• Title/Summary/Keyword: Pre-construction

Search Result 1,192, Processing Time 0.023 seconds

Development of Rule-Set Definition for Architectural Design Code Checking based on BIM - for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information - (BIM 기반의 건축법규검토를 위한 룰셋 정의서 개발 - 장애인,노인,임산부 등의 편의증진 보장에 관한 법률 대상으로 -)

  • Kim, Yuri;Lee, Sang-Hya;Park, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.143-152
    • /
    • 2012
  • As the Public Procurement Service announced the compulsory of BIM adaption in every public construction from 2016, the importance of BIM is increasing. Besides, automatic code checking takes significance in terms of the quality control for BIM based design. In this study, rule-sets were defined for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information. Three analytic steps were suggested to shortlist the objective clauses from the entire code; the frequency analysis using project reviews for architectural code compliance, the clause analysis on quantifiability, and the analysis for model checking possibilities. The shortlisted clauses were transformed into the machine readable rule-set definition. A case study was conducted to verify the adaptiveness and consistency of rule-set definitions. In future study, it is required the methodologies of selecting objective clauses to be specified and its indicators to be quantified. Also case studies should be performed to determine the pre-conditions in modeling and to check interoperability issues and other possible errors in models.

A Study on Remote Analysis of Fire Gas Using Open Path FT-IR (개방형 적외선분석기를 사용한 원거리 화재발생가스 측정에 관한 연구)

  • Cho, Nam-Wook;Lee, In-Gu;Lee, Jong-Cheon
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.6
    • /
    • pp.39-45
    • /
    • 2013
  • The gas generated from the fire which is continuous until material is completely burned. We can analyze usual gas using chromatography analysis but it can not be applicated to analyze for the gas from the fire because which gas is enormously generated. Besides, chromatography analysis has the disadvantage that it can not continuously analyze the sample's representativness, gas from the fire, Fourier transform infrared spectroscopy, FT-IR, has been utilized for effective combustion gas analysis method in small-scale combustion and on-line analysis has been attempted continuously. However, continuous sampling of 3.5l/min can not be representativness of sample if the gas caused by a massive fire and space. And the gas sampling is practically impossible in such a case. In this study, we attempted remote analysis while overcoming the disadvantages of the current gas analysis by using an Open-Path Infrared Analyzer without pre-treatment of the sampling. For the remote analysis, quantitative analysis method was established regarding each combustion toxic gases. And we measured the gases from the fire that occurs in the real case.

Construction and Data Analysis of Test-bed by Hyperspectral Airborne Remote Sensing (초분광 항공원격탐사 테스트베드 구축 및 시험자료 획득)

  • Chang, Anjin;Kim, Yongil;Choi, Seokkeun;Han, Dongyeob;Choi, Jaewan;Kim, Yongmin;Han, Youkyung;Park, Honglyun;Wang, Biao;Lim, Heechang
    • Korean Journal of Remote Sensing
    • /
    • v.29 no.2
    • /
    • pp.161-172
    • /
    • 2013
  • The construction of hyperspectral test-bed dataset is essential for the effective performance of hyperspectral image for various applications. In this study, we analyzed the technical points for generating of optimal hyperspectral test-bed site for hyperspectral sensors and the efficiency of hyperspectral test-bed site. In this regard regions we analyzed existing construction techniques for generating test-bed site in domestic and foreign, and designed the test-bed site to acquire images from the airborne hyperspectral sensor. To produce a reference data from the image of constructed test-bed site, this study applied vicarious correction as a pre-processing and analyzed its efficiency. The result presented that it was ideal to use tarp for the vicarious correction, but it is possible to use the materials with constant spectral reflectance or with relatively low variance of spectral reflectance. The test-bed data taken in this study can be employed as the reference of domestic and foreign studies for hyperspectral image processing.

Simulation Methods Development for a Plant Unit Master Control Logic Using Simulink in MATLAB (매트랩 시뮬링크를 이용한 플랜트 유닛마스터 제어로직 시뮬레이션 기법 개발)

  • Yoon, Changsun;Hong, Yeon-Chan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.324-334
    • /
    • 2017
  • The simulators for a plant unit master control (UMC) developed by domestic or overseas researchers have been developed for operator-training purposes. UMC simulators normally constructed at the end of the plant construction, despite the UMC logics, should be simulated to pre-check many signal interfaces within the power generation systems. Because of the differences in construction schedule, it is difficult for logic designers or commissioning engineers to simulate the UMC logic during the design or commissioning stage. In this background, this paper proposes a simulation method that can be used easily by plant logic designers or operators in the MATLAB Simulink programming environment. The core of the UMC is realized with a unique simulation algorithm based on mathematical analysis and functional blocks combination. In addition, an integer-based configuration was proposed to realize the plant target value control for the equipment in the logic. With these simulation methods, functions, e.g., load distribution, high-low limitations, frequency compensation, etc. were simulated. The results showed that the plant UMC logic can be simulated in Simulink without a plant simulator. The various functions proposed in this paper can provide useful information about Simulink-based simulation design for plant logic designers or commissioning engineers during the power plant construction period.

A Study on the Rule of Warranty in the English Law of Marine Insurance (영국 해상보험법상 담보(warranty)에 관한 연구)

  • Shin, Gun-Hoon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.42
    • /
    • pp.275-305
    • /
    • 2009
  • Marine insurance contracts, which intended to provide indemnity against marine risks upon the payment of price, known as a premium, originated in Northern Italy in the late 12th and early 13th centuries. The law and practice were later introduced into England through the Continent. It is, therefore, quite exact that English and European marine insurance law have common roots. Nevertheless, significant divergences between English and European insurance systems occurred since the late 17th century, mainly due to different approaches adopted by English courts. The rule of warranty in English marine insurance was developed and clarified in the second part of the 18th century by Lord Mansfield, who laid the foundations of the modern English law of marine insurance, and developed different approaches, especially in the field of warranty in marine insurance law. Since the age of Lord Mansfield, English marine insurance law has a unique rule on warranty. This article is, therefore, designed to analyse the overall rule of the rule of warranty in English marine insurance law. The result of analysis are as following. First, warranties are incorporated to serve a very significant function in the law of insurance, that is, confining or determining the scope of the cover agreed by the insurer. From the insurer's point of view, such the function of warranties is crucial, because his liability, agreed on the contract of insurance, largely depend on in, and the warranties, incorporated in the contract play an essential role in assessing the risk. If the warranty is breached, the risk initially agreed is altered and that serves the reason why the insurer is allowed to discharge automatically further liability from the date of breach. Secondly, the term 'warranty' is used to describe a term of the contract in general and insurance contract law, but the breach of which affords different remedies between general contract law and insurance contract law. Thirdly, a express warranty may be in any form of words from which the intention to warrant is to be inferred. An express warranty must be included in, or written upon, the policy, or must be contained in some document incorporated by reference into the policy. It does not matter how this is done. Fourthly, a warranty is a condition precedent to the insurer's liability on the contract, and, therefore, once broken, the insurer automatically ceases to be liable. If the breach pre-dates the attachment of risk, the insurer will never put on risk, whereas if the breach occurs after inception of risk, the insurer remains liable for any losses within the scope of the policy, but has no liability for any subsequent losses. Finally, the requirements on the warranty must be determined in according to the rule of strict construction. As results, it is irrelevant: the reason that a certain warranty is introduced into the contract, whether the warranty is material to the insurer's decision to accept the contract, whether or not the warranty is irrelevant to the risk or a loss, the extent of compliance, that is, whether the requirements on the warranty is complied exactly or substantially, the unreasonableness or hardship of the rule of strict construction, and whether a breach of warranty has been remedied, and the warranty complied with, before loss.

  • PDF

Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project (메가프로젝트 기획/계획단계 VE적용을 위한 준비단계 수행방안)

  • Ha, Seung-Ryong;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.29-39
    • /
    • 2011
  • In Korea, many mixed-used development projects(MXD) in mega project size are currently active. As these mega projects require long-term construction and execution and involve by different subjects in different fields, their completion breeds various problems, such as conflicts among project participants due to their complicated interest relationships and inaccuracy in predicting the economic performance of the projects due to inappropriate facility capacity planning. To solve these problems, it is essential to apply value engineering (VE) at the planning phase of the project, which can result in the best possible cost reduction and improvement of project performance. However, not many projects are actually implementing VE because of the lack of available information, as well as the limitations due to uncertainty in the early period of project execution. Therefore, this study aimed at proposing VE Team Building, Quality Model Performance Indexes, Space Model so as to resolve common mega project problems and overcome VE application limitations at planning stage. The result of this study is expected that the data can be utilized as basic data to apply VE at the planning phase of the large complex projects.

Development and Evaluation of Patient Safety Reporting Promoting Education Program (환자안전보고 촉진 교육프로그램의 개발 및 평가)

  • Kim, Myoung-Soo;Kim, Yun-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.1
    • /
    • pp.284-295
    • /
    • 2012
  • The purpose of this study was to develop and evaluate patient safety reporting promoting strategy for nurses to improve nursing care quality. The process included three phase - construction, implementation and evaluation phase. Before the construction phase has two kinds of subcategories as analysis and verification. Analysis phase was consisted of literature review and field study, and verification was conducted by two specialist. At the construction phase, patient safety reporting system, educational materials, planning for public relation, and reward preparation were developed. After implementation during 12 weeks, we evaluated pre-post scores of satisfaction, stress of conscience, job performances. The participants were 51 nurses working for a hospitals. The program was developed and then administered to the experimental group for 12 weeks. One group pretest-posttest design was used for this study. Data were analyzed using descriptive analysis, paired t-test with the SPSS WIN 18.0 program. After the intervention, job performance scores improved significantly from 3.62 to 3.75(t=2.653, p=.009). But job stress didn't changed significantly(t=.785, p=.434). These strategy can be applied to many clinical setting that will be helpful to promote patient safety reporting for nurses.

The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - (플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로 -)

  • Lee, Do-yun;Choi, Chang-Hoon;Won, Seo-kyung;Cho, Moon-Young;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.3-11
    • /
    • 2016
  • Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.

The Relation between Pullout Load and Compressive Strength of Ultra-High-Strength Concrete (초고강도 콘크리트의 인발하중과 압축강도와의 관계)

  • Ko, Hune-Beom;Kim, Ki-Tae
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.17-24
    • /
    • 2018
  • The pullout test, a nondestructive testing(NDT), for pre-installed inserts is perhaps the most widely used technique to estimate the in-situ compressive strength of concrete. It measures the force needed to pullout a standardized metal insert embedded into concrete members. The pullout test was certified by the American Society for Testing and Materials(ASTM) and Canadian Standards Association(CSA) as a reliable method for determining the strength of concrete in concrete structures under construction. To easily estimate the strength of ultra-high-strength concrete, a simplified pullout tester, primarily composed of a standard 12mm bolt with a groove on the shaft as a break-off bolt, an insert nut, and a hydraulic oil pump without a load cell, was proposed. Four wall and two slab specimens were tested for two levels of concrete strength, 80MPa and 100MPa, using a simplified pullout tester with a load cell to verify the advantages of the pullout test and simplified pullout test. The compressive strength of concrete, pullout load, and the rupture of the break-off bolt were measured 11 times, day 1 to 7, 14, 21, 28, and 90. The correlation of the pullout load and the compressive strength of each specimen show a higher degree of reliability. Therefore, a simplified pullout test can be used to evaluate the in-place strength of ultra-high-strength concrete in structures. The prediction equation for the groove diameter of the break-off bolt(y) with the concrete strength(x) was proposed as y=0.0184x+5.4. The results described in this research confirm the simplified pullout's utility and potential for low cost, simplicity, and convenience.

Study on the Induced Interaction between Groundwater and Surface Water due to the Tunnel Construction (터널 건설에 따른 인근 하천 영향 평가를 위한 연구)

  • 김태희;김영식;하규철;김구영;고동찬;양인제;홍순택
    • The Journal of Engineering Geology
    • /
    • v.14 no.1
    • /
    • pp.81-91
    • /
    • 2004
  • The objective of this study is the evaluation of the tunneling effect on the goundwater-surface water interaction. The designed tunnel line is laid beneath the Hapo-cheon, which runs throughout the study area. And, the pre-evaluation of the tunnel-influence on the Gapo-cheon is urgently needed. However, it is very difficult to find out the similar domestic and/or foreign cases. In this study, the numerical modeling technique was not considered because of the insufficient data. Instead of the numerical modeling, the measurement and analysis of the stream flow rates 5 different points were adopted to evaluate the influence of the tunnel construction on the Gapo-cheon. Based on the analysis of flow monitoring data, it can be concluded that 39% of flow rate in Gapo-cheon is contributed by the groundwater discharge, as baseflow and the construction of tunnel can seriously decrease the flow rate in Gapo-cheon.