• Title/Summary/Keyword: Pre-qualification

Search Result 81, Processing Time 0.031 seconds

Database Modeling for Pre-qualification Management System (Pre-qualification 관리 시스템을 위한 데이터베이스 모델링)

  • Do, Namchul;Park, JongJin;Lee, Jeongyoul;Lee, Jae Hyun
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.6
    • /
    • pp.407-416
    • /
    • 2013
  • Acting an important risk management tool for main contractors, pre-qualification has served a key marketing tool for subcontractors in various industries. Current industrial environment has required the time intensive pre-qualification ability to small and medium-size subcontractors as a matter of competitive business. In order to support the subcontractors, this paper proposes a database model for pre-qualification management system (PQMS) that automates the pre-qualification process by using information technologies. The modeling process consists of specifications for its requirements, functional modules, and a database model for the PQMS.

Pre-qualification Test on 345kv XLPE Cable and Accessories (345kv XLPE절연 케이블의 장기 신뢰성 평가)

  • Kim, Jong-Won;Yu, In-Kee;Kim, Young;Lee, Ki-Soo;Choi, Bong-Nam;Yun, Duck-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2002.07c
    • /
    • pp.1727-1729
    • /
    • 2002
  • To cope with increasing of electric power demand in metropolitan areas, large capacity underground power cables are needed. Under such situations, our company has developed 345kV XLPE insulated cable and accessories. As the final step of development of the 345kV XLPE cable and accessories, the pre-qualification test was carried out on the test line composed of cables, pre-fabricated joints, EB-Gs and EB-As. This paper sums up the pre-qualification test conditions and the results.

  • PDF

A Study on the Problem and Countermeasure of Concealment of Industrial Accident in Construction Site (건설업 산재 은폐의 문제점과 대책에 관한 연구)

  • Choi, Man-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.29-33
    • /
    • 2008
  • According to statistics released by the Ministry of Labor for the past 6 years, work-related accidents in the construction industry have been on the continued increase, resulting in social and economic losses that are difficult to determine at an exact amount. However, the number will likely get much bigger if unreported cases are included, considering the fact that the aforementioned statistics are based soley on the applications filed with Korea Workers' Compensation and Welfare Service. The practice of businesses choosing not to report and dealing with industrial accidents in an unauthorized manner is defined as "concealment of industrial accident". The reason the employers tend to engage in the concealment practice even at their huge cost is a "pre-qualification" scheme for the applicants in the government procurement process. Under the pre-qualification scheme, the applicants with a high rate of industrial accidents receive a low grade and become less attractive candidates in the procurement process, thus losing an opportunity to win a contract. Such failure relates directly to the fate of business organizations, to survive or not. That is why they are making all-out efforts to obtain a high grade in the pre-qualification evaluation. With regard to the accident-concealment problem, the following can be mentioned as preventive measures: (1) To exclude a rate of industrial accidents from the pre-qualification scheme; (2) To strengthen the institution of imposing penalties on the occurrence of industrial accidents; (3) To introduce private insurance system to the current industrial accident compensation insurance; and (4) To give non-recognition treatment to industrial accidents that were not reported upon occurrence. In conclusion, the concealment problem can be resolved if the aforementioned measures are to be taken continuously along with corrective measures against institutional deficiencies.

Design of Reliability Qualification Test Based on Performance Distribution at the Earlier Stage (초기 단계의 성능분포를 활용한 신뢰성 인증시험의 설계)

  • Jeong, Hai-Sung
    • Journal of Applied Reliability
    • /
    • v.12 no.3
    • /
    • pp.131-138
    • /
    • 2012
  • A design of reliability qualification test based on performance distribution is developed. In general, the performance of an item degrades as the time goes by and the failure of an item occurs when the performance degradation reaches the pre-determined critical level. This article considers the reliability qualification test based on a more tightened critical value at the earlier stage to reduce the evaluation testing time and cost. A numerical example is provided to illustrate how to use the developed reliability qualification test.

Pre-qualification based Application Contents Management Method for Smartphone (사전 검증 기법을 활용한 스마트폰용 애플리케이션 콘텐츠 관리 기법)

  • Park, Dae-Sik;Kwak, Jin
    • Journal of Korea Multimedia Society
    • /
    • v.13 no.11
    • /
    • pp.1677-1686
    • /
    • 2010
  • Application contents verifications and operations are essential for using a secure smart phone environment. In the existing smartphone environment, application verification was performed only in the application company and users has direct management application. However these application verification and management practices have been caused by a variety of security vulnerabilities. Therefore, we will analyze the security vulnerabilities in the existing methods and then we propose an application contents management of smart phone using pre-qualification method.

Design of Reliability Qualification Test based on Performance Distribution (성능분포에 기초한 신뢰성 인정시험 설계)

  • Kwon, Young-Il
    • Journal of Applied Reliability
    • /
    • v.10 no.1
    • /
    • pp.1-9
    • /
    • 2010
  • In general, the performance of a component degrades as time goes by and failure of a component occurs when the performance degradation reaches a pre-specified level. It is difficult to obtain the failure time distribution data or the necessary number of failure data especially for the metal or machine part. Thus, a design of reliability qualification test based on performance distribution is more effective than failure time distribution. In this study, a performance-based reliability qualification test is developed and a numerical example is provided to illustrate the use of the developed reliability qualification test. This approach could be applied to many kinds of metal or machine part whose magnitude of strength could not be evaluated during at any random points but judgement can be made by only failure of the part. Besides, it is also possible that any parts which have a similar failure characteristics could be applicable to the developed reliability qualification test.

A Study on the Method of Performance Qualification Test for GIL (가스절연송전선로(GIL) PQ시험 방안에 관한 연구)

  • Park, Hung-Sok;Han, Sang-Ok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.5
    • /
    • pp.1062-1067
    • /
    • 2011
  • As the expension of metropolis and increasing of housing site, GIL(Gas Insulated Line) comes to the fore as an alternative to overhead transmission line avoided by local resident. The certification and experimental test for the GIL is now in progress in under ground test lab, Go-chang. For the test, we propose a method of PQ(pre-qualification) test which is essential for development and field application in this paper. The test following this method take about 200 days or 300 days under the circumstances.

Introduction to the truck development for NYCT(New York City Transit) Truck Pre-Qualification (미국 뉴욕 지하철 사전기술인증(PQ)용 대차개발 소개)

  • Kang, Sung-Wook;Yang, Bang-Sub;Kim, Chul-Kun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1067-1072
    • /
    • 2008
  • The objective of this project is to get the qualification for participation in any procurement conducted by NYCT by proving Hyundai-Rotem's capability of truck development according to NYCT Pre-Qualification program. The scope of the PQ program is to develop the new fabricated truck from NYCT's old-fashioned casting truck and to operate the new fabricated truck in normal NYCT passenger service during 1 year. In this paper, the characteristics of the new fabricated truck in terms of design, manufacture and tests criteria are mainly introduced comparing with the domestic and European-style trucks.

  • PDF

The Management Method for Preventing Frequent Defect about Each Inspection Part from The Data Analysis of Pre-qualification of Residential Building Reconstruction (주택 재건축 예비평가 자료분석을 통한 분야별 주요결함 발생현황 및 유지관리방안 고찰)

  • Bae, Cheol-Hak;Lee, Sung-Ok;Ji, Myoung-Ho
    • Journal of the Korean housing association
    • /
    • v.21 no.6
    • /
    • pp.71-80
    • /
    • 2010
  • The purpose of this study is to classify defects of the residential building by analyzing the defect specified by prequalification of residential building reconstruction and to suggest the solution of the problem which can be arisen during each stage of plan, construction and maintenance. By sorting the main defects which is specified by pre-qualification of residential building reconstruction for three years from August 2006 to August 2009 into 4 catagories and analyzing the cause of the defects, we draw the way of maintenance to prevent the defects and make pleasant residential environment. The reason for the frequent defects from residential building is mainly deterioration. It occured on the finishing more than on the structure, which means that residents can find defects easier on the finishing than the structure and clear the demand for repair. The result of analyzing of pre-qualification of residential building reconstruction is that the defects mostly caused small, masonry constructed and lower apartment. The apartment which is not into legal right for maintenance naturally have more defects than the others. In conclusion, it is necessary to establish a law of obligation duty of the maintenance of small apartment.

Government Information Security System with ITS Product Pre-qualification (사전 검증을 통한 행정정보보호시스템 도입 방안)

  • Yeo, Sang-Soo;Lee, Dong-Bum;Kwak, Jin
    • Journal of Advanced Navigation Technology
    • /
    • v.13 no.5
    • /
    • pp.763-772
    • /
    • 2009
  • According as information-oriented society is propelled, development of various information security systems is achieved, and introduction of information security system is increasing for service offer securing from nation and public institution. In particular, government information system is increasing interest about security assessment service of government information system because verification about security is weighed first of all. Accordingly, study about various security assessment services is preceded in domestic and overseas. In this paper, analyze security assessment service of Britain and Canada, and we proposed about pre-qualification introduction plan of government information system that can offer user of nation and public institution reliability.

  • PDF