• Title/Summary/Keyword: Prefabricate House

Search Result 4, Processing Time 0.018 seconds

A Study on the Technical Development for the Exterior Wall System of Container House (컨테이너 하우스 외벽 구성 시스템 기술개발연구)

  • 김환식;백기영
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.2 no.2
    • /
    • pp.57-63
    • /
    • 2001
  • This paper aims at searching the attentiveness and method in planning. design and construction procedure of the container house system where container is used as core framework. For this. we try to produce researching fundamental materials for the construction performance and design standards of steel house, and finish the sample exterior wall system of the container house. By applying this sample system to the two case study of container housing construction we find out that there are considerable efnciency of the cost saving and catch up schedule compared with existing brick housing construction system. This study is significant in that it shows future direction of technical development and investment on the prefabricate housing market through development of the prefabricated container housing system.

  • PDF

Productivity Improvement Method of Wall Rebar Work in Apartment House Construction (공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구)

  • Kim, Min-Kyu;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

Analysis on Temporary Residential Prefabricated Modular Structure through Domestic Patent Case Study (국내 특허 사례 연구를 통한 임시 주거용 프리패브 모듈라 구조 분석)

  • Han, Hyun-Suk;Kang, Hee-Jung
    • Journal of Digital Convergence
    • /
    • v.17 no.11
    • /
    • pp.225-232
    • /
    • 2019
  • This study proposes a temporary residential prefab modular structure to provide residential space to displaced people after a disaster. Patent cases related to prefab structures are collected for related design implementations, and classified. Space in temporary residential prefab modular structures must consider factors such as "Expandability", "Assembly and Disassembly", "Built-in Structure", and "Energy Efficiency", and the cases are classified into "Detailed Assembly Modular Type", "Modular Expandable Type", and "Space Unit Expandable Type". Overseas patents cases will be collected and analyzed in future studies for providing the efficient way for mass production for the lowest production cost.

Analysis on Prefabricated Space Structure Based on Overseas Patent Case Study (해외 특허 사례 기반 프리패브 공간 구조 분석)

  • Han, Hyun-Suk
    • Journal of Digital Convergence
    • /
    • v.18 no.11
    • /
    • pp.207-214
    • /
    • 2020
  • This study analyzes the method for easily constructing a simple space in various environments. It also analyzes cases of modular prefab construction structures and explores various solutions and development directions that can form temporary residential spaces. This research intends to propose the diverse methods and solutions for constructing residential space for users' stable living environment in various unpredictable situations. This study amis to collect and analyze cases of various foreign patents related to the subject. With the analysis on the patents case, the prefab structures are mainly grouped into 4 types of 1) Assembly method using small parts, 2) Prefab module stacking method, 3) Space expansion method, and 4) Production methods of detailed elements. Based on the results, future research will inquire the lower cost and more efficient way of constructing prefab structure.