This paper deals with how to apply PBL(Problem-based learning model) model to interdisciplinary field such as engineering accounting. The PBL approach can provide a solution about educational issue for engineering accounting with a systematic view. A web-based practice system, which is a core element of PBL model and a learning object and practical exercise for engineering students, is developed.
Enterprise resource planning(ERP) in nature entails large scale business process redesigns and the corresponding risks. To reduce such risks, enterprise modeling(EM) approach could be adopted through which ERP is planned and effectively implemented on a consistent basis throughout the entire organization. The scope of this paper is to report on EM experiences and lessons learned in the process of ERP implementation. Through a case study, this paper presents and EM methodology which takes due account of strategic business processes, information flows, organizational requirements, and their interdependencies. To assess the impact of distributed application scenarios on effective ERP implementation, alternative EMs have been created and evaluated whether they support information requirements for strategic decisions and day-to-day operational activities, core business processes, and business functions as required. Practical issues and problems raised in the EM process have been discussed.
Recently ERP(Enterprise Resource Planning) package has been on of important issues in developing information systems in many Korean companies. The main objectives of this study are to analyse the case of implementing ERP system in Samsung Display Devices Co. which is rated to be successful, and to derive significant implications for effective ERP implementation. First, this study focused on showing the detailed roadmap of performing ERP implementation project which largely consists of 5 stages(planning and organizing, visioning. process redesign and mapping, testing and arrangement, and installation and roll-out to overseas subsidiaries), and explaining key activities in each stage. Second, the performance of this project was evaluated on the basis of both process-centered critieria and result-centered ones. Finally, this study intended to discuss and explicate the bottlenecks and the critical success factors in implementing this project. The findings of this case study are thought not only to be useful as a practical guideline in carrying out ERP implementation project but also to provide significant basis for constructing the theoretical framework of effective ERP implementation.
Journal of the Korean Operations Research and Management Science Society
/
v.3
no.2
/
pp.47-74
/
1978
This paper reviews the zero-base budgeting whose concept was developed in the late 1960's, and applied to the actual budgeting situations in the early 1970's. Since then, it has been expanded to become one of major tools in corporate planning and control system. The primary purpose of this review is to clarify the followings: 1) concept of zero-base budgeting and its history, 2) relationships among zero-base budgeting, planning and program evaluation, 3) comparison of zero-base budgeting with other budgeting techniques, and 4) implementation procedure. Some discussions are also provided with respect to the practical implications of zero-base budgeting, its advantages and disadvantages, and others. Finally, the possibility of actual application in a local setting is investigated.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.107-114
/
2002
As many software tools are used for managing construction projects, integration of their data and information is gradually becoming critical. Focusing on the integration of design and scheduling data, a generic scheduling information model is designed through this research, with appropriate consideration for past research results on construction information model and also object oriented CAD technology. In order to test the practical usage of this model, a small prototype system which can derive schedule information from the design information is implemented.
Due to the trend of evolution toward a broadband communication network with fiber-optics, the design and operation of fiber-optic network have been received a great deal of research attention recently. Furthermore, even a single fiber link failure in the network may result in severe service loss. Thus, the network survivability becomes an importantissue in planning and designing the network. This survey is on modelling of various fiber-optic subscriber loop network(FSLN) design problems, which are essential ones for providing broadband communication services and B-ISDN services. Models are classified and investigated as either conventional decomposition-iteration approach or integrated design method. To build survivable networks, SHR models are also suggested by ring control schemes. The result of this study will be effectively applied to build a design model for FSLN in the practical applications.
Proceedings of the Korean Operations and Management Science Society Conference
/
2000.10a
/
pp.167-170
/
2000
This paper is concerned with development of a performance evaluation model for material handling system in cellular manufacturing system based on multi-attributes analysis method. We used the AHP(analytic hierarchy process) and fuzzy set ranking methodologies to overcome the special decision problems; those of multi -objective, multi-criterion, and multi-attributes. We proposed a 3-step approaches and we developed a systemic and practical computer program to solve the problems in the proposed methods. Computational experiments are then performed to cellular manufacturing system and show the effectiveness of the proposed model.
Proceedings of the Korean Operations and Management Science Society Conference
/
2004.05a
/
pp.311-314
/
2004
The 2 DBPP(Two-Dimensional Bin Packing Problem) is a problem of packing each item into a bin so that no two items overlap and the number of required bins is minimized under the set of rectangular items which may not be rotated and an unlimited number of identical rectangular bins. The 2 DBPP is strongly NP-hard and finds many practical applications in industry. In this paper we discuss a tabu search approach which includes tabu list, intensifying and diversification strategies. The HNFDH(Hybrid Next Fit Decreasing Height) algorithm is used as an internal algorithm. We find that use of the proper parameter and function such as maximum number of tabu list and space utilization function yields a good solution in a reduced time. We present a tabu search algorithm and its performance through extensive computational experiments.
Proceedings of the Korean Operations and Management Science Society Conference
/
2005.05a
/
pp.1020-1025
/
2005
The set covering(SC) problem has many practical application of modeling not only real world problems in civilian but also in military. In this paper we study optimal allocation model for maximizing utility of consolidating old fashioned and new air defense weapon system like Patriot missile and develop the new computational algorithm for the SC problem by using simulated annealing(SA) algorithm. This study examines three different methods: 1) simulated annealing(SA); 2) accelerated simulated annealing(ASA); and 3) selection by effectiveness degree(SED) with SA. The SED is adopted as an enhanced SA algorithm that the neighboring solutions could be generated only in possible optimal feasible region at the PERTURB function. Furthermore, we perform various experiments for both a reduced and an extended scale sized situations depending on the number of customers(protective objective), service(air defense), facilities(air defense artillery), threat, candidate locations, and azimuth angles of Patriot missile. Our experiment shows that the SED obtains the best results than others.
Korean Journal of Construction Engineering and Management
/
v.5
no.1
s.17
/
pp.114-123
/
2004
Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.