• Title/Summary/Keyword: Pre Design

Search Result 3,736, Processing Time 0.034 seconds

Analysis of Pre-Service Mathematics Teachers' Experience on Design Thinking based Teaching Practicum (예비수학교사들의 디자인 사고(Design Thinking) 기반 교육실습 활동 경험 분석)

  • Lee, Jiyon;Kim, Hoonjoo
    • Communications of Mathematical Education
    • /
    • v.34 no.3
    • /
    • pp.235-256
    • /
    • 2020
  • The purpose of this study was to investigate the experience of pre-service mathematics teachers who attended at a university course combined with teaching practicum based on design thinking process to identify the change of their awareness of its activities. For the research, 8 pre-service mathematics teachers participated in a mathematics major course, consisting of 5 phases of design thinking formed by Stanford d.school. In the end of the course, qualitative data were collected through individual and focus group interviews and the course activities. By data analysis, the results of this study were as follows. Firstly, the participants' perspectives of design thinking activities were changed from the difficulty and ambiguity of its activity in the beginning of the process to positiveness with competence of solving authentic problem in terms of teaching practicum over time. Secondly, the participating pre-service teachers emphasized that design thinking activities helped them prepare well teaching practicum and raise understanding of students they met in the school fields. Thirdly, some research participants went through the difficulty in utilizing their products drawn from 4th phase (prototyping) of design thinking process depending on the acceptance of their guidance teachers. Fourthly, the research participants also pointed out that the design thinking was a significant activity in that they learned how to understand and communicate with their students and how to collaborate with team members and it gave an insight about the preparation for a class. Through these results, this study identified the possibility of using the design thinking process for pre-service mathematics teachers' teaching practicum. In addition, the research put forward some implications for better use of design thinking in teacher education.

Behavior of three-tube buckling-restrained brace with circumference pre-stress in core tube

  • Li, Yang;Qu, Haiyan;Xiao, Shaowen;Wang, Peijun;You, Yang;Hu, Shuqing
    • Steel and Composite Structures
    • /
    • v.30 no.2
    • /
    • pp.81-96
    • /
    • 2019
  • The behavior of a new Three-Tube Buckling-Restrained Brace (TTBRB) with circumference pre-stress (${\sigma}_{{\theta},pre}$) in core tube are investigated through a verified finite element model. The TTBRB is composed of one core tube and two restraining tubes. The core tube is in the middle to provide the axial stiffness, to carry the axial load and to dissipate the earthquake energy. The two restraining tubes are at inside and outside of the core tube, respectively, to restrain the global and local buckling of the core tube. Based on the yield criteria of fringe fiber, a design method for restraining tubes is proposed. The applicability of the proposed design equations are verified by TTBRBs with different radius-thickness ratios, with different gap widths between core tube and restraining tubs, and with different levels of ${\sigma}_{{\theta},pre}$. The outer and inner tubes will restrain the deformation of the core tube in radius direction, which causes circumference stress (${\sigma}_{\theta}$) in the core tube. Together with the ${\sigma}_{{\theta},pre}$ in the core tube that is applied through interference fit of the three tubes, the yield strength of the core tube in the axial direction is improved from 160 MPa to 235 MPa. Effects of gap width between the core tube and restraining tubes, and ${\sigma}_{{\theta},pre}$ on hysteretic behavior of TTBRBs are presented. Analysis results showed that the gap width and the ${\sigma}_{{\theta},pre}$ can significantly affect the hysteretic behavior of a TTBRB.

STATUS OF THE ASTRID CORE AT THE END OF THE PRE-CONCEPTUAL DESIGN PHASE 1

  • Chenaud, Ms.;Devictor, N.;Mignot, G.;Varaine, F.;Venard, C.;Martin, L.;Phelip, M.;Lorenzo, D.;Serre, F.;Bertrand, F.;Alpy, N.;Le Flem, M.;Gavoille, P.;Lavastre, R.;Richard, P.;Verrier, D.;Schmitt, D.
    • Nuclear Engineering and Technology
    • /
    • v.45 no.6
    • /
    • pp.721-730
    • /
    • 2013
  • Within the framework of the ASTRID project, core design studies are being conducted by the CEA with support from AREVA and EDF. The pre-conceptual design studies are being conducted in accordance with the GEN IV reactor objectives, particularly in terms of improving safety. This involves limiting the consequences of 1) a hypothetical control rod withdrawal accident (by minimizing the core reactivity loss during the irradiation cycle), and 2) an hypothetical loss-of-flow accident (by reducing the sodium void worth). Two types of cores are being studied for the ASTRID project. The first is based on a 'large pin/small spacing wire' concept derived from the SFR V2b, while the other is based on an innovative CFV design. A distinctive feature of the CFV core is its negative sodium void worth. In 2011, the evaluation of a preliminary version (v1) of this CFV core for ASTRID underlined its potential capacity to improve the prevention of severe accidents. An improved version of the ASTRID CFV core (v2) was proposed in 2012 to comply with all the control rod withdrawal criteria, while increasing safety margins for all unprotected-loss-of-flow (ULOF) transients and improving the general design. This paper describes the CFV v2 design options and reports on the progress of the studies at the end of pre-conceptual design phase 1 concerning: - Core performance, - Intrinsic behavior during unprotected transients, - Simulation of severe accident scenarios, - Qualification requirements. The paper also specifies the open options for the materials, sub-assemblies, absorbers, and core monitoring that will continue to be studied during the conceptual design phase.

A study on the Development of BIM-based Quality Pre-checking System in Architecture Design Phase

  • Shin, Jihye;Choi, Jungsik;Kim, Inhan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.284-288
    • /
    • 2015
  • Recently, the mandate on utilizing BIM implemented by public institutions of many countries has great impact on the significantly increasing practices of BIM. The improvement of work efficiency and productivity, which is occurred by BIM adoption, depends on the consistency and accuracy of data. To maximize the benefit of BIM, the interests in BIM data quality have been enlarging all over the world. The BIM data quality pre-check, which is conducted by designer in the design phase, offers opportunities for quality improvement by continuously assessing BIM data. However, BIM quality pre-check is being conducted under arbitrary interpretation of users because of the absence of specific review factors and assessment methods for checking BIM quality. The purpose of this study is to establish an automated BIM quality pre-checking system to improve BIM design quality effectively and efficiently. It could be expected to meet the owner's requirements and to minimize the cost and time occurred additionally from revising and reproducing data by constructing consistency and accuracy of it.

  • PDF

IEEE 1500 Wrapper Design Technique for Pre/Post Bond Testing of TSV based 3D IC (TSV 기반 3D IC Pre/Post Bond 테스트를 위한 IEEE 1500 래퍼 설계기술)

  • Oh, Jungsub;Jung, Jihun;Park, Sungju
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.1
    • /
    • pp.131-136
    • /
    • 2013
  • TSV based 3D ICs have been widely developed with new problems at die and IC levels. It is imperative to test at post-bond as well as pre-bond to achieve high reliability and yield. This paper introduces a new testable design technique which not only test microscopic defects at TSV input/output contact at a die but also test interconnect defects at a stacked IC. IEEE 1500 wrapper cells are augmented and through at-speed tests for pre-bond die and post-bond IC, known-good-die and defect free 3D IC can be massively manufactured+.

Design and Performance Analysis of Pre-Distorter Including HPA Memory Effect

  • An, Dong-Geon;Lee, Il-Jin;Ryu, Heung-Gyoon
    • Journal of electromagnetic engineering and science
    • /
    • v.9 no.2
    • /
    • pp.71-77
    • /
    • 2009
  • OFDM(Orthogonal Frequency Division Multiplexing) signals sutler serious nonlinear distortion in the nonlinear HPA(High Power Amplifier) because of high PAPR(Peak Average Power Ratio). Nonlinear distortion can be improved by a pre-distorter, but this pre-distorter is insufficient when the PAPR is very high in an OPFDM system. In this paper, a DFT(Discrete Fourier Transform) transform technique is introduced for PAPR reduction. It is especially important to consider the memory effect of HPA for more precise predistortion. Therefore, in this paper, we consider two models, the TWTA(Traveling-Wave Tube Amplifier) model of Saleh without a memory effect and the HPA memory polynomial model that has a memory effect. We design a pre-distorter and an adaptive pre-distorter that uses the NLMS(Normalized Least Mean Square) algorithm for the compensation of this nonlinear distortion. Without the consideration of a memory effect, the system performance would be degraded, even if the pre-distorter is used for the compensation of the nonlinear distortion. From the simulation results, we can confirm that the proposed system shows an improvement in performance.

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

Cable layout design of two way prestressed concrete slabs using FEM

  • Khan, Ahmad Ali;Pathak, K.K.;Dindorkar, N.
    • Computers and Concrete
    • /
    • v.11 no.1
    • /
    • pp.75-91
    • /
    • 2013
  • In this paper, a new approach for cable layout design of pre-stressed concrete slabs is presented. To account the cable profile accurately, it is modelled by B-spline. Using the convex hull property of the B-spline, an efficient algorithm has been developed to obtain the cable layout for pre-stressed concrete slabs. For finite element computations, tendon and concrete are modelled by 3 noded bar and 20 noded brick elements respectively. The cable concrete interactions are precisely accounted using vector calculus formulae. Using the proposed technique a two way prestressed concrete slab has been successfully designed considering several design criteria.

Pulsation According to Pre-Compression Sections and Valve Plate Design for a Swash Plate Type Piston Pump (사판식 피스톤 펌프의 밸브 플레이트 설계와 예압에 따른 맥동)

  • Sa, Jin-Woong;Chung, Won-Jee;Bae, Jun-Hyeong;Lee, Jeong-Min
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.25 no.1
    • /
    • pp.89-95
    • /
    • 2016
  • This study investigated the design factors of the opening area in order to consider the kinematic stability of a valve plate, conducting an analysis of the reduction effects of pressure pulsation and flow ripple depending on the design factors, using the $SimulationX^{(R)}$ (Germany) hydraulic analysis program. Further, we performed a structure analysis to confirm the kinematic stability of the valve plate in a swash plate type piston pump, and analyzed the effects of pulsation on a 1-step V-type notch, 2-step V-type notch, and 2-step U-type notch to determine the effects of pulsation reduction. Finally, we show the effectiveness of our proposed design of the pre-compression sections on a valve plate in terms of low pulsation by using the hydraulic analysis program, $SimulationX^{(R)}$.

Pre-Swirl Duct of Fuel Oil Saving Device Design and Analysis for Ship (선박용 연료절감장치 Pre-Swirl Duct의 설계 및 평가방법 연구)

  • Shin, Hyun-Joon;Lee, Kang-Hoon;Han, Myung-Ryun;Lee, Chang-Yul;Shin, Sung-Chul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.3
    • /
    • pp.145-152
    • /
    • 2013
  • Recently, with oil price jumping and environmental issues, Green ship is paid deep attention to by ship owner, operator, builder, class and government. Fuel efficiency and reduction of $CO_2$ emissions are expected to have a strong influence on the design and operation of merchant ships. Many ship owners and operators are seeking the more economic method by the best operating route and the application of reliable and effective energy saving devices. With the Energy Efficiency Design Index (EEDI) in 2013 attention will more than ever be focused at achieving maximum fuel economy in the hydrodynamic design of hull forms, their appendages and propellers. IMO requirements for $CO_2$ emission for ships will now be implemented for vessels ordered from 1st January 2013. So far, a lot of new idea and patents have been proposed, tested, claimed and applied for various kinds of ship type. This paper shows numerical and experimental work related to a study on a energy saving devices particularly for fuller ship such as merchant vessel of Tanker and Bulker. From the bare hull wake measurements, typical upper/lower asymmetry of hull wake at the propeller disk was found. The pre-swirl duct have been designed and reviewed to recover the loss of propeller running in that condition. The general function of the pre-swirl duct was set to work against this asymmetry of wake and generate pre-swirled flow into the propeller against the propeller rotating direction.