feasibility study (PFS) has contributed to enhancing the efficiency of public investment decision-making in the Republic of Korea over the last two decades. To overcome the limitations of the efficiency-oriented cost-benefit analysis, the PFS accommodates equity concerns among regions, namely balanced regional development (BRD) analysis. This study attempts to gauge the contributions of BRD analysis to PFS results. Specifically, it addresses how effectively policy efforts to promote decision-making have been implemented in the PFS stage while also considering the balance between equity and efficiency in terms of the trade-off between them, the degree to which they influence the results, and whether the consideration of equity is in fact actually reflected in seriously underdeveloped regions as intended. The study finds that the PFS results over the last two decades have been largely in line with the background and policy objectives. Based on the findings of the study, needs for institutional improvement are suggested, including enhancements in the analysis of regional economic ripple effects and taking into account the psychological factors pertaining to the evaluators in the overall judgment.

Study on Standard Framework for Analyzing Government R&D Program: the case of Preliminary Feasibility Study on R&D Program (국가연구개발사업의 사전 분석틀 표준화 연구: 연구개발 부문 예비타당성조사 표준지침을 중심으로)

  • Ahn, Sang-Jin;Kim, Hye-Won;Lee, Yoon Been
    • Journal of Korea Technology Innovation Society
    • /
    • v.16 no.1
    • /
    • pp.176-198
    • /
    • 2013
  • Preliminary feasibility study(PFS) was introduced in 1999 by financial authority to encourage a cautious approach to new large-scale public investment project. As it applied cost-benefit analysis as prime measure for decision-making, various issues have been arisen concerning feasibility analysis on R&D programs. This work is intended to suggest standard approaches to be established in PFS on R&D program as follows: 1. The issue questions can be induced in a standard way by 15 representative questions and their correlation with evaluation criteria. 2. The analyzing strategy can be standardized by establishing standards for classification of R&D effects and R&D logic analysis.

  • PDF

Valuation of Public Data Using Stated Preference Method: The Case of Agriculture Soil Database (진술선호방법을 이용한 공공 데이터의 가치 평가: 농업토양정보 데이터베이스 사례)

  • Lee, Sang-Ho;Ha, Sung-Ho;Jeong, Ki-Ho
    • The Journal of Information Systems
    • /
    • v.27 no.4
    • /
    • pp.149-165
    • /
    • 2018
  • Purpose As Korean economy has been sluggish in recent years, firms' interest in publicly financed projects has increased due to the relatively increasing proportion in the economy. Since 1999, publicly financed projects in Korea need to undergo preliminary feasibility study to evaluate economic efficiency and policy quality if they are larger than a certain scale. The benefits of public projects are one of the most important factors in the preliminary feasibility study but are difficult to estimate due to their nature. Design/methodology/approach This study estimates the benefits of the agricultural soil information database, a public database in Korea. The method used in the study is the stated preference method which is formally used in Korea's preliminary feasibility study. Data are collected through surveys and a logit model is constructed to be estimated by the maximum likelihood estimation method. Findings As the first study evaluating a public database, this study can be used as a baseline in all public database projects developed in the future. In addition, this study can contribute to improving the understanding of both private companies and public organizations who are interested in the cost-benefit analysis and estimation procedure for the publicly financed projects.

Preliminary Feasibility Study on Wind and Solar Hybrid Power Systems based on Venturi Effects for Buildings (벤투리 효과를 활용한 도심형 건물용 하이브리드 풍력 및 태양광 발전 시스템 기초타당성 예비연구)

  • Suhyun Kim;Yoonsoo Kim;Sumin Park;Jihyeon An;Sanghun Lee
    • New & Renewable Energy
    • /
    • v.19 no.1
    • /
    • pp.22-30
    • /
    • 2023
  • Recently, the use of renewable energy has been increasing to achieve carbon neutrality. The concept of a zero-energy building is also attracting attention. In this study, a preliminary study was conducted to analyze the feasibility of a hybrid wind and solar power generation system between buildings that utilize the building wind generated by the Venturi effect. For this purpose, the wind speed and sunshine hours were monitored in the area where the building wind blows by the Venturi effect, and the power generation depending on system types, areas, and season was estimated. Consequently, the wind power generation system showed a larger amount of power per area than solar power. The wind power systems can generate larger power if wind power blades are installed along the height of the building. As a preliminary study, this study verified the feasibility of the system utilizing building wind and suggested follow-up studies.

The Preliminary Feasibility on Big Data Analytic Application in Construction

  • Ko, Yongho;Han, Seungwoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.276-279
    • /
    • 2015
  • Along with the increase of the quantity of data in various industries, the construction industry has also developed various systems focusing on collecting data related to the construction performance such as productivity and costs achieved in construction job sites. Numerous researchers worldwide have been focusing on developing efficient methodologies to analyze such data. However, applications of such methodologies have shown serious limitations on practical applications due to lack of data and difficulty in finding appropriate analytic methodologies which were capable of implementing significant insights. With development of information technology, the new trend in analytic methodologies has been introduced and steeply developed with the new name of "big data analysis" in various fields in academia and industry. The new concept of big data can be applied for significant analysis on various formats of construction data such as structured, semi-structured, or non-structured formats. This study investigates preliminary application methods based on data collected from actual construction site. This preliminary investigation in this study expects to assess fundamental feasibility of big data analytic applications in construction.

  • PDF

A study on the status and improvement of preliminary feasibility study of culture and tourism projects (문화.관광부분사업의 예비타당성조사 실태분석 및 개선방안 연구 -운용관리비용 분석을 중심으로-)

  • Sun, Shu-Li;Kim, Ju-Hyung;Shin, Sung-Wooi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.129-138
    • /
    • 2007
  • According to the preceding research outcomes, feasibility studies on public construction projects were incorrect and subjective. To resolve the problems, Korean government initiated Preliminary Feasibility Study (PFS) system prior to undertaking the main feasibility study. The PSF can be categorized into four areas such as road, railroad, harbor, airport, and Culture & Tourism (C&T). Especially when it comes to complex due to the introduction of five-weekday working system and local $government^{\circ}{\phi}s$ self administrative system. As a result, the standardization and legislation of the PSF can not be operated effectively. Accordingly this paper seeks to 1) identify actual condition of conducted PSF in C&T; 2) set up analytical model considering cost factor of economical efficiency and seek obstacles of PSF system; 3) suggest improvement plan for construction PSF projects.

Improvement of Total Floor Area Planning for the Feasibility Study on the Establishment of a General Hospital - Focused on Pre-feasibility Study of KDI Case Analysis (종합병원 건립 타당성 조사의 연면적 계획 개선방안 - 공공의료기관 재정사업 예비타당성조사 사례를 중심으로)

  • Cho, Junyoung
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.30 no.1
    • /
    • pp.37-44
    • /
    • 2024
  • Purpose: The planning of medical facilities involves formulating a comprehensive medical basic plan, translating it into spatial dimensions through a space program. Feasibility assessment often relies on empirical methods like floor area per bed. However, with the shift towards specialized medical concepts, proportional scaling to bed numbers is challenging. This study proposes scale planning improvements during the feasibility assessment stage for comprehensive hospitals, analyzing cases using area determination factors and standard areas based on medical resources. Methods: The Korean Development Institute's Public Investment Management Center (KDI) identified issues in the scale determination of medical facilities in the Preliminary Feasibility Study Guidelines and investigated alternative approaches for determining the scale of a case that passed the preliminary feasibility study in 2019. The study assessed the feasibility of applying individual factors to determine not only the number of beds but also the scale at the sector and department levels. Additionally, a statistical analysis was conducted to examine the correlation between the total number of beds and various area determination factors. Results: Results suggest a strong correlation between total beds and major equipment needs, but in hospitals with <500 beds, this correlation weakens. Ward section scale is better calculated per ward type, not just total beds. Outpatient department scale depends on specialists, influencing treatment room numbers. Medical personnel play a crucial role in determining the scale of sections like rehabilitation therapy rooms, operating rooms, dialysis rooms, and overall facility scale.

A Development of Quantitative Analysis Model for the Policy Analysis in Feasibility Study Using the Performance Assessment Method (성능평가기법을 활용한 타당성조사 정책적 분석단계의 정량적 의사결정모델 개발 - 복수대안의 타당성 평가를 중심으로 -)

  • Lim, Yong-Soo;Song, Hyun-Young;Jeong, Han-Kee;Jeong, Min-Chul;Kong, Jung-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.89-100
    • /
    • 2011
  • As an impactive factor on industries and national economy, The Social Overhead Capital(SOC) is major factor to determine the national competitiveness and the investment of SOC is essential for its economic growth. Accordingly, introduction of the preliminary feasibility study and establishment of legal institutionalization and evaluation system has been carried out and reviewed since 1999. Nevertheless of these efforts, basic problems such as lack of scientific method for investment evaluation and loss of effectiveness on feasibility studies are continuously being brought up. Moreover, as the preliminary study to improve the mentioned problems is mainly focused on the economic and estimated demand analysis, the study of policy analysis, the most important phase during a feasibility study, is still insufficient. Therefore, in this paper, a quantitative decision-making model, to which the performance assessment method of Value Engineering(VE) is applied, is developed and proposed to improve the policy analysis of (preliminary) feasibility study that requires combining with relative studies, to induce quantitative analysis method, and to contribute the improvement of value on the political aspect for SOC investment goals and use as a strategic decision-making method by systematic analysis.

Development of a Feasibility Evaluation Model for Apartment Remodeling with the Number of Households Increasing at the Preliminary Stage (노후공동주택 세대수증가형 리모델링 사업의 기획단계 사업성평가 모델 개발)

  • Koh, Won-kyung;Yoon, Jong-sik;Yu, Il-han;Shin, Dong-woo;Jung, Dae-woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.22-33
    • /
    • 2019
  • The government has steadily revised and developed laws and systems for activating remodeling of apartments in response to the problems of aged apartments. However, despite such efforts, remodeling has yet to be activated. For many reasons, this study noted that there were no tools for reasonable profitability judgements and decision making in the preliminary stages of the remodeling project. Thus, the feasibility evaluation model was developed. Generally, the profitability judgements are made after the conceptual design. However, decisions to drive remodeling projects are made at the preliminary stage. So a feasibility evaluation model is required at the preliminary stage. Accordingly, In this study, a feasibility evaluation model was developed for determining preliminary stage profitability. Construction costs, business expenses, financial expenses, and generally sales revenue were calculated using the initial available information and remodeling variables derived through the existing cases. Through this process, we developed an algorithm that can give an overview of the return on investment. In addition, the preliminary stage feasibility evaluation model developed was applied to three cases to verify the applicability of the model. Although applied in three cases, the difference between the model's forecast and actual case values is less than 5%, which is considered highly applicable. If cases are expanded in the future, it will be a useful tool that can be used in actual work. The feasibility evaluation model developed in this study will support decision making by union members, and if the model is applied in different regions, it will be expected to help local governments to understand the size of possible remodeling projects.