A Tunnel Blasting Method Favorable to the Environment, which Utilizes Pre-splitting & an Upper Center Cut. (선균열과 상부 심빼기를 이용한 환경 친화적 터널발파공법)

  • 김일중;김영석;기경철
    • Explosives and Blasting
    • /
    • v.20 no.2
    • /
    • pp.7-19
    • /
    • 2002
  • The cut is placed high up in the section, the 1st sloping holes below the cut, and divided all the holes located below the 1st sloping holes into a certain area with longitudinal section, to lower pollution made from tunnel blasting. With the sequential blasting machine, after I first blasted holes around the cut holes by a pre-splitting method, blasted the cut area and the 1st sloping holes. The 1st and 2nd sloping holes divided areas are initiated gradually to free face upwards made by the cut. Especially, I pre-splinted contour holes previous blast the before sloping holes from the contours. The ground vibration from the earth surface just over the advance face decreased about 42.0% compare with the down blasting method under the condition of equal charge weight per delay. I controlled the crack and over break of the mother rock by pre-splitting contour holes before blast the first sloping holes from the contours. The peak values of noise and air blast by blasting decreased about 10dB more than the down blasting method. the noise and air blast diminished gradually as a round. The throw distance of the fly rock was decreased about 55%.

A Study on Applicability of Pre-splitting Blasting Method According to Joint Frequency Characteristics in Rock Slope (암반사면의 절리빈도 특성에 따른 프리스플리팅 발파공법의 적용성 연구)

  • Kim, Shin;Lee, Seung-Joong;Choi, Sung-O.
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.1-16
    • /
    • 2010
  • This study focuses on the phenomenon that the blast damaged zone developed on rock slope surfaces can be affected by joint characteristics rather than by explosive power when the pre-splitting is applied to excavate a jointed rock slope. The characteristics of rock joints on a slope were investigated and categorized them into 4 cases. Also an image processing system has been used for comparing the distribution pattern of rock blocks. From this investigation, it was found that the rock blocks bigger than 2,000 mm occupied 42% in the case of single joint set and it showed the well efficiency of pre-splitting blast. In cases of 2~3 parallel joint sets and 2~3 intersecting joint sets are developed on rock surfaces, the rock blocks in the range of 1,000~2,000 mm occupied 43.6% and 35.8%, respectively, and it showed that the efficiency of pre-splitting was decreased. When more than 3 joint sets are randomly developed, however, the rock blocks in the range of 250~500 mm occupied 35% and there was no block bigger than 1,000 mm. This denotes that the blasting with pre-splitting was not effective. The numerical analysis using PFC2D showed that the blast damaged zone in a rock mass could be directly influenced by the pre-splitting. It is, therefore, required to investigate the discontinuity pattern on rock surfaces in advance, when the pre-splitting method is applied to excavate jointed rock slopes and to apply a flexible blating design with a consideration of the joint characteristics.

A Study on the Crack-propagation Mechanism of Pre-splitting Method with Consideration of Stress Field (응력장을 고려한 프리스플리팅 공법의 균열발생 원리에 대한 연구)

  • Yoon, Ji-Sun;Woo, Taek-Gyu;Kim, Min-Woo;Jang, Young-Min
    • Explosives and Blasting
    • /
    • v.27 no.2
    • /
    • pp.1-11
    • /
    • 2009
  • Abstract By investigating the stress redistribution caused by the preceding cut blasting when applying the pre-splitting method to tunnel round, an attempt was made to find conditions that were favorable for the propagation of cracks in contour holes. The investigation of the direction of minor principal stress in the numerical analysis revealed that the most significant factor affecting the change of the direction was the loading condition, while the core shape, rock type, and tunnel depth seemed to be less important in determining the direction of minor principal stress. Moreover, the number of cracks tended to increase with the increase of deviatoric stress. Through the model test of pre-splitting, it is confirmed that the pre-splitting method taking the stress field into account can reduce the extent of yield zone and has advantage in controlling the direction of crack than the conventional one.

A Study on the Vibration Propagation Characteristics of Controlled Blasting Methods and Explosives in Tunnelling (터널 제어발파 공법 및 화약류의 진동전달 특성에 관한 연구)

  • Jung, Hyuksang;Jung, Kyoungsik;Mun, Hongnyeon;Chun, Byungsik;Park, Duhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.2
    • /
    • pp.5-14
    • /
    • 2011
  • The most common problem encountered in domestic tunnel construction sites are solving public resentments caused by damage to adjacent structures and buildings. The most effective excavation method in rock tunnelling is the drilling and blasting, which is the main cause of vibration resulting in the public resentments. In this study, numerical analysis is conducted to compare the vibration reduction effect of line drilling and pre-splitting methods. Furthermore, the numerical simulations are verified and the results are quantified. Finally, various combinations of explosives used in controlled blasting are used and the vibration reduction effects are evaluated, thereby proving the applicability of the controlled blasting for reduction of vibration in tunnelling.

The Construction of Seoul Subway Line 3 and 4

  • Huh, Ginn
    • Journal of the Korean Professional Engineers Association
    • /
    • v.18 no.3
    • /
    • pp.1-20
    • /
    • 1985
  • The traffic congestion of Seoul city has been one of the most serious problems to be settled since the advent of 1970s. As a means to mitigate traffic mess, the authority concerned launched the construction of subway line 3 and 4 in 1980. The two Subway lines slated for completion by 1985 cross each other and run north-south direction, passing through the metropolitan area of Seoul city fraught with high-rise edifices and large-scale shopping centers, and, in order to reduce blasting vibration, NATM was executed for a distance of 10 Km, instead of ASSM previously employed when subway line 1 and 2 were constructed. Tunnel blastings were implemented, preceded by classifying the rocks at construction area into five categories, namely, hard rock, semi-hard rock, weak rock weathered rock and silt and by calculating their respective specific charges through standard test blastings, by employing the pre-splitting and smooth blasting with drilling patterns of burn cut type, so as not to cause damages to surface structures. Most of explosives used were the slurry of low specific gravity and low velocity, and the firings executed by the use of milli-second detonators. Empiric formula were also formulated to check blasting vibrations, based on the vibration allowable values of West Germany standard, for the application to vulnerable construction zones. Should the two lines be placed for public service in 1985, about 40% of the total traffic population of Seoul city amounting to 15 million as of 1984 is estimated to be carried by subway with no difficulties.

  • PDF

The Circular Center Cut with Large Empty Hole & Pre-Splitting in Tunnel Blasting (터널에서 대구경 무장약공과 선균열을 이용한 심빼기 공법에 관한 연구)

  • 김재홍;임한욱
    • Tunnel and Underground Space
    • /
    • v.11 no.3
    • /
    • pp.248-256
    • /
    • 2001
  • The cylindrical cut is most frequently used in tunnel blast regardless of their dimensions. In this study the new parallel cut is proposed to raise advance per round, which is considered to be an elevation of the traditional cylinder cuts. The general geometric pattern of a new cut with parallel blast holes is proposed. The detailed burden and spacing between the central blasthole and those of the four section are also given. The blast results between new cut and traditional cylinder cut are given. The main results of this study are as follows. 1) The average advances per rounds in new cuts can reach 99.5% of drilling length. That of traditional cylinder cuts are known approximately 90∼95% 2) Specific charge weight of new cut compare to that of cylinder cut is approximately reduced 5% from 1.363 to 1.297 kg/㎥ 3) Specific drilling rate is also reduced 8% from 2.393 to 2.130 m/㎥ 4) Vibrations, fly rock, and fragmentation produced by the new blast are to be proved superior to those of the traditional cylinder cuts.

  • PDF

Stability Assessment on the Final Pit Slope in S Limestone Mine (S 석회석광산에서의 최종 잔벽사면의 안정성 평가)

  • Sun, Woo-Choon;Lee, Yun-Su;Kim, Hyun-Woo;Lee, Byung-Joo
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.99-109
    • /
    • 2013
  • The slopes of open-pit mine are typically designed without considering the reinforcement and support method due to the economical efficiency. However, the long-term stability of final pit slope is needed in some case, therefore the appropriate measures that can improve the stability are required. In this study, the field survey and laboratory test were carried out in S limestone mine. The stability assessment of final pit slope was performed through the stereographic projection method, SMR, and numerical analysis. And countermeasures for stabilization were proposed. The results of analysis show that full scale of slope failure is not expected but the failures of bench slope scale are likely to occur. In oder to increase the stability of bench slope, we suggested the remedial methods as follows: excavating the final pit slope by pre-splitting blasting, placing the wide berm in the intermediate bench slope and installing the horizontal drainage hole in the place of local ground water runoff.