• Title/Summary/Keyword: Precast concrete-panel

Search Result 125, Processing Time 0.033 seconds

An Experimental Study II on the Bolted Connection between H-Beam and Precast-Concrete Column (PC 기둥-H형 강보의 볼트접합부에 관한 실험적 연구 II)

  • Han Dong-hoon;Park Soon-kyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.13-16
    • /
    • 2004
  • The PCS system, which consists of precast concrete column and steel beam, has been developed. The system is expected to achieve the effectiveness in the constructability and improve the structural performance under earthquake. New types of joint system for the panel zon and column connection has been developed in order to improve the shear strength capacity and rigidity of the of the system. The cyclic seismic test recommended by ACI was conducted to verify the structural performance of the system. As a test results, it is observed that the system satisfy most of the requirements by ACI criteria.

  • PDF

A Study on the Improvement of Multi-Layer Coating Method on Concrete Base (성형 콘크리트 복층마감도장 공법 개선에 관한 연구)

  • Kim, Chong-Weon;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.93-105
    • /
    • 2003
  • The Precast Concrete(PC) method was developed for a large production of a structure in Europe. Afterwards, this PC method has been applied to a structure and an outside Coating of buildings extensively. The outside Coating of the building applied this PC method is a method to put tiles or stones to base concrete. And there is a method to use paints for, so the expression of various patterns is possible. The Multi-Layer Coating is one of the methods to use paints. This Multi-Layer Coating method can show various designs of external appearance with Foam when it is made with the PC panel. Also, the paint film of the PC panel enables a splendid appearance, and a protective function of concrete is possible, too. Therefore, it makes good durability of the PC. Besides, maintenance is easy to manage because it is free from pollution when it uses metallic materials, stones, or any other materials. You might have no trouble in applying the Multi-Layer Coating method in order to save a merit of an outside Coating on the PC panel. However, the Multi-Layer Coating method used as a current outside Coating method has pollution and bad working environment because Oil Epoxy Resins have toxicity and flammability. Therefore, a lot of warnings are required for coating work in order to have appropriate quality because working hours are short, and production efficiency is low too. These reasons make the cost of construction of the Multi-Layer Coating method increase. And employers or designers may have problems in selecting this Multi-Layer Coating method. Therefore, the purpose of this study is to get activation of the Multi-Layer Coating method by offering improvement measures about the problems of the existing Multi-Layer Coating method.

Experimental Study for the Bending Behavior of Precast Concrete Panel and Composite Deck for Railway Bridge (철도교 바닥판용 프리캐스트 패널과 합성 바닥판의 휨거동에 대한 실험적 연구)

  • Seol, Dae-Ho;Lee, Kyoung-Chan;Youn, Seok-Goo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.21-31
    • /
    • 2018
  • This paper presents an experimental investigation on the structural performance of precast ribbed panel specimens and bridge deck specimens fabricated from the panels. The panel specimens are developed for permanent deck forms of railway bridges (PSC girder). The decks of railway bridges have short lengths compared with highway bridges. Therefore, precast panels for railway bridges are different from those of highway bridges. The precast panels have ribs designed for crack control at the bottom of the sections. Two kinds of specimens were examined: one with 400-mm width and one with 1200-mm width. Three specimens of each type were fabricated, and a total of 12 specimens were tested. In this test, the ultimate load, strain of the reinforcement and concrete, crack width, deformation, and slip were measured. The structural performance of the specimens was assessed using the Korea railway bridge design code and Eurocode. All specimens met the current design criteria for structural strength and serviceability.

The effect of the poor infilling of the underpouring in precast slab track system on structural behavior (프리캐스트 슬래브 궤도 시스템의 충전층 충전불량이 궤도구물의 구조적 안전성에 미치는 영향)

  • Kim, Yoo-Bong;Kang, Young-Jong;Moon, Do-Young;An, Ki-Hong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.256-260
    • /
    • 2010
  • It has been proved that precast slab track has advantage of rapid construction speed and good quality compared to in-situ concrete slab track. A korean precast slab track, which is named as a K-PST, was developed and had been installed on the embankment and explored on the air. The developed track system consists of precast track panel and underpouring layer which is made of cement-asphalt mortar. Consequently, poor filling of underpouring layer directly could affect on the long-term performance of the track system. As a preliminary study, the effect of the poor infilling of the underpouring in precasst slab track system on structural behavior was investigated through FEM analysis.

  • PDF

A Study on the Development of Assembling Soil Nailing Method and Its Applications (조립식 쏘일네일링 공법의 개발과 시험시공사례에 관한 연구)

  • Kwon, Young-Ho;Park, Shin-Young;Ryu, Jeong-Soo;Gang, In-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.113-120
    • /
    • 2005
  • Soil nailing system can be mentioned to a method of supporting as the shear strength of in-situ soils is increased by passive inclusions. In the general soil nailing system, facing walls are used in two kind of a lattice concrete block or a cast in placed concrete wall. A case of lattice concrete blocks is used in slow slopes greater than 1:0.7. Also, a case of a cast in placed concrete wall is used in steep slopes less than 1:0.5. The cast in placed concrete walls are constructed to 30cm thick together with a shotcrete facing. In this study, the assembling soil nailing method as a new soil nailing system is proposed. This method is constructed assembly using precast concrete panels. Therefore ability of the construction and quality of the facings can be modified than a usual soil nailing system. Also, this method can be obtained the effects that a global slope stability increase, as precast concrete panels is put on cutting face after excavating a slope.

  • PDF

Micro-Cracks Control of LB-DECK Using Polymer Cement Concrete (폴리머 시멘트 콘크리트를 이용한 LB-DECK의 미소균열 제어)

  • Lho, Byeong-Cheol;Choi, Jong-Yun;Cho, Gyu-Dae;Choi, Jong-Gwon
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.2
    • /
    • pp.103-109
    • /
    • 2012
  • Micro-cracks with a width less than 0.1 mm in precast concrete panels do not cause structural problem, but they can cause problems in long term durability and concrete surfaces aesthetic, requiring additional repair costs. In this paper, polymer cement concrete is used to increase flexural tensile strength and to prevent micro-cracks due to construction loads on LB-DECK panels. Using 5% polymer-cement ratio, the panel crack moment is increased by improving flexural tensile strength and controlling visible micro-cracks during construction stage of LB-DECK.

Study on Seismic Performance of Steel Structure with Precast Concrete Cladding Panel and Connector Considered as Structural Components (외부벽판과 연결부재를 구조요소로 취급한 경우 철골구조물의 내진성능에 관한 연구)

  • Byeon, Ji-Seok
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.2
    • /
    • pp.127-133
    • /
    • 2008
  • The purpose of this study is to investigate the seismic performance of both exterior precast concrete cladding panels and their connections on steel frame, when these cladding systems are considered as the structural components. The degrees of their participation of lateral stiffness to the main building are evaluated in terms of different heights of the cladding panels. Considering the cladding system as an integrated building provides additional lateral stiffness, as well as a mechanism for energy dissipation and this system can be used as one of an advanced passive seismic control system. Hysteresis behaviors of connectors are modeled and integrated into a nonlinear finite element analysis program, ABAQUS. The results show that connections play the most important role in structural cladding system and they improve seismic performance of overall building response.

Effects of Reinforcing Method Influnced to the Shear Strength of Vertical and Horizontal Joints in Precast Concrete Large Panel Structures -Focused on the Vertical Joints and Slab-Slab Type Horizontal Joints- (대형판조립식 구조 수직.수평접합부의 전단강도에 미치는 보강방법의 영향-수직접합부 및 슬래브-슬래브 수평접합부를 중심으로-)

  • Chung, Lan;Park, Hyun-Soo;Cho, Seung-Ho
    • Magazine of the Korea Concrete Institute
    • /
    • v.8 no.4
    • /
    • pp.171-179
    • /
    • 1996
  • A proposal of the basic fbrm on the design of joint parts that can increase the shear strength by the useful joint shapes of each member is intended. The vertical joint parameters are the number of' shear key and a variety of' reinfbrcement details and the horizontal joint paramctcrs arc t,hc number of shear key and the direction of' shear f'orcc. 10 PC panel vortical joint arid 12 PC panel horizontal joint specimens were tested to investigate the effects of these parameters. Test results show that : 1. The ductility of the test specimen that has the horizontal reinforcing steels is larger than that does not have. 2. The maximum resisting force of round bar specimen is similar to that of strand wire specimen under the condition of fixed horizontal displacement.

Shear Strength of the Vertical Joints in Precast Concrete Large Panel Structures (대형 콘크리트 판넬구조의 수직접합부 전단강도에 관한 연구)

  • 서수연;이원호;이리형
    • Magazine of the Korea Concrete Institute
    • /
    • v.6 no.1
    • /
    • pp.111-119
    • /
    • 1994
  • The strength of vertical joints of precast concrete large panel structures depends on the many factors, such as the bond strength of grout concrete (or mortar), the interlocking of the shear keys, the dowel action of horizontal bars. Many experimental studies have been conducted to in vestigate the shear strength of the vertical joints. In domestic, a few design formulas to predict shear strength of the vertical joint were proposed by some investigators, but formulas were based on limited experimental results. The objective of this paper is to propose a suitable formula for the shear strength of vertical joints with 94 vertical joints experimental data using the modified Mohr-Coulomb's 4ield theory and regression analysis. From the comparison of the proposed formula with others, it is shown that the proposed formula can be used economically for the design of vertical joints.

An Experimental Study on Reinforced Effect Using Double Adhensive Panels in Bridge Deck Slabs (프리케스트판을 이용한 교량상판 단면증설 보강공법에 관한 실험적 연구)

  • 박정기;하경민;지한상;김은겸
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.791-796
    • /
    • 2000
  • Purpose of this study is to analyze the characteristics and reinforcement effects of restored the RC bridge deck with small precast panel through static load tests and to provide the basic information for the damaged slab decks. In the tests for realizing movement of general RC bridge slabs, 6 samples are prepared and tested. All reinforced samples are restored with 1 or 2-layers precast panels by epoxy mortar. The movement of restored slabs is analyzed and compared with the behavior of non-restored slabs. In result of these tests, tension cracks due to bending moment are show, and after static load test there happens finally a punching shear failure, which is the general type of RC bridge failure. The tests show that restoration of the RC slab results in increasing of loading capacity about 30~50% an restoring panels are stick to slab and moving with slab under loading test.

  • PDF