Kim, Min-Ho;Mun, Sang-Don;Kim, Hang-Young;Kim, Tae-Young
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.2
/
pp.605-610
/
2011
Soft ground improvement is essential to enhance strength of ground for construction in reclaimed land or shore. There are many method of soft ground improvement, and vertical drain method was widely used in many countries including korea. As vertical drain method is to plant many Prefabricated Vertical Drains in soft ground, it promotes consolidation and enhances strength. The PBD(Plastci Board Drain) that is excellent economy and workability was widely used in many countries as Prefabricated Vertical Drains. Construction quality of PBD is affected installation depth, pressure, perpendicularity. This paper describes the system developed that can automatically measure installation depth, pressure and perpendicularity for PBD. This system can reduce fraction defective of construction by auto faulty alarm and keeps the safety of operator by auto control system.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1998.10a
/
pp.376-381
/
1998
The large scaled field test by prefabricated vertical drains was performed to evaluate the superiority of vertical discharge capacity for drain materials through compare and analyze the time-settlement behavior with drain spacing and the compression index and consolidation coefficient obtained by laboratory experiments and field monitoring system 1. The relation of measurement settlement( $S_{m}$) versus design settlement( $S_{t}$) and measurement consolidation ratio( $U_{m}$) versus design consolidation ratio( $U_{t}$) were shown $S_{m}$=(1.0~l.1) $S_{t}$, $U_{m}$=(1.13~l.17) $U_{t}$, at 1.0m drain spacing and $S_{m}$=(0.7~0.8) $S_{t}$, $U_{m}$=(0.92~0.99) $U_{t}$ at 1.5m drain spacing, respectively. 2. The relation of field compression index( $C_{cfield}$) and virgin compression index( $V_{cclab}$) was shown $C_{cfield}$=(1.0~1.2) $V_{cclab}$, But it was nearly same value when considered the error with determination method of virgin compression index and prediction method of total settlement. 3. field consolidation coefficient was larger than laboratory consolidation coefficient, and the consolidation coefficient ratio( $C_{h}$/ $C_{v}$) were $C_{h}$=(2.4 ~ 3.0) $C_{v}$. $C_{h}$=(3.5 ~ 4.3) $C_{v}$ at 1.0m and 1.5m drain spacing and increased with increasing of drain spacingngasing of drain spacingng spacingng
Journal of the Korean Society of Environmental Restoration Technology
/
v.10
no.5
/
pp.76-86
/
2007
For the purpose of ground improvement by means of soil flushing systems. Incorporated technique with prefabricated vertical drains have been used for dewatering from fine-grained soils. The laboratory model tests were performed by using the flushing tracer solutions for silty soils and recorded the tracer concentration changes with the elapsed time and flow rates. A mathematical model for prediction of contaminant transport using the PVD technology has been developed. The clean-up times for the predictions on both soil condition indicate more of a sensitivity to the dispersivity parameter than to the extracted flow rate and vertical velocity parameters. Based on the results of the analyses, numerical analysis indicate that the most important factor to the in-situ soil remediation in prefabricated vertical drain system is the effective diameter of contaminated soil.
Proceedings of the Korean Fiber Society Conference
/
2003.10a
/
pp.105-105
/
2003
Theoretical studies have been performed for drainage and filtration characteristics, low consolidation rate of sandmat and prefabricated horizontal and vertical drain. Discussion on quality control and methodology, cost analysis for sandmat and prefabricated horizontal drains were performed.
Soil vapor extraction (SVE) is an effective and cost efficient method of removing volatile organic compounds (VOCs) and petroleum hydrocarbons from unsaturated soils. However, soil vapor extraction becomes ineffective in soils with low gas permeability, for example soils with air permeabilities less than 1 Darcy. The aim of this study is to investigate numerically the performance of a prefabricated vertical drain (PVD) as a SVE well, and the pattern of the induced air flow. A validated numerical model for a single PVD extraction well is developed based on the result of a well-designed laboratory model test. The validity of the simple analytical approach to determine air permeability based on the results of model tests is also discussed.
The remediation efficiency of the contaminant through laboratory experiment of the pilot scale was evaluated for the influence factors in the contaminated soils for the applicability of the prefabricated vertical drain system. It was performed numerical analysis by the method that the finite element and finite differences based on the drawn result about the remediation of contaminated soils. The parametric analysis for the applied parameter value was performed. In the pilot scale remediation experiment, as a result of evaluating with the minimum limit concentration ratio, in the case of dense and loose conditon, the remediation time was much longer. And the remediation efficiency was rapidly progressed as the time was elapsed. It was analyzed that the contaminant concentration is reduced around the extraction well as the contamination remediating rate by numerical analysis result as the time was elapsed.
PVD (Prefabricated Vertical drain) consists of filter and core. An effective PVD has two basic filtration functions ; first to retain soil particle ; and second, to allow water to pass from the soil into the PVD core without clogging or blinding. Clogging which reduces the permeability of the geotextile filter jacket is caused by fine particles penetrating into the geotextile filter jacket in relatively low permeability soil conditions. As clogging performance increases gradually, excess pore water flow from soil is resisted and finally consolidation delays. Current soil-geotextile filter system criteria are generally based on relationships between a representative pore size of the geotextile and particle size of the soil. In Korea, PVD geotextile filter system criteria have been applied by only testing AOS (Apparent Opening Size) of filters without evaluating the filtration and clogging performance on soil-geotexile filter systems. Therefore, the filtration tests on soil-geotexile filter systems were conducted in order to evaluate the filtration and clogging performance with 3 kinds of geotextile filters. On these tests, we have applied geotextile filter system criteria on PVD in ${\bigcirc}{\bigcirc}$ sites.
The disposal problem of waste lime which is a residual product of lime industry have caused a lots of arguments in the past few years. Further more, waste lime contains a high moisture content which causes the disposal of waste lime is a great difficulty. The purpose of this study is to investigate for the effective dewatering solutions by placing various prefabricated vertical drains. The moisture content and degree of consolidation, pore water pressure, changes of settlement, bearing capacity with various vertical drains in waste lime were analyzed. The laboratory test results indicate that PBD is 2 times higher than circular drain in coefficient of consolidation. Based on the laboratory test results, settlement, pore water pressure, and dewatering measurements are shown in similar tendency. It is considered that PBD can drain primitive pore water much efficiently. The picture of SEM shows that circular drain filter has a serious clogging problem in comparison with PBD. In conclusion, PBD holds a superiority in waste lime's ground improvement and dewatering pore water pressure from the waste lime sludge. Also, circular drain is desired for some modification in its filtering system.
Laboratory model tests were conducted to investigate the effect of surcharge loading rate on the magnitude of lateral displacement of prefabricated vertical drains (PVDs) improved deposit. The test results indicate that under the condition that the system had sufficient factor of safety (FS) ($FS{\geq}1.2$), for the similar model ground under the same total applied surcharge load, the lateral displacement increases with the increase of loading rate. The test results have been used to check the validity of a previously proposed method for predicting the maximum lateral displacement, and it shows that the data points are around the middle line of the predicted range, which supports the usefulness of the proposed method. The basic idea of the prediction method is an empirical relationship between the normalized lateral displacement (NLD) and a ration of load to the undrained shear strength of the deposit (RLS). The model test results offer some modifications of the NLD-RLS relationship: (1) instead of a bilinear relationship, NLD-RLS relationship may be entirely nonlinear; (2) the upper bound value of RLS for the proposed method can be used may be limited to 2.1 instead of the originally proposed value of 3.0.
Lee, Dal Won;Kang, Yea Mook;Kim, Seong Wan;Chee, In Taeg
Korean Journal of Agricultural Science
/
v.24
no.2
/
pp.145-155
/
1997
The large scaled field test by prefabricated vertical drains was performed to evaluate the superiority of vertical discharge capacity for drain materials through compare and analyze the time-settlement behavior with drain spacing and the compression index and consolidation coefficient obtained by laboratory experiments and field monitoring system. 1. The relation of measurement settlement($S_m$) versus design settlement($S_t$) and measurement consolidation ratio($U_m$) versus design consolidation ratio($U_t$) were shown $S_m=(1.0{\sim}1.1)S_t$, $U_m=(1.13{\sim}1.17)U_t$ at 1.0m drain spacing and $S_m=(0.7{\sim}0.8)S_t$, $U_m=(0.92{\sim}0.99)U_t$ at l.5m drain spacing, respectively. 2. The relation of field compressing index($C_{cfield}$) and virgin compression index($V_{cclab.}$) was shown $C_{cfield}=(1.0{\sim}1.2)V_{cclab.}$, But it was nearly same value when considered the error with determination method of virgin compression index and prediction method of total settlement. 3. Field consolidation coefficient was larger than laboratory consolidation coefficient, and the consolidation coefficient ratio($C_h/C_v$) were $C_h=(2.4{\sim}3.0)C_v$. $C_h=(3.5{\sim}4.3)C_v$ at 1.0m and 1.5m drain spacing and increased with increasing of drain spacing. 4. The evaluation of vertical discharge capacity with drain spacing from the results of the consolidation coefficient ratio showed largely superior in case the Mebra drain and Amer drain than other drain materials at 1.0m and 1.5m drain spacing, while the values showed nearly same value in case same drain spacing.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.