• 제목/요약/키워드: Pre-Checking

검색결과 104건 처리시간 0.03초

원지의 구조적 변화가 난연제의 정착과 난연 처리된 종이의 인화 특성에 미치는 영향(1) -충전제와 난연 전처리된 폴리에스테르 섬유의 효과 - (Effect of Substrate Structure on Flame Retardant Fixation and Ignition Characteristics of the Treated Paper(1) - Effect of filler and pre treated polyester fiber -)

  • 김병수;이승기;정현채
    • 펄프종이기술
    • /
    • 제34권2호
    • /
    • pp.42-46
    • /
    • 2002
  • Wallpaper has been used for decorating wall with multifarious patterns and colors. Ignition characteristic of wallpapers depends upon the types of wallpapers and their components. Since the wallpaper is made of flammable cellulose fibers diverse materials are being used as flame retardant in producing wallpapers. In this paper the ignition characteristics wallpapers prepared with three different fillers and pretreated polyester fibers were examined. Also the effect of calendering on ignition characteristics was investigated. Commercial papers were used for checking the effect of calendering on the ignition characteristics of treated paper In this experiments, guanidine sulfomate was used as flame retardant.

웹기반 멀티미디어 저작 시스템의 설계 및 구현 (Design and Implementation of the Web-based Mulimedia Authoring System)

  • 박영미;박종운;송한영;신현산;박두영;장종환
    • 한국컴퓨터산업학회논문지
    • /
    • 제3권2호
    • /
    • pp.243-258
    • /
    • 2002
  • 아이콘 기반의 저작 환경에서 멀티미디어 문서를 생성 및 편집할 수 있으며, 저작 과정에서의 오류 검증 및 피드백 기능, 사전실행 기능을 통하여 저작내용을 확인하면서 저작을 진행할 수 있고, 자료의 내부 구조를 트리구조로 채택하여 시간관계와 공간관계를 갖게 되는 미디어 객체들간의 상속성 표현기능을 사용하여 프리젠테이션에 참여하는 미디어 객체들간의 동기와 사용자 상호작용에 의한 비동기를 효율적으로 처리할 수 있는 웹기반 멀티미디어 저작 시스템을 구현하였다.

  • PDF

현수교의 지중정착식 앵커리지 설계 (The Design of Rock Anchored Anchorage of Suspension Bridge)

  • 안익균;김경택;박기웅;장학성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.629-640
    • /
    • 2008
  • South anchorage(AN1, Myodo side) of supension bridge between Myodo and Gwangyang is designed as rock anchorage with 36m anchor length using the resistance of rock mass in Myodo. Checking the overall stability of the anchorage, we considered rock joints, bedding planes, fault zones and condition of rock structure in situ by analysis results for photo-lineaments, aerial photograph interpretation and drill-hole logs are considered. This anchorage consists of an access shaft, adit, and the upper and lower concrete bearing plate to introduce pre-stressing force into rock mass.

  • PDF

Anaerobic Biodegradation of PCP in Japanese Paddy Soils

  • Kim, Hyo-Keun;Inoue, Yasushi;Handa, Yuko;Yasuta, Tsuyoshi;Lee, Kyu-Seung;Katayama, Arata
    • 한국환경농학회지
    • /
    • 제23권3호
    • /
    • pp.138-141
    • /
    • 2004
  • Seven soil samples were collected from paddy fields located nearby Nagoya city in Japan. All the soils were subjected to flooded condition and incubated with PCP at $30^{\circ}C$ for two months, and their anaerobic PCP degradation have been monitored by checking the PCP concentration of the soils at regular intervals. The degradation of PCP did not occur in the soils autoclaved two times before pre-incubation. On the other hand, all the soils showed significant PCP degradation in non-sterilized condition after 30 days of incubation, except far one soil sample (Yatomi), in which PCP was rarely degraded until 30 days of incubation. This result showed PCP disappearance in the pad(rf soils was mainly caused by microbiological activity, and depended upon the physicochemical characteristics of the soils.

비정돈 환경의 표면 소독을 위한 실현성 예측 기반의 장애물 제거 계획법 및 접촉식 방역 로봇 시스템 (Feasibility Prediction-Based Obstacle Removal Planning and Contactable Disinfection Robot System for Surface Disinfection in an Untidy Environment)

  • 강준수;이인제;정완균;김기훈
    • 로봇학회논문지
    • /
    • 제16권3호
    • /
    • pp.283-290
    • /
    • 2021
  • We propose a task and motion planning algorithm for clearing obstacles and wiping surfaces, which is essential for surface disinfection during the pathogen disinfection process. The proposed task and motion planning algorithm determines task parameters such as grasping pose and placement location during the planning process without using pre-specified or discretized values. Furthermore, to quickly inspect many unit motions, we propose a motion feasibility prediction algorithm consisting of collision checking and an SVM model for inverse mechanics and self-collision prediction. Planning time analysis shows that the feasibility prediction algorithm can significantly increase the planning speed and success rates in situations with multiple obstacles. Finally, we implemented a hierarchical control scheme to enable wiping motion while following a planner-generated joint trajectory. We verified our planning and control framework by conducted an obstacle-clearing and surface wiping experiment in a simulated disinfection environment.

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

Russian and Foreign Experience in Implementing Departmental Control and Prosecutor's Supervision when Verifying Crime Reports

  • Ivanov, Dmitriy Aleksandrovich;Moskovtseva, Kristina Andreevna;Bui, Thien Thuong;Sheveleva, Kseniya Vladimirovna;Vetskaya, Svetlana Anatolyevna
    • International Journal of Computer Science & Network Security
    • /
    • 제22권8호
    • /
    • pp.299-303
    • /
    • 2022
  • The article examines the stage of verification of a crime report from the standpoint of the need for its legislative regulation. Moreover, it investigates the international experience in this field. The existing procedural models are described in detail on the example of the neighboring and faraway countries. An analysis of the provisions of the current criminal procedure law of Russia and foreign experience allowed the authors to identify existing problems in the implementation of departmental control and prosecutorial supervision at the stage of verifying a crime report. The aim of the study is to develop theoretical provisions and recommendations regarding the implementation of departmental procedural control and prosecutorial supervision over the activities of the investigator during the verification of reports of crimes, based on the study of experience, both in Russia and in a number of countries of the near and far abroad, which could find their reflection in law enforcement practice, as well as aimed at improving the current criminal procedure legislation. The authors substantiated the theory that a detailed examination of the foreign procedural foundations of checking a crime report will allow us to form the most suitable model for checking a crime report for our state, taking into account all possible features and successfully implement it into the current criminal procedural law of the Russian Federation.

BIM 기반의 건축법규검토를 위한 룰셋 정의서 개발 - 장애인,노인,임산부 등의 편의증진 보장에 관한 법률 대상으로 - (Development of Rule-Set Definition for Architectural Design Code Checking based on BIM - for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information -)

  • 김유리;이상화;박상혁
    • 한국건설관리학회논문집
    • /
    • 제13권6호
    • /
    • pp.143-152
    • /
    • 2012
  • 조달청은 2016년부터 공공공사 전 사업으로 BIM 발주를 확대할 계획이어서 BIM 설계의 중요성이 증가하고 있다. 이에 따라, BIM 설계의 품질을 확보하는 방안 법규검토의 중요성 또한 증가하고 있다. 본 연구에서는 장애인 노인 임산부 등의 편의증진보장에 관한 법률을 대상으로 실무의 건축계획 과정에서 빈번하게 검토되는 항목을 중심으로 최적화된 룰셋 정의서를 개발하였다. 법규조항을 선정하는 과정으로는 프로젝트 법규검토서를 활용한 빈도 분석, 함수화 가능도 분석, 모델 검토 가능성 분석을 제시하였다. 모델 검토 시나리오 작성에 따라 룰셋 정의서를 개발하였으며, 실제 프로젝트에서 구현을 통해 적용성 및 정합성 분석을 수행하였다. 본 연구를 수행한 결과, 자동법규검토에서는 경제성 및 활용성을 확보할 수 있는 항목의 선정이 중요함을 확인할 수 있었다. 향후 연구에서는 대상 법규 조항 선정의 항목 세분화가 필요하며, 실무자 검증을 통해 좀 더 실질적인 항목 도출이 요구된다. 또한 자동법규검토에서 발생할 수 있는 모델링 요구사항, 소프트웨어 간 호환성 문제 등의 변수를 확인하고 룰셋의 논리를 검증하는 사례 연구가 수행되어야 한다.

답(沓) 이용도(利用度) 제고(提高)를 위(爲)한 조사(調査) 연구(硏究) (Investigation on the Efficient Utilization of Paddies in Korea)

  • 최범열;김영래;김문규;최창열;조재성;김달웅;김충수
    • 농업과학연구
    • /
    • 제2권1호
    • /
    • pp.151-177
    • /
    • 1975
  • 충남지방(忠南地方)의 답이용도(沓利用度) 제고(提高)를 위(爲)한 기초정보(基礎情報)를 얻기 위(爲)하여 충남(忠南)의 입지적(立地的)인 조건(條件)과 아울러 답이용현황(沓利用現況) 및 답이용도(沓利用度)의 제고(提高)를 조해(阻害)하는 요인(要人)을 분석(分析)하고 보다 생산성(生産性) 높은 작업(作業) 및 경종체계를 모색(摸索)하였던바 결과(結果)를 요약(要約)하면 다음과 같다. 1. 답전후작(沓前後作)을 기피(忌避)하는 일차적(一次的)인 원인(原因)은 논의 배수불량(排水不良)이었고 이차적(二次的)인 원인(原因)은 이앙기(移秧期)에 지장(支障)을 초래(招來)한다는 점(点)이었고 삼차적(三次的)인 원인(原因)은 노동력(勞動力) 부족(不足)이었다. 2. 답전후작(沓前後作)을 수행(遂行)하는 농가(農家)는 대부분영세농(大部分零細農)으로서 자가식량(自家食糧)을 대보를 위(爲)한 소규모재배(小規模栽培)가 많았으며 주작목(主作目)은 보리였다. 3. 충남(忠南)의 기조적(氣條的)인 조건(條件)을 고려(考慮)할 때 대체로 답전후작물(沓前後作物)의 수확기(收穫期)는 6월(月)10일(日)이 한계(限界)이며 수도(水稻)의 이앙기(移秧期)는 6월(月)25일(日)이 한계(限界)이다. 4. 답전후작(沓前後作)으로 보리를 파종(播種)할 경우(境遇) 경운전(耕耘前) 로타리살파(撒播)가 가장 능률적(能率的)이었을 뿐아니라 적은 경비(經費)가 소요(所要)되었다. 5 소득(所得)과 아울러 수확(收穫) 및 이앙작업소요기간(移秧作業所要期間)을 고려(考慮)할 경우(境遇) 일반적(一般的)으로 조생(早生)통일+올보리의 작부방식(作付方式)이 유리(有利)하였다.

  • PDF

예비유아교사들의 교재교구 제작 경험 탐색 (Investigating the pre-service early childhood teachers' experience of making teaching materials)

  • 박지선
    • 한국산학기술학회논문지
    • /
    • 제18권6호
    • /
    • pp.418-430
    • /
    • 2017
  • 본 연구는 2016년 1학기 유아교과교재 및 연구법 강의를 듣는 B대학교 유아교육과 학생 30명을 대상으로 예비유아교사들의 교재교구 제작 경험을 탐색해봄으로써 예비유아교사들의 교재교구 제작 과정에서 나타나는 다양한 경험과 그 과정에서의 어려움을 파악하고 예비유아교사를 위한 교재교구 제작 교육의 효율적인 방향과 방법을 모색하고자 하였다. 교재교구 제작과정은 탐색단계, 계획단계, 제작단계로 나누어 이루어졌다. 예비유아교사들은 교재교구 제작 탐색단계에서는 누리과정 교사용 지도서, 전공서적, 인터넷 자료 등 다양한 자료와 유치원 참관 경험을 활용하였으며, 계획단계에서는 유아의 흥미 및 수준을 최우선 고려하고, 충분하게 재료를 탐색하며 신중하게 제작방법을 선택하는 것으로 나타났다. 제작단계에서는 재 작업 방지를 위해 탄탄하게 기초작업을 하는가하면, 초기에 넘쳐났던 의욕에 비해 작업이 진행될수록 기본에 충실하려 하였다. 교재교구를 제작하면서 예비유아교사들이 경험하는 어려움으로는 특별함에 대한 부담감, 유아를 많이 경험해보지 못한 상태에서 상상으로 맞추어가는 것에 대한 어려움, 계획대로 안 될 때의 당혹감 그리고 친구와의 비교 안에서 상대적인 박탈감이 있는 것으로 나타났다. 그리고 이러한 어려움을 통해 꼼꼼한 계획과 철저하게 실행하는 것이 교재교구 제작에서 매우 중요하며, 제작 전과정에서 검토와 점검이 반복되어야 함을 깨달음으로써 효과적인 교재교구 제작을 위한 더 나은 발전방향을 찾아가고 있었다.